Appeal 3277314
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
raising the roof to create a two storey dwelling with a first floor rear extension, the insertion of dormer windows into the front and rear elevations, the demolition of existing rear conservatory and erection of single storey rear and side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
There are discrepancies in the documentation about the site address and the appellant’s name. Therefore, I have taken the name of the appellant and the site address from the original application form.
Whilst the amended description on the appeal form appears not to have been agreed, it is more succinct, and I have used it in the banner heading above. I have determined the appeal accordingly and with regard to the submitted drawings.
The revised National Planning Policy Framework (the Framework) was published on 20 July 2021 and I have had regard to it in reaching my decision.
Section 04
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the Framework and any relevant development plan policy; • the effect on the openness and the purposes of the Green Belt; and • if the proposal is inappropriate, would the harm by reason of inappropriateness, and any other harm, be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.
Section 05
Reasons
Tinkerdale is a detached bungalow facing [address] in Brookhouse. The bungalow has a long elevation to the road frontage with a limited depth. The plot is similarly proportioned so that the bungalow is relatively close to the street frontage with its main garden area located to the western side. Vehicular access to a detached garage and parking area is at the eastern end of the frontage with the remainder of the front boundary defined by mature hedging.
Section 06
Whether inappropriate development
The Framework establishes that new buildings within the Green Belt are inappropriate subject to a number of specified exceptions. This includes the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.
Policy CS4 of the Rotherham Local Plan Core Strategy 2013 – 2028 (CS) establishes that land within the Rotherham Green Belt will be protected from inappropriate development as set out in national planning policy. Policy SP4 of the Rotherham Local Plan Site and Policies document (RLPSP) is similarly worded to the Framework in relation to extension and alteration of a building but identifies that increases in excess of 33% in the external volume of the original building would make the proposal disproportionate.
The ‘original building’ is defined as a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally. The Council identifies that the proposed development would result in a volume increase when taken together with previous extensions of 171%, well in excess of the 33% set out in Policy SP4. The percentage increase is not disputed by the appellant and on this basis the proposals would be inappropriate development in the Green Belt.
Even so, the appellant notes that the Framework is silent on what is disproportionate and refers to the design complying with Policy SP4 where it considers the size and scale of any such extensions or alterations to existing buildings.
The proposal would include increasing the height of the building, significant alterations to the design of the roof including sizable dormer windows to the front and rear and a rear first floor extension that would cut across the eaves line. The dormer windows and first floor extension take up a considerable portion of the roof and when taken together with the increase in height of the building, the size and scale of the additions to the roof of the bungalow would appear disproportionate compared to the existing roof form.
Therefore, the appeal scheme would result in disproportionate additions over and above the size of the original building and would be inappropriate development in the Green Belt in conflict with Policy CS4 of the CS and Policy SP4 of the RLPSP. Policy SP2 of the RLPSP and the Framework confirm that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances.
Section 07
Openness and purposes of Green Belt
The Framework advises that openness and permanence are the essential characteristics of the Green Belt. Openness is the absence of development and it has both spatial and visual aspects.
The proposed increase in the roof height and alterations to its form and the ground floor additional area would introduce further development on to the site, increasing the dwellings footprint and mass. Due to the existing dwelling being close to the site frontage, and the rear being visible from [address], the increase in the dwelling’s footprint and mass would result in a small loss of visual and spatial openness.
With respect to the purposes of Green Belt, the development would be contained within the boundaries of the residential property and therefore would not lead to encroachment into the countryside. Nor would it represent sprawl or urbanisation and I find no conflict with the purposes of Green Belt.
Section 08
[name]
Whilst the extensions may provide an opportunity to improve the thermal efficiency of the building there is no evidence that thermal improvements cannot be achieved in any case. This matter is therefore a neutral factor.
I attach a small amount of positive weight to the social benefits associated with improving the living accommodation for the occupants of the property where this could allow care to be provided for family members.
The appellant has brought to my attention that the site benefits from permitted development rights and indicates that this is a fallback position. However, I have no information before me about a proposed scheme to utilise permitted development, and therefore a detailed comparison with the case before me cannot be made. Additionally, there is no evidence that the fallback position is a greater than theoretical possibility or that if the appeal is dismissed a fallback would be pursued. As a consequence, I find the suggested fallback is neutral in the determination of the appeal.
My attention has been drawn to a recent development opposite the appeal site where the erection of new dwellings, said to be of an equivalent volume to a previous building on the site, was supported. Nevertheless, in this case there is no disagreement that the volume of the building is being increased by a substantial amount from its original size and therefore that development does not lead me to a different conclusion on the appeal proposal.
Section 09
Green Belt Balance and Conclusion
I have found that the proposal would be inappropriate development in the Green Belt. It would also result in a small loss of openness of the Green Belt. Any harm to Green Belt attracts substantial weight.
The harm by reason of inappropriateness, and any other harm, is not clearly outweighed by the other considerations set out above. Therefore, the very special circumstances necessary to justify the proposal do not exist.
Overall, for the reasons given above, the proposal conflicts with the development plan and there are no material considerations, including the Framework, that would outweigh that conflict. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 435No official casework-database value to compare
- Extracted decision date · page 1
- 7 December 2021Matches the official casework database
- Extracted site visit dates
- 30 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3277314
- Application reference
- RB2021/0836
- Lead case reference
- Not recorded
- Planning authority
- Rotherham Metropolitan Borough Council
- Planning authority code
- E08000018
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 112 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 June 2021
- Valid date
- 18 June 2021
- Start date
- 27 September 2021
- Planning authority decision date
- 9 June 2021
- Appeal decision date
- 7 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7182
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21