Appeal 3278289
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
bi-fold driveway gates.
Section 02
Decision
The appeal is allowed and planning permission is granted for proposed bi-fold driveway gates, at [site address] , Bayton, Worcestershire [postcode] in accordance with the terms of the application, Ref 20/02024/HP, dated 18 December 2020, and the plans submitted with it, subject to the following
Section 03
conditions:
The development hereby permitted shall begin no later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 21-02-01, 21-02-01A, 21-02-03.
Section 04
Preliminary Matters
Gates and posts are in place at the site. Whilst they appear to broadly accord with the submitted plans in terms of their design and position, I saw that there are some detailed deviations. As a result, in reaching my decision, I have assessed the development as shown on the submitted plans and not as built on site.
The Council’s decision notice refers to plan 21-02-03A, but the Council has confirmed that 21-02-03 is the relevant plan on which it made its decision. I have considered the appeal on this basis.
Section 05
Main Issue
The main issue is the effect of the proposal on highway safety.
Section 06
Reasons
The appeal driveway is located on a rural lane within the village. The site entrance is close to a sharp bend and junction. The lane has no pavement and there are many driveways and entrances nearby, some with restricted visibility for drivers when joining the lane. My visit only represents a snapshot in time, but I saw that traffic flow was low and that vehicle drivers exercised caution when using the lane past the appeal site, because of the constraints of the lane.
The driveway has a short length, and the gates would not be positioned five metres back from the adjoining carriageway edge. As such, it is likely that a vehicle entering or leaving the driveway would wait at least partially within the carriageway whilst the gates are opened or closed, somewhat reducing the forward visibility of vehicles using the lane. However, there is a small verge for a vehicle to pull-into whilst the gates are operated, limiting the extent of obstruction caused by a waiting vehicle.
Furthermore, even without the gates, a vehicle entering or leaving the driveway here has to manoeuvre within the carriageway, to which road users already have to react. In the quiet, rural context of the site, I consider that the small additional amount of time that a vehicle would be present on the highway, whilst the gates are operated, would not result in an unacceptable risk to road users. In addition, the gates would assist in reducing the risk of children or animals at the appeal site from stepping into the road, resulting in a moderate highway safety benefit.
The gates would be bi-fold in design, allowing for inwards opening, avoiding any obstruction within the lane from the gates themselves. The gates and posts would also be set behind or flush with the hedge and building either side, and so would have little effect on the visibility of vehicle drivers using the access.
I have carefully considered the views of the Highway Authority, but for the reasons set out above, I conclude that the proposal would not harm highway safety. It would therefore comply with policies SWDP4 and SWDP21, which require that proposals address road safety, and that vehicular traffic can safely access the highway. For the same reasons, it would also comply with the National Planning Policy Framework, that development should only be refused on highways grounds if there would be an unacceptable impact on highway safety.
Section 07
Other Matters
The site is within the Bayton Conservation Area (CA). There is no dispute between the parties that the gates have no adverse effect on the character or appearance of the CA. Having considered the proposal and visited the site and its surroundings, I concur with that view. Accordingly, the character and appearance of the CA would be preserved.
[site address] is a [name] listed building, as is nearby Hillview. Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires the decision maker, in considering whether to grant planning permission for development which affects a listed building or its setting, to have special regard to the desirability of preserving the building or its setting, or any features of special architectural or historic interest. In determining the application, the Council did not identify any harm to the listed buildings or their settings. Given the small-scale nature of the proposal, I have no reason to disagree.
Section 08
Conditions
I have considered whether to impose conditions, having regard to the advice in the Planning Practice Guidance. [name] have considered the development as a proposal, rather than for retrospective permission, I have imposed the standard time limit for commencement. A condition requiring adherence to the approved plans is also necessary for certainty, as suggested by the Council.
Section 09
Conclusion
For the reasons given above, and having regard to all other matters raised, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3683No official casework-database value to compare
- Extracted decision date · page 1
- 9 August 2022Matches the official casework database
- Extracted site visit dates
- 2 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3278289
- Application reference
- 20/02024/HP
- Lead case reference
- Not recorded
- Planning authority
- Malvern Hills District Council
- Planning authority code
- E07000235
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 2 July 2021
- Valid date
- 2 July 2021
- Start date
- 14 June 2022
- Planning authority decision date
- 9 April 2021
- Appeal decision date
- 9 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 18960
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21