Appeal 3278709
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the ‘erection of building for use as a double garage with additional living accommodation (revision to 17/00591/AS).’
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
From my site visit, it was evident that a building similar to that which is proposed in this appeal has been erected on site. However, it differs from that shown in the submitted drawings, noticeably in respect of the solid garage doors to the front elevation having been replaced with glazed openings. Accordingly, and for the avoidance of doubt, I confirm that I have based my decision on the proposed building shown in the submitted drawings and not the building as erected on site.
The appellant’s appeal statement refers to the building interchangeably as being for incidental and ancillary accommodation. However, the letter which accompanied the planning application makes it clear that the proposal is for ancillary accommodation. This was the basis on which the Council considered the proposal and I too have considered the appeal on this basis.
A revised Framework1 was published by the Government between the determination of the planning application and the appeal coming before me. I am satisfied that this latest version of the Framework does not raise any new considerations in relation to this appeal. The substantive elements of it remain the same as the previous version with regard to the main issues of this appeal.
Section 04
[name]
The main issue in this appeal is whether or not the proposed development would represent an ancillary annexe building to the main dwelling. 1 National Planning Policy Framework (2021)
Section 05
Reasons
Policy HOU9 of the Local Plan2 supports the provision of a standalone annexe building subject to certain criteria. A key element of this policy is ensuring that not only is there a close physical link between the host dwelling and annexe but that there is also a functional link between the two. This is necessary in order to avoid the possible introduction of completely independent units of accommodation without other appropriate considerations being taken into account.
The proposed accommodation is said to be required for members of the appellant’s extended family following a change in circumstance. I have not been provided with any details of how this would operate on a day-to-day basis but no doubt, aside from providing basic accommodation, the intention is for mutual support to be provided between the appellant and his family in the respective buildings. Consideration of how ancillary accommodation would function relative to the main dwelling inevitably involves an element of the occupier’s personal circumstances. However, other factors also inform an assessment of the acceptability of such buildings. These are reflected in Policy HOU9.
Oaklands is located in open countryside to the west of Ashford. It is one of a number of properties positioned sporadically along [site address] . The appeal site itself comprises a number of buildings, which in addition to the host dwelling and appeal building also includes stables and other buildings/structures, which appear to serve the commercial operations on the site. The appeal building is positioned on the opposite side of the stables to the host dwelling. Although positioned adjacent to the stables and other buildings, the annexe nevertheless appears to be the building furthest away from the host dwelling.
These other buildings and the annexe all benefit from an existing vehicular/pedestrian access and parking area which is separate from that serving the host dwelling. Given their relative positions, it would not be possible to attach a condition which restricted the annexe building to sharing the same access or parking as Oaklands.
The inference from the criteria listed in Policy HOU9, and the explanatory text, indicate that it is unlikely that a standalone annexe located outside the curtilage of a host dwelling would be supported in principle. There is a large, grassed area between Oaklands and the annexe building, which appears to serve as the curtilage of Oaklands. There is a gate which allows pedestrian access from the annexe building through to this grassed area. Thus, whilst the annexe is located close to the curtilage of Oaklands and is within the same ownership, it does not appear to me that the annexe building is actually within the curtilage of Oaklands.
Although it is pointed out that the annexe does not have its own delineated curtilage, as an ancillary building it would not be expected to have one. Accordingly, this factor would represent a lack of harm which, by definition, would be incapable of weighing against the harm of not being within the curtilage of Oaklands. Accordingly, the annexe not having its own curtilage would be neutral in any balance. 2 Ashford Local Plan (2019)
Although the annexe building appears to have a smaller footprint than Oaklands, it has two internal levels and thus is a taller building. When approaching the site along [site address] from the south east, it is the most prominent building on the site. Given the building’s size, it is able to provide two floors of accommodation. Part of the ground floor is intended to provide garage accommodation for two cars. Nevertheless, the remaining part of the ground floor would provide for a good-sized open plan living room and kitchen area. The upper floor would contain two bedrooms and a separate bathroom.
At the time of my visit the building had not been fitted out internally, and no cooking or washing facilities are shown on the drawings for the ground floor. However, from my own observations there would clearly be space for such facilities within the kitchen area. A bathroom is proposed on the upper floor and so certain services are intended to be connected to the building. The insertion of cooking or washing facilities would not in itself be an act of development and is not a matter which could be effectively controlled through the use of a planning condition. As such, the absence of cooking or washing facilities being shown on the drawings is not determinative of the building being ancillary.
Given the distance and lack of close physical relationship between Oaklands and the appeal building; the independent access and parking arrangements; the size and design of the living accommodation, the annexe would be a building capable of operating on an independent basis, providing day-to-day living accommodation, without any clear physical or functional reliance on Oaklands. As such, I do not consider it to be a standalone annexe to the main dwelling.
The proposal is in conflict with Policy HOU9 of the Local Plan. This policy requires, amongst other things, that a standalone annexe be clearly ancillary and achieve a clear dependency with the main building. As such, this decision would accord with Paragraph 47 of the Framework, which amongst other things, highlights that proposals should be determined in accordance with the development plan, unless material considerations indicate otherwise.
Section 06
Other Matters
I have been referred to the previous planning permission on the site for a similarly sized building. I have not been provided with the full details, but that permission provided for a garage, store, home office, games room and welfare facilities in connection with the stables. The permission pre-dates the current Local Plan. The nature of that accommodation and how the building would have been used is very different from the proposal which is now before me. As such, I do not consider that it represents a direct parallel and accordingly the weight I attach to it is limited.
The appellant draws my attention to other appeal decisions to support their case. However, I do not have the full details of those schemes before me and therefore, similarly, cannot be sure that they represent a direct parallel, particularly as they appear to pre-date the current development plan. In any case, I have determined the appeal on its own merits.
The appellant’s statement refers to the balance of probabilities, but this is an application for planning permission, not a certificate of lawful development. Accordingly, I must have regard to the development plan policies, which in this case set out a clear list of criteria against which any proposed standalone annexe building must be judged.
The appellant’s statement also refers to the Framework, but the paragraphs quoted generally relate to the provision of land for new housing, which would not be directly applicable to this case. I have had regard to the current iteration of the Framework in reaching my decision.
I have considered whether the imposition of a condition that limited occupation to the appellant’s family could overcome the planning harm of siting such a building in this location. However, the Planning Practice Guidance3 advises that planning permission usually runs with the land and it is rarely appropriate to provide otherwise. There may be exceptional occasions where development that would not normally be permitted may be justified on planning grounds because of who would benefit from the permission but there do not appear to be sufficient grounds in this case to justify such an approach.
Section 07
Conclusion
The proposal would not represent development in accordance with Policy HOU9 and would conflict with the development plan taken as a whole. There are no material considerations that indicate the decision should be made other than in accordance with the development plan.
Therefore, for the reasons given, I conclude that the appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 272No official casework-database value to compare
- Extracted decision date · page 1
- 16 December 2021Matches the official casework database
- Extracted site visit dates
- 30 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3278709
- Application reference
- 21/00340/AS
- Lead case reference
- Not recorded
- Planning authority
- Ashford Borough Council
- Planning authority code
- E07000105
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 July 2021
- Valid date
- 9 July 2021
- Start date
- 29 September 2021
- Planning authority decision date
- 19 April 2021
- Appeal decision date
- 16 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7740
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21