Appeal 3277074
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described in the application form as follows: “Rear canopy attachment to exsiting kitchen extension 4.5 m long , 2.6m width. Front and left side attached to existing kitchen wall extension. Tottal surface 11.7m2 Materials: wood ,stainless steel bolt anchors, [name] on top”.
Section 02
Decision
The appeal is allowed and planning permission is granted for the installation of a canopy to the rear elevation of the house, at [site address] , Southgate, London [postcode] , in accordance with the terms of the application (reference 21/00928/HOU, dated 11 March 2021), subject to the following condition: The development hereby permitted shall have been carried out in accordance with the following approved drawings: drawing number PA1 (Location Plan, Block Plan); drawing number PA2 (Roof Plan Existing, Roof Plan Proposed); drawing number PA3 ([name], [name], [name], [name]).
Section 03
Procedural matter
Since the development which is the subject of this appeal has already been carried out, the application is to be treated as one made under Section 73A of the Town and Country Planning Act 1990.
Section 04
Preliminary points
Notwithstanding the description of the application that was given in the application form, the nature of the proposal can more clearly be expressed as the installation of a canopy to the rear elevation of the house, adopting the description used in the decision notice. Appeal Decision: APP/Q5300/D/21/3277074
Section 05
Main issue
The main issue to be determined in this appeal is the effect of the proposed development on the residential amenities of neighbours (whether unacceptable harm is caused by overbearing appearance or overshadowing).
Section 06
Reasons
[address] lies within a closely built up residential area of London, with Victorian terraces laid out in an essentially rectangular street pattern. Number [site address] is a mid-terrace house, although its immediate neighbours to the west have been redeveloped in a more modern form. The appeal building has been extended in the past by the addition of a kitchen extension on the ground floor, constructed of white-painted brickwork under a flat roof, in a conventional form.
At the rear of the kitchen extension, a simple canopy has been constructed on a timber frame, roofed with corrugated plastic sheet. According to the planning application form, the canopy was constructed in July 2020. Planning permission is now sought for this structure.
Planning policies are aimed at achieving good design standards generally, which includes providing good standards of accommodation while protecting existing residential amenities. Policies in both ‘The London Plan’ and the ‘Enfield Plan Core Strategy 2010-2025’ are relevant but particular attention is to be drawn to [name] 8 and DMD11 of the ‘Improving Enfield Development Management Document’ (adopted in November 2014), since they specifically identify the need to safeguard residential amenities.
Similarly, national planning policies (as set out in the ‘National Planning Policy Framework’) also continue to emphasise the importance of achieving good design and they make it plain that new development should be sympathetic to its surroundings. The recent revisions to the ‘National Planning Policy Framework’ do not fundamentally affect these basic planning principles in the context of this appeal.
The house at number [site address] retains a modest but useful back garden and the new canopy provides a benefit to the occupiers, by creating a sheltered outdoor seating area. The simple canopy is neatly constructed on a timber frame that is inset from the side boundary with number 23 on the east and which abuts an existing projection on the west. The height of the canopy is lower than that of the adjoining kitchen extension.
The canopy would extend the depth of the footprint of number 21, in relation to the adjoining property at number 23, but the nature of the construction and the inset from the boundary significantly reduce the impact that it might otherwise have had. In this case, I am convinced that the canopy does not have a materially harmful impact on the living conditions of adjoining neighbours. It does not unduly overshadow the adjoining property, nor is the impact on neighbours’ outlook unacceptable in planning terms.
I do not condone the unlawful nature of the construction but I must consider the canopy on its merits and I have concluded that it does not conflict with the Development Plan, in principle, and that it is acceptable in planning terms. In 2 Appeal Decision: APP/Q5300/D/21/3277074 short, I am persuaded that the scheme before me can properly be permitted and, although I have considered all the matters that have been raised in the representations, I have found nothing to cause me to alter my decision.
I have, however, also considered the need for conditions and, in imposing conditions, I have taken account of the suggestions made by the Council in the usual way (without prejudice to their main arguments in the appeal). In this case, a condition to require commencement of the work within a stated period is not necessary since the development has already commenced and effectively completed. A condition is needed, however, to define the development hereby permitted by reference to the submitted drawings.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 285No official casework-database value to compare
- Extracted decision date · page 1
- 2 November 2021Matches the official casework database
- Extracted site visit dates
- 24 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3277074
- Application reference
- 21/00928/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 15 June 2021
- Valid date
- 15 June 2021
- Start date
- 2 September 2021
- Planning authority decision date
- 21 May 2021
- Appeal decision date
- 2 November 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 5453
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21