Skip to main content
Official casework recordAllowedCurrent release

Appeal 3278462

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a rear roof extension, including raising the ridge and replacement of all existing single glazed timber sash windows with new double glazed double sash windows.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a rear roof extension, including raising the ridge and replacement of all existing single glazed timber sash windows with new double glazed double sash windows at [site address] , in accordance with the terms of the application, Ref: 2021/01243/FUL, dated 16 April 2021, subject to the conditions set out in the attached schedule.

  2. Section 03

    Main issue

    The Council does not object to the proposed replacement windows or the principle of the roof extension, and I agree with their reasoning and conclusion on this matter. The main issue is therefore the effect of raising the ridge height of the roof by 250 mm on the character and appearance of the conservation area and host house.

  3. Section 04

    Reasons

    The appeal site is on the end of a long terrace of 3-storey properties, which displays a uniform pattern of windows and decorative stonework detailing. The roofscape is complex, with elaborately shaped dormer roofs and long, conspicuous chimney sets between every other house. The roof of each house is separated by a perpendicular parapet, finished with a decorative finial.

    The terrace is part of the Fulham Park Gardens Conservation Area (CA). This is a large area and encompasses many of the surrounding streets. The ‘character profile addendum’ does not specifically refer to the host terrace, but I observed that the age, structure, character and finish of the terraced houses clearly contributes to the heritage interest of the area.

    I also observed that the roofscape along the terrace was not entirely uniform. The height and width of the dormer roofs vary, the chimney pots that dominate the skyline are of different heights and not all of the finials remain. The terraces to either side and opposite are all of different style and structure. Although overall uniformity within the terraces is typical, there is therefore a high degree of variability on the streetscape. Given this context, I do not consider that the small rise in roof height would be easily noticeable.

    I understand from the submissions that several of the houses, including No 20, have had their ridges raised to a similar degree. This was not easily visible from the public domain, in part because of the height of the houses and narrowness of the view from the road. The increase is small in height and the difference absorbed by the dominating parapets, dormer roofs and chimney stacks. I am satisfied that the same protective factors would apply to the current appeal.

    The host house is on the end of the terrace, but is closely flanked by the next one, which has a significantly higher roofline. This would largely hide views of the slightly raised roofline from wider views along the street and [address].

    I conclude that raising the ridgeline by 250 mm would not be easily seen from the public domain, nor would it disrupt the overall uniformity of the terrace. The critical 3-storey form, arrangement of windows and distinctive decorative stonework on the façade would remain and the proposal would not distract from these. In addition, there is a high degree of variability along the streetscape, which would further absorb a minor change. The proposed development would have a neutral effect on the significance of the CA.

    For the same reasons, I do not find that the increase in ridge height of the roof would noticeably alter the proportions of the house or be out of keeping with the architectural character of the property.

    The proposal is therefore consistent with Policies DC1, DC4, DC8 and HO11 of the Hammersmith and Fulham Local Plan (February 2018), [name] CAG3 of the SPD1, and Policy HC1 of the London Plan (2021), which together are protective of the character and appearance of the urban environment and the CA.

    The significance of the CA would be preserved. In coming to this conclusion, I have had regard to my duty under Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 to pay special attention to the desirability of preserving or enhancing the character or appearance of the area.

  4. Section 05

    Conditions

    The Council has recommended 7 conditions. I have imposed most of these, with slight amendments to the wording in the interests of precision and clarity, and to comply with advice in the Planning Practice Guidance.

    In addition to the statutory time limit, I have imposed a condition to secure accordance with the approved plans in the interests of certainty. 1 Hammersmith and Fulham Planning Guidance: Supplementary Planning Document (February 2018)

    I have imposed 2 conditions to control materials and final structure for the purpose of protecting the character and appearance of the host house and CA. This combines 5 of the Council’s recommended conditions.

    I have also combined 2 of the Council’s recommended conditions to control the appearance of the new and replacement windows. I do not consider it necessary for the details to be agreed prior to commencement and have therefore removed this requirement.

  5. Section 06

    Conclusion

    I have not found that the proposal would cause harm to the character and appearance of the host house or conservation area. It would not conflict with the local development plan when read as a whole and there are no other material considerations that indicate a determination other than in accordance with the development plan. I conclude that the appeal should be allowed.

  6. Section 07

    Schedule of Conditions

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the approved plans: • Site location plan (1:1250) (produced 14 September 2020) • Existing plans (1:50@A1 1:100@A3) (00)00 (dated 6 [name] 2020) • Existing plans (1:50@A1 1:100@A3) (00)01 (dated 12 November 2020) • Existing sections and elevations (1:50@A1 1:100@A3) (01)00 (dated 6 August 2020) • Proposed plans (1:50@A1 1:100@A3) (00)10 (dated 16 April 2021) • Proposed plans (1:50@A1 1:100@A3) (00)11 (dated 16 April 2021) • Proposed sections and elevations (1:50@A1 1:100@A3) (01)10 (dated 16 April 2021)

    The materials to be used in the construction of the external surfaces of the development hereby permitted, including the roof, shall match those used in the existing elevation to which the alterations relate.

    The party walls of the roof extension hereby permitted shall be constructed from brick to match the existing facing brickwork in terms of colour, texture, bonding and pointing, shall follow the profile of the extensions and shall not project more than 250 millimetres above or beyond the external faces of the roof structure.

    No windows shall be installed or replaced until the submission of details to the Local Planning Authority, and receipt of its approval in writing, of all window frame profiles, glazing bars, spacer bars, materials and finishes, and locations of frames within openings in elevations and sections (at a scale 1:10). The windows shall be of timber framed sash design and shall match the existing windows in terms of colour, profile, sub-division and opening style, and shall be installed in the same external plane as the existing windows. The windows shall be maintained in this form thereafter.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 910No official casework-database value to compare
    Extracted decision date · page 1
    9 August 2021Matches the official casework database
    Extracted site visit dates
    26 July 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3278462
Application reference
2021/01243/FUL
Lead case reference
Not recorded
Planning authority
London Borough of Hammersmith and Fulham
Planning authority code
E09000013

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
25 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
6 July 2021
Valid date
8 July 2021
Start date
14 July 2021
Planning authority decision date
14 June 2021
Appeal decision date
9 August 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
1566
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21