Skip to main content
Official casework recordDismissedCurrent release

Appeal 3278450

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

first floor side and rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Procedural Matters

    On 20 July 2021 the Government published a revised version of the National Planning Policy Framework (the Framework). I have had regard to this as a material consideration however, planning decisions must still be made in accordance with the development plan unless material considerations indicate otherwise. The issues most relevant to this appeal remain unaffected by the revisions to the Framework. I am therefore satisfied that there is no requirement to seek further submissions on the revised Framework, and that no party would be disadvantaged by such a course of action.

  4. Section 05

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the surrounding area.

  5. Section 06

    Reasons for the Recommendation

    The appeal site forms part of a semi-detached pair, on a street with similarly sized semi-detached pairs. The street has a somewhat consistent appearance with predominantly hipped roofs and single storey side projections being a common feature. The appeal property has a conforming single storey side projection, though the property features a gable rather than pitched roof form and a large box dormer and ground floor projection to the rear.

    The proposal seeks to add a first-floor wrap around extension to the side and rear of the property. The side element of the extension would be above the existing single storey projection. Although set back slightly from the front elevation and not breaching the building line to the side, it would still add additional bulk above ground floor level to the side of the property that would not appear subservient to the host dwelling. Whilst the separation distance to the next property means there may not be a clear terracing effect, the side element of the extension would be a clearly visible interruption to the single storey side projections seen on this road. The side element would thus not have an appropriate level of regard for the surrounding context and would visibly harm the character of the frontage.

    The vegetation to the side of the appeal site was not in leaf during the site visit so did not prevent significant views of the side of the dwelling. Even if in full leaf, there would still be glimpse views of the appeal site and the vegetation would not prevent views of the property from other angles in the street scene.

    The proposal would also include a rear element over an existing rear projection. Due to the presence of the existing box dormer on the rear roof slope and the large ground floor projection, the addition of an extension at first floor level would add further bulk that would appear out of keeping. Other rear development in the vicinity does not add similar levels of bulk, particularly at first floor level, and therefore despite a varied character to the rear of dwellings on this street, do not appear out of keeping.

    The proposed extension would include a pitched roof form. On the side elevation, although matching the pitch of the main roof slope, its positioning would conflict with the existing gable roof form and would appear incongruous. Many visible projections and extensions in the vicinity of the appeal site have flat roofs which helps to achieve subservience. On the rear elevation the pitched roof would contradict with the roof forms of both the box dormer and ground floor projections on the host dwelling and would give the rear of the property a cluttered appearance. It would thus not appear unified with the host dwelling.

    Overall, the proposal would harm the character and appearance of the host dwelling and the surrounding area. It would therefore fail to comply with Policy CP30 of the Enfield Plan Core Strategy 2010-2025 (adopted 2010) which aims to ensure that development is design-led and has regard to its context. It would also go against the aims of Policies DMD6, DMD8, DMD11, DMD14 and DMD37 of the Enfield Development Management Document (adopted 2014) which together look to ensure proposals have an appropriate scale, bulk, massing and form, with particular regard to the visual impact of rear and side extensions, to ensure development has an appropriate regard for its surroundings.

    The Council have referred to Policies D1, D4 and D8 of the London Plan (adopted 2021). D1 is strategic in nature and D8 refers primarily to the public realm, and they are therefore not greatly relevant to this householder development. D4 refers to the design review processes for applications and is therefore also not particularly relevant to this appeal.

  6. Section 07

    Other Matters

    Although the proposal may not result in any harm to highway safety or residential amenity, this does not diminish the harm to the character and appearance of the host dwelling and the surrounding area.

  7. Section 08

    Conclusion and Recommendation

    For the reasons given above and having had regard to the Development Plan as a whole, I recommend that the appeal should be dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 859No official casework-database value to compare
    Extracted decision date · page 1
    6 December 2021Matches the official casework database
    Extracted site visit dates
    16 November 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3278450
Application reference
21/01254/HOU
Lead case reference
Not recorded
Planning authority
London Borough of Enfield
Planning authority code
E09000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 July 2021
Valid date
6 July 2021
Start date
17 September 2021
Planning authority decision date
3 June 2021
Appeal decision date
6 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
7133
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21