Appeal 3277306
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the ‘conversion of agricultural barn in field south of [address] to a dwellinghouse’.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
In my heading above I have taken the site address from that given on the appeal form and decision notice as it is fuller than that on the application form. In addition, the application form is dated 15 May 2020, although the Council did not receive the application until some months later.
The Government published its revised National Planning Policy Framework (the Framework) on 20 July 2021. The parties have had the opportunity to refer to the revised Framework as part of the appeal process.
Section 04
Main Issue
The main issue is whether the proposal would be permitted development, with particular regard to whether the requirements of Class Q(b) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (the Order) would be met.
Section 05
Whether the proposal would be permitted development
Class Q(b) of the Order permits building operations reasonably necessary to convert the relevant building to a use falling within Class C3 (dwellinghouses). It further states at paragraph Q.1(i) that development under Class Q(b) is not permitted if it would consist of building operations other than the installation or replacement of windows, doors, roofs or exterior walls, or water, drainage, electricity, gas or other services to the extent reasonably necessary for the building to function as a dwellinghouse.
The agricultural building that is the subject of the appeal has a utilitarian appearance comprising a timber frame, with low level block walls and corrugated metal sheeting above to three sides, and an open front (north west) elevation. The roof is clad with corrugated metal sheeting.
The structural appraisal1, prepared by a qualified engineer, concludes that the building as a whole is of a permanent and substantially sound construction, and that with a minimal amount of remedial and renovation works, it may be successfully converted into a residential dwelling. Nevertheless, the document describes the appraisal carried out as brief. The observations include that a ground slab was not apparent and that in places the timber posts are decayed and require repair and/or strengthening. Moreover, foundations could not be confirmed2.
The limited information detailing the intended building operations refer to the retention and repair of the dwarf block walls with one bay to the rear requiring reconstruction and new cavity walls with a larch cladding finish. A comparison of the existing and proposed elevational drawings3 shows that the existing dwarf wall to be retained would comprise only a small part of the walling. The majority would constitute new fabric above the low level block wall clad in larch, as well as new fenestration. The whole of the north west open elevation would be infilled with new walling. In addition, reference is made to new roof tiles, felt, battens and purlins. Based on the information before me, most of the external fabric of the building would be replaced.
Although Planning Practice Guidance (PPG) confirms that internal works are not generally development, works would also be necessary to provide appropriate insulation to the roof and walls, as well as provide internal dividing walls. These contribute to the overall building operations proposed in this case.
Moreover, although the appraisal states that where possible the existing timber posts should be retained, it does not state how many would need to be repaired, strengthened or even replaced. Furthermore, it states that a new ground bearing slab should be constructed, and the exposure of existing foundations is recommended to ensure suitability to support the proposed loads, which may require underpinning4. In addition, the [name] Assessment5 provided recommends a finished floor level considerably higher than the established floor level of the barn.
Taking these factors together, some doubt remains regarding whether the building is structurally suitable for the loads intended to be imposed. If underpinning to the foundations cannot be ruled out, this suggests operations of some significance could be necessary, which are not included in those listed in paragraph Class Q.1 (i) as being covered by Class Q(b).
PPG further advises that the permitted development right under Class Q assumes that the agricultural building is capable of functioning as a dwelling, clarifying that it is not the intention of the permitted development right to allow rebuilding work which would go beyond what is reasonably necessary for the 1 Dated 24 May 2019 prepared by TIM HB Limited 2 Paragraphs 3.1, 5.1 and 7.1 Observations 3 [name] S5861/001 & S5861/100A 4 Paragraphs 3.1, 5.1 and 7.1 Comments and Recommendations 5 Prepared by EDS dated September 2020, paragraph 4.0(1) conversion of the building to residential use. In this respect the PPG refers to relevant case law6 to which I have had regard.
The caselaw established that Class Q(b) only permits building operations necessary to convert the building, and therefore if a development does not amount to a conversion then it fails at the first hurdle, even though the building operations may fall within those listed in paragraph Q.1(i). Furthermore, whether a proposal constitutes a conversion or a rebuild is a matter of planning judgement and the nature and extent of the proposed building operations are a relevant consideration in making that assessment.
In this case, from my own observations and the information in the structural appraisal and application details, the cumulative extent of the works proposed to facilitate a residential use would be extensive. In my view, when these are taken together the works would be of such magnitude that they would go beyond what would be reasonably necessary for the conversion of the building to a residential use.
The appellant points out that the building in the Hibbitt case differed from the appeal building. It concerned a steel framed barn with concrete wall panels where the existing walls were to be removed and replaced by structural infill panels. Be that as it may, despite the appellant’s assertion that the proposal would retain the majority of the exterior walls7, most of the external fabric of the resultant building would be new. Moreover, cognisant that both parties remind me that each application should be considered on its own merits, the specific findings of the Inspector in the highlighted [address] appeal case8, which also concerned a steel framed barn with concrete wall panels is of limited relevance. Nevertheless, my overall approach is generally consistent with that Inspector.
In support of the proposal the appellant refers to another appeal decision9 which concerned a building with a timber frame and was allowed by the Inspector. However, as I only have limited information before me regarding that case, it inhibits a direct comparison. Nevertheless, as it related to a different building, the condition of the respective buildings and the individual proposals are likely to be notably different. In any event, I am required to reach my own conclusion based on the proposal and the evidence before me.
Therefore, I find that the development proposed would go beyond building operations reasonably necessary to convert the building into a dwellinghouse and as such, would not benefit from the permitted development rights under Schedule 2, Part 3, Class Q(b) of the Order.
Section 06
Conclusion
For the reasons given, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1229No official casework-database value to compare
- Extracted decision date · page 1
- 22 September 2021Matches the official casework database
- Extracted site visit dates
- 21 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3277306
- Application reference
- 2020/0972/PAA
- Lead case reference
- Not recorded
- Planning authority
- Mendip District Council *
- Planning authority code
- E07000187
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Yes
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 June 2021
- Valid date
- 18 June 2021
- Start date
- 28 July 2021
- Planning authority decision date
- 21 December 2020
- Appeal decision date
- 22 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3615
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25