Appeal 3275841
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
proposed new side extension to create a new ground floor utility room, first floor study and a new staircase extension to the existing roof which it is proposed to convert to create two bedrooms and a shower room.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
On 20 July 2021 the Government published a revised version of the National Planning Policy Framework (the Framework). The main parties have been provided with a further opportunity to make submissions in respect of the publication and any comments received have been addressed in this decision.
Section 05
Main Issue
The effect of the proposed development upon the character and appearance of the host dwelling and the street scene.
Section 06
Reasons for the Recommendation
Although variously extended and altered, the dwellings along the same side of [address] as No 21 are similar in scale and character with some variation in the detailed appearance of each dwelling. These detached and semi-detached dwellings typically have a projecting two-storey bay window feature and have hipped roofs with relatively large chimneys, which give the street scene a consistent rhythm. The dwellings on the opposite side of [address] vary in appearance but mostly have hipped roofs which is a consistent characteristic of the dwellings locally. The spacious gaps between the properties, particularly at roof level, contribute positively to the suburban character of the area.
The proposed side extension would continue the ridge height and pitch of the existing dwelling but together with the roof extension to the other side would significantly increase the scale and bulk of the roof. This larger roof would dominate the scale of the dwelling and erode the prominence of the two-storey projecting bay window as an important feature which characterises the dwellings in this stretch of road. By extending the roof to both sides and introducing half-hipped ends, the proposal would significantly and harmfully alter its form and close the gap between No 21 and its neighbours. Consequently, the roof form would appear distinctly out of character in this street scene, where hipped roofs and gaps between dwellings give a sense of spaciousness at roof level and contribute to the suburban character of the area.
The proposed porch would extend forward of the main part of the house and while set behind the bay window, it would start to compete with it in prominence on the front elevation, particularly given the extent of glazing proposed. [name] appreciate the desire to re-use an existing decorative window, the large stairwell window proposed in an dormer breaking the eaves would be out of scale and alignment with the existing first floor windows and the other proposed front dormer, appearing as an incongruous feature.
The other proposed front dormer would be built in-line with the windows below it and would appear proportionate to the roof slope. The rooflights would have limited impact given their small scale and high positioning. However, the three rear dormer windows proposed would be of a significantly greater scale and as a group they would dominate the rear roof slope and appear overscaled in relation to it. Additionally, two would be wider than the windows below, and out of line with them. As a result, they would be contrary to the advice within the Design Supplementary Planning Document (SPD) (2020), which identifies that dormers should match the window style and roof pitch of the existing property.
The proposed side extension would be screened by the bay window when approaching the dwelling along [address], however the enlargement of the roof would be readily appreciated, as shown by the appellant’s streetscape drawing. For the reasons set out above, the extensions would significantly and harmfully alter the character and appearance of the dwelling when seen from that road and the resulting dwelling would appear as an alien and incongruous alteration to the street scene.
The proposed enlargement of the roof and rear dormer windows would also be clearly visible from [address] to the rear. From that viewpoint the incongruous scale and appearance of the roof would harm the character and appearance of both the dwelling and the street scene.
While the chimney on the flank wall of the bay window would be retained and matching materials would be used, this would not be sufficient to overcome the harm resulting from the design, scale and massing of the proposed extensions.
Therefore, the proposed development would harm the character and appearance of the host dwelling and the street scene. Consequently, the proposal would be contrary to Policy S2 of the Quorn Neighbourhood Plan 2018 – 2036 (made 2019), Policy CS2 of the Charnwood Local Plan 2011 to 2028 [name] (adopted 2015) and Saved Policy EV/1 of the Borough of Charnwood Local Plan 1991 – 2006 (adopted 2004). Together these require development to respect and enhance the character or appearance of the area, having regard to, amongst other things, scale and massing; and to be of a design, layout, scale and mass that is compatible with the locality and neighbouring buildings and spaces.
Although not mentioned in the Council’s reason for refusal, both the Council’s officer report and the appellant’s evidence refer to Saved Policy H/17 of the Local Plan and I have been provided with a copy of it. Relating specifically to extensions to dwellings it sets out four criteria to be met for permission to be granted. While the proposal would not harm the amenities of neighbours or result in the loss of landscaping, for the reasons set out above it would not remain compatible in scale, mass or design with the original dwelling and would appear as an incongruous feature in the street scene. Therefore, it would not meet all four criteria and would not be supported by that Policy.
Furthermore, the proposal would be contrary to the advice contained within the SPD and would not accord with the Framework which states that development should function well and add to the overall quality of the area.
Section 07
Other Matters
[name] note the need for a larger family home, it has not been demonstrated that the proposed scheme would be the only scheme that could deliver this benefit, which would be a private benefit for the appellant and their family. The appellant suggests that loft conversions can be permitted development, however it has not been demonstrated that a similarly scale of development could be carried out as permitted development. Therefore, I afford these matters very little weight.
Other properties in the street have been extended in various ways, however they have not significantly altered its character and the largely consistent roof forms. Therefore, these other extensions do not justify the harm that would result from the appeal proposal.
Section 08
Conclusion and Recommendation
There are no material considerations that indicate that the proposal would be determined other than in accordance with the development plan. For the reasons given above, the proposal would not accord with the development plan as a whole and, having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and, on that basis, I agree with the recommendation and shall dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 133No official casework-database value to compare
- Extracted decision date · page 1
- 21 December 2021Matches the official casework database
- Extracted site visit dates
- 7 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3275841
- Application reference
- P/21/0514/2
- Lead case reference
- Not recorded
- Planning authority
- Charnwood Borough Council
- Planning authority code
- E07000130
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 70 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 May 2021
- Valid date
- 2 June 2021
- Start date
- 28 July 2021
- Planning authority decision date
- 11 May 2021
- Appeal decision date
- 21 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7998
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21