Appeal 3278748
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
double story extension to the side and single to the rear of the property.
Section 02
Decision
The appeal is allowed and planning permission is granted for double story extension to the side and single to the rear of the property at [site address] , Silsden [postcode] in accordance with the terms of the application, Ref 21/01727/HOU, dated 30 March 2021, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: existing site plan; existing plans; proposed site plan [name]; proposed plans [name] and proposed double & single storey extension [name].
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be carried out in accordance with the approved plans.
Section 03
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the surrounding area.
Section 04
Reasons
The Council’s ‘Householder’ Supplementary Planning Document (SPD) provides advice and guidance on design principles in relation to, amongst other things, extensions1. It states that, as a general rule, extensions should not appear to dominate the original house or neighbouring properties and should complement the original design of the property and wider area.
Extensions that are subordinate to the original house are cited in the SPD as one example of how to approach domestic extensions. In the context of side 1 Section 2: [name] – [name] 1, p10-p11 extensions, the SPD goes on to advise that in order to prevent a terracing effect where semi-detached houses are built in uniform rows, extensions should incorporate a minimum set-back of 1 metre from the existing front wall of the house, with a corresponding lowering of the roofline. A minimum gap of 1 metre between the side of the extension and the side boundary should also be retained to ‘prevent a cramped terracing effect’.
The proposed extension would be set back from the existing front wall by 1 metre and, as a consequence, the roof ridge and roof slope would be correspondingly lower than those of the existing house. The extension would, in the parlance of the SPD, appear as a well-proportioned and subordinate extension to the main house which would also maintain the original character and features of the main house.
The Council’s only concern relates to the proposal’s inset from the plot’s side boundary. The appeal property is part of a row of five pairs of semi-detached properties which, as the SPD cautions2, are built in a uniform row with broadly similar spacing between.
The proposed extension would be set in from the side boundary, but not by 1m. Rather, at 0.5 metres the extension would, the Council argue, result in a cramped terracing effect and a reduction in the sense of separation between dwellings. The latter would inevitably occur with a two-storey side extension, the principle of which the Council do not seem to object to. However, in terms of reducing or avoiding a terracing effect, I am satisfied that the combination of a 1 metre front set back, correspondingly lower roofline and 0.5 metre side inset would avoid both actual and perceived terracing.
The proposal would retain some, if somewhat limited, circulation space around the extension within the site, whilst the boundary inset, front set-back and lowered roofline with hipped roof would retain the fundamental sense of rhythm and spacing evident between buildings along [address]. The neighbouring property at No. 4 has not been extended at the side and so a not-insignificant gap between buildings would be retained, ensuring a satisfactory degree of separation. Should the neighbouring property be extended in the future, the current proposal would provide a basis for maintaining an effective physical and visual gap between the properties, consistent with the broad character and appearance of [address].
I am satisfied that the proposed extension would be a suitably well-designed and subordinate extension which, taken together with the nature, character and appearance of the existing building, would employ sufficient design features to avoid the type of cramped terrace effect that the SPD seeks to resist. I acknowledge that the proposal would not be entirely consistent with the guidance and advice set out in the SPD with regard to gaps at the side of side extensions. However, I am satisfied that it would secure good design, would respond positively to prevailing patterns of development and be appropriate in terms of its layout, scale, materials and appearance in the context of [address]. As such, it would align with the aims and principles of [name] policies DS1 and DS3, and also with the broad design principles set out in the SPD despite a technical breach of the boundary inset guidance set out therein. 2 p11 – Distance to side boundary and maximum width of extensions
Section 05
Conditions
I have considered the Council’s suggested conditions in light of the advice set out in the Framework and Planning Practice Guidance. I agree that time limit and plans conditions are necessary and reasonable in order to provide certainty and in the interests of good plans. Although the plans refer to matching materials, I am not persuaded that there is sufficient certainty in relation to materials so I have attached a matching materials condition.
Section 06
Conclusion
For the reasons set out above, and having considered all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 310No official casework-database value to compare
- Extracted decision date · page 1
- 11 August 2021Matches the official casework database
- Extracted site visit dates
- 3 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3278748
- Application reference
- 21/01727/HOU
- Lead case reference
- Not recorded
- Planning authority
- City of Bradford Metropolitan District Council
- Planning authority code
- E08000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Unknown
- Appeal reason
- Not recorded
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 11 July 2021
- Valid date
- 11 July 2021
- Start date
- 13 July 2021
- Planning authority decision date
- 16 June 2021
- Appeal decision date
- 11 August 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1692
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21