Appeal 3277572
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a single storey detached rear extension
Section 02
Decision
The appeal is allowed, and prior approval is not required under the provisions of Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for the erection of a single storey detached rear extension at [site address] in accordance with the terms of the application Ref 21/0455, dated 28 April 2021, and the plans submitted with it.
Section 03
Procedural Matters
[name].4 of Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (GDPO), states that the local planning authority may refuse a prior approval application where the proposed development does not comply with any conditions, limitations or restrictions applicable to the development in question. The Council consider that the proposal fails to comply with category J(iii) and Ja and it is on this basis that the Council refused the application. No determination regarding prior approval was made.
During the appeal process, at my request, the Council undertook consultation with adjoining neighbours. As no representations were received, prior approval is not required in respect of the impact of the development on the amenity of adjoining occupiers.
Section 04
Main Issue
The main issue is whether the proposal is permitted development under Schedule 2, Part 1 Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended.
Section 05
Reasons
Class A of the GDPO enables the enlargement, improvement or other alteration of a dwelling house provided certain criteria are met. The appeal property has a number of single storey extensions to the rear. The proposal comprises a further single storey rear extension extending approximately 5.35 metres from the original rear elevation of the house with a maximum eaves height of around 2.99 metres. The submitted plan shows a gap of around 150 mm between the proposed extension and the existing side utility extension, demonstrating that they are not physically joined. The proposal would have a separate load bearing wall and has no direct access to the garage or toilet from the house.
The Council argue that the gap would not constitute a material change in the appearance to the rear of the property and that the extension, together with the existing side extension should be considered as one structure.
Looking at the rear elevation of the property, the 150mm between the existing and proposed extensions would provide a gap demonstrating the two extensions are not joined. [name] note that the gutter of the proposed extension would just overlap the existing extension, this does not in my view, alter the clear visual separation between the two extensions. [name] accept the gap would be minimal it would be clear that the extensions are freestanding and not joined, connected, or linked in any way.
I take account of the numerous appeals that have been brought to my attention by both the Council and the Appellant. The Council point to a case where a full width detached building to the rear of a dwelling had a 250mm gap, with the proposed doors adjacent to doors in the rear of the dwelling1. It was concluded that the detached building was an extension. This case is not completely comparable to the case before me here as it appears that the proposal was going to be used as an extension to the house with direct access between the two.
The Appellant refers to several Lawful Development Certificate appeals where the small gaps being proposed, were considered as a matter of fact and degree, to demonstrate that the buildings were not attached. Again, these cases are not completely similar to this appeal as they relate to whether the outbuildings proposed would form development ancillary to the enjoyment of the dwelling house and should be considered under Class E of the GDPO or whether they formed an enlargement to the dwelling house and should be considered under Class A. Nevertheless, they are relevant in establishing whether two structures should be considered to be joined if there is a minimal gap between them.
The Permitted Development Rights for Householders Technical Guidance 2019 refers to situations where there is more than one extension. It outlines that under paragraph Ja of the GDPO, the size of the total enlargement (being the proposed extension together with the previous extension to which it will be joined) will be taken into account. In this case as I have found the extensions would not be attached, the total enlargement would not be more than half the width of the original house. It would therefore accord with both paragraphs J(iii) and Ja of the GDPO. 1 Appeal ref APP/Q5300/X/19/3228822
I acknowledge that the provision of a gap may be seen to be a way to get round the limitations of the GDPO. Nevertheless, based on the evidence before me, I conclude that the proposal forms permitted development under Article 3(1) and Schedule 2, Part1, Class A, of the GDPO.
The Council have suggested planning conditions in their questionnaire. In accordance with the GPDO, development must be completed within three years of the date of this decision and in compliance with the approved plans, so it is not necessary to repeat those conditions in this decision. [name].3 of the GDPO requires that materials used in the exterior work shall be of a similar appearance to those used in the construction of the exterior of the existing dwelling. A planning condition is therefore not necessary.
Section 06
Conclusion
For the reasons given above, and having had regard to all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1793No official casework-database value to compare
- Extracted decision date · page 1
- 24 February 2022Matches the official casework database
- Extracted site visit dates
- 31 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3277572
- Application reference
- 21/0455
- Lead case reference
- Not recorded
- Planning authority
- Blackpool Borough Council
- Planning authority code
- E06000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 31 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 22 June 2021
- Valid date
- 22 June 2021
- Start date
- 2 September 2021
- Planning authority decision date
- 1 June 2021
- Appeal decision date
- 24 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 11144
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21