Appeal 3276956
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
3 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Without the grant of planning permission the erection of two canopy structures to the front of the property.
Section 02
Decision
The appeals are dismissed and the enforcement notice is upheld.
Section 03
Preliminary Matters
The property is an extended end of terrace, 2 storey dwelling set back from the public highway with an area of hardstanding to the front. A hedge defines the boundary with the highway. The property is located on the corner of [address] and [address]. The development comprises two canopies which project from the building frontage. The smaller canopy is a lean-to constructed of timber and corrugated roofing. It extends forward to the hedge. The larger is dual pitched with gabled frontage constructed of the same materials. It extends to the highway boundary and encompasses the width of the vehicular access to the property. The appeals on ground (b) and ground (c)1
An appeal on ground (b) is a legal ground of appeal and is a claim that the matters alleged at Section 3 of the enforcement notice have not occurred as a matter of fact. The appeal on ground (c) is a claim that those matters do not constitute a breach of planning control. In pursuing an appeal on these legal grounds, the onus firmly rests with the appellant to show, on the balance of probabilities, that the matters stated in the notice have not in fact occurred and, if they have, do not constitute a breach of planning control. 1 There is significant overlap between arguments advanced on grounds (b) and (c) therefore I will combine them. Appeal Decisions APP/Z0116/C/21/3276956 and APP/Z0116/C/21/3276957
Matters relating to the planning merits of the two canopy structures in the context of the street scene or the effect of the development on occupants of neighbouring properties are not relevant to an appeal made on ground (b) or (c). Furthermore, whilst I acknowledge the appellants’ reasons for siting the structures, those arguments are more relevant as to whether planning permission should be granted. However, no appeal is made on ground (a) that planning permission should be granted, therefore I cannot take those matters into account in reaching my decision.
The term ‘building operations’ is defined for the purposes of the 1990 Town and Country Planning Act in section 55(1A) as including (a) demolition, (b) rebuilding, (c) structural alterations of or additions to buildings, and (d) other operations normally carried on by a person in business as a builder. The list is not exhaustive. Section 55(1) and (1A) should be read with regard to section 336(1) which defines a ‘building’ as including any structure or erection and any part of a building, but not plant or machinery comprised within a building.
Established case law2 identified three primary factors as being relevant to the question of what was a “building”. These are: (a) size - a building would normally be something which was constructed on site as opposed to being brought already made to the site; (b) permanence - has the structure been moved? Is it capable of being moved and, if so, how? Is it intended to be moved in practice? How long has it been, or will it be in one position? It should be noted that ‘permanence’ does not necessarily mean ‘forever or indefinitely’; (c) physical attachment – how it is it fixed to the ground? Does it need to be fixed, or will it rest by its own weight? Is it mounted on a permanent base? Is it attached to services? Has the placing of the building resulted in any physical change in the characteristics of the land?
The canopies, which are, to all intents and purposes analogous to a car port in design and purpose, are of timber construction, bolted together, with a roof covering and open sides, attached to the front elevation of the house. The structures are of considerable bulk and mass, and it is apparent by their scale that their weight would ‘fix’ them to the ground. Furthermore, the size and design of the structures suggests that they cannot easily be moved within the site, and there is no evidence to show that has happened. Overall, the canopies are a sizeable structure and display a sufficient degree of permanence, and I consider that the works carried out to construct them fall within s55(1)(A) of the 1990 Act.
For the reasons above, I consider that, on the balance of probability, the canopies comprise operational development, as alleged. Consequently, I find that the erection of the canopies is development that requires planning permission, in the absence of which the appeals on grounds (b) and (c) must fail.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 354No official casework-database value to compare
- Extracted decision date · page 1
- 22 September 2021Matches the official casework database
- Extracted site visit dates
- 9 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3276956
- Application reference
- Not recorded
- Lead case reference
- Not recorded
- Planning authority
- Bristol City Council
- Planning authority code
- E06000023
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Enforcement Notice
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- LPA's service of an Enforcement Notice
- Appeal reason
- Not recorded
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Lead
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Notice upheld
- Decision category
- Dismissed
- Received date
- 13 June 2021
- Valid date
- 16 June 2021
- Start date
- 28 June 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 22 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- 2
- Enforcement grounds
- b,c
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3612
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25