Skip to main content
Official casework recordDismissedCurrent release

Appeal 3278248

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘retrospective to agree works for dormers with windows, rear terrace and rear extension’.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    At my site visit I observed that a dormer and a rear terrace/platform, above a rear extension, have been erected in a manner consistent to that shown on the proposed plans subject to the Council’s decision. As such, I have assessed the appeal on the basis that the proposal has been carried out, notwithstanding the proposed further alterations concerning the operation of the dormer windows and the erection of screening along the flanks of the terrace/platform.

    The appellant has asserted that the dormer does not require permission as it is permitted development (PD) pursuant to Schedule 2, Part 1, Class B of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO). Within the context of an appeal made under section 78 of the Act, it is not within my remit to formally determine whether or not that is the case. However, I shall consider the evidence as to whether permission is required so far as it is material to this appeal proposal.

    If the appellant wishes to ascertain whether development at the site is or would be lawful, they may make an application under sections 191 or 192 of the Act. Any conclusions I reach are for the purposes of the current appeal only and do not prejudice any future application for a lawful development certificate and/or, if it were to become relevant, any enforcement proceedings.

  3. Section 04

    Application for Costs

    An application for costs was made by [name] against Torbay Council. This application is the subject of a separate decision.

  4. Section 05

    [name]

    The main issues are the effect of the proposal on (i) the character and appearance of the area and (ii) the living conditions of the occupants of neighbouring properties, with reference to privacy and light.

  5. Section 06

    Character and appearance

    [site address] is a two-storey property fronting a private highway. The land it occupies rises steeply southwards away from the highway, and its rear garden is terraced, reaching heights which are roughly level to and above the roof of the dwelling. Whilst there are a variety of building types and heights across the street, and limited examples of dormers, there is also a discernible characteristic of traditional and well-proportioned pitched and hipped roofs.

    The dormer protrudes across the rear and much of the flank roofslopes of the dwelling. There is little set back from the eaves and it rises to the height of the house, immersing its ridge with a singular flat roof. The result is a substantial roof enlargement which is harmfully top heavy and protuberant, which fails to respond respectfully to the intended design and proportions of the building. This is exaggerated by the elevation of the dwelling above the highway and the way that the outline of the dormer appears against the sky.

    I therefore conclude on this issue that the proposal has an unacceptable effect on the character and appearance of the area. It conflicts with the visual and design aims of Policies DE1 and DE5 of the Torbay Local Plan 2021-2030 (adopted 2015) (TLP), Policy PNP1(c) of the Paignton Neighbourhood Plan (,made 2019) and the National Planning Policy Framework (the Framework).

  6. Section 07

    Living conditions

    The topography along [address] has led to high levels of mutual overlooking between private spaces, including from the upper echelons of garden areas into neighbouring dwellings. Within this context, whilst overlooking would be possible from the windows within the dormer, I am satisfied that this could be restricted to acceptable levels through the retention of the obscure glazing and by significantly restricting how and to what extent the windows can open. Unacceptable overlooking from the elevated terrace/platform would be prevented by the tall screening which would bound it. These measures could be secured by the use of conditions.

    Trees within gardens, the upward slope of the land itself, and the presence of houses set atop the ridge to the south along [name] are likely to already reduce the amount of light receive to the [address] housing. The proposal would not have a significant effect beyond this established situation. Light pollution emitted from the windows would be modest and acceptable.

    On this basis, I conclude on this issue that the proposal would have an acceptable effect on the living conditions of the occupants of neighbouring properties, with reference to privacy and light. It would accord with the relevant aims of Policy DE3 of the TLP and the Framework.

  7. Section 08

    [name]

    The dormer contains windows which open sideways less than 1.7m above the floor of the room in which they are installed. This is precluded by Schedule 2, Part 1, Class B.2 (c) (ii) of the GPDO. From the proposed plans and my own observations on site, the dormer looks to have broken forward of the uppermost part of the apex of the front roofslope of No 9. Although this appears to be by a modest degree, such works are also precluded under Class B.1 (c). The platform/terrace is linked to and directly accessed from the dormer and I consider it to be an integral part of the dormer development, given that it functions as a necessary means of escape. This leads the proposal to also likely fall within the preclusion for such set out by Class B.1 (e).

    The appellant has referred to revised drawings which postdate the Council’s decision, and which may serve to clarify the status of the dormer in relation to the GPDO. However, these drawings have not been provided. The evidence that is before me draws the conclusion that, regardless of its volume, the dormer is unlikely to comprise PD. Consequently, and with regard to relevant case law1, I am not convinced that lawfulness of the dormer pursuant to PD rights is a real prospect. For these reasons, this is a fallback position which is of limited weight in my assessment. I also recognise the personal circumstances of the appellant and family, and the desire to resolve the situation with the dormer. This matter is further apportioned limited weight in favour of the scheme.

  8. Section 09

    Planning Balance

    The harm to the character and appearance of the area is a matter to which I attribute significant weight, and which brings the scheme into conflict with the development plan when read as a whole. The other considerations in favour of the scheme do not outweigh this conflict.

  9. Section 10

    Conclusion

    For the reasons outlined above, and taking all other matters raised into account, I conclude that the appeal should be dismissed,

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 255No official casework-database value to compare
    Extracted decision date · page 1
    18 November 2021Matches the official casework database
    Extracted site visit dates
    3 November 2021 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 255No official casework-database value to compare
    Extracted decision date · page 1
    18 November 2021Matches the official casework database
    Extracted site visit dates
    3 November 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3278248
Application reference
P/2021/0053
Lead case reference
Not recorded
Planning authority
Torbay Council
Planning authority code
E06000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
2 July 2021
Valid date
2 July 2021
Start date
6 October 2021
Planning authority decision date
13 April 2021
Appeal decision date
18 November 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
6251
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21