Appeal 3278911
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension with a depth of 6.00 metres, highest point of 3.50 metres and height at the eaves of 3.00 metres.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
The provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, under Article 3(1) and Schedule 2, Part 1, Class A, [name].4(7) require the local planning authority to assess the proposed development solely on the basis of its impact on the amenity of any adjoining premises, taking into account any representations received. My determination of this appeal has been made on the same basis.
The appellant has referred extensively to the principle of the development, the National Planning Policy Framework and local development plan policies. However, the principle of development under Class A is established by the Order and there is no statutory requirement to have regard to the development plan in relation to prior approvals.
Section 04
Reasons
The appeal site is an end of terrace property, attached to 12 [site address] (No 12). At present, the rear wall of the appeal site projects slightly beyond that of No 12, and both have single storey rear elements, typical of terraced properties, although not along the shared boundary.
It is proposed to extend the property to the rear across the full width of the ground floor, using matching materials, to a depth and a height which meets the relevant requirements of Part 1, Class A. The extension is proposed along the boundary line between the appeal site and No 12. Although the depth of the extension would be slightly reduced along this common boundary it would still be deeper than similar rear elements on the appeal site and the immediate neighbours. The extension would therefore be close to the windows and doors serving the ground floor habitable room of the adjoining property.
Coupled with its height, the depth and location of the proposal leads me conclude that it would unacceptably increase the sense of enclosure to and loss of outlook from the adjoining property, No 12. Owing to the orientation of the properties, the proposal would also be likely to unacceptable overshadowing, as well as a reduction in the overall level of light received by the adjoining property. In combination with the effects on light, the increased sense of enclosure and loss of outlook, the proposal would therefore be harmful to the amenity of the adjoining property.
I note the suggestion of the appellant that existing boundary treatments, gaps and intervening distance would mitigate against any sense of enclosure and (loss of) outlook. However, as the extension is proposed along the shared boundary, the retention of any boundary treatments further down the garden, and indeed, the gaps that would remain, would not mitigate the harm that I have found.
I recognise that consistency in the planning process is important and like cases should be decided in a like manner. However, it is also important that each case is determined on its own merits and on the basis of the evidence before the decision maker at the time. I have however had regard to the examples of other similar proposals in the area.
However, all of them differ from the proposal before me, either in terms of what they propose, the specific details of their sites, or the process by which a decision on them was reached (notably with regard to the receipt of objections to a prior approval notification). Similarly, the appeal decision referred to was made in the context of a previous consent of likely similar effect. As a result, none of these matters alter my conclusions or lend support to this particular proposal, on this site.
Section 05
Conclusion
For the reasons given above, I conclude that as the proposal would be harmful to the amenity of No 12, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 224No official casework-database value to compare
- Extracted decision date · page 1
- 28 March 2022Matches the official casework database
- Extracted site visit dates
- 8 March 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3278911
- Application reference
- 1131/21
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Redbridge
- Planning authority code
- E09000026
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 13 July 2021
- Valid date
- 13 July 2021
- Start date
- 15 September 2021
- Planning authority decision date
- 21 April 2021
- Appeal decision date
- 28 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 12993
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21