A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
new front boundary wall and gates.
Section 02
Decision
The appeal is allowed and planning permission is granted for new front boundary wall, fences and gates at [site address] in accordance with the terms of the application, [name]/0720/21, dated 20 April 2021, and the plans submitted with it, subject to the conditions set out in the attached schedule.
Section 03
Preliminary Matters
The proposal includes some fence sections. I have taken this into account.
Since planning permission was refused the Worthing Tree Preservation Order Number 6 of 2021, [site address] has been confirmed. This protects birch and beech trees at the property.
Section 04
Background and Main Issue
The main issue is the effect of the proposal on the character and appearance of the street scene.
Section 05
Reasons
The appeal site is in a built up area within the settlement boundary close to the junction of [address] and [address]. The appeal side of the lower part of [address] has mainly detached dwellings with private gardens; on the opposite side is a large hospital complex. The hospital is enclosed with a tall fence on a raised bank. The front gardens of nearby houses have a variety of boundary treatments including walls, fences and hedges. There are trees and hedges in some gardens, on part of the verge that separates some front gardens from the carriageway where the carriageway narrows to a pinch point, and there is vegetation on the bank opposite. These create a verdant scene especially at times when in full leaf.
The proposed brick wall along the front boundary would be a maximum of some 1.85m high and would gently step down the slope. It would curve away from the carriageway. The gates and associated fence sections would be set back and at an angle to the access shared with Nos 2 and [address]. The gates and fences would be painted steel and set between brick pillars with stone copings. The close boarded fence at the other end of the proposed wall would ensure the BT pole and street lamp would be unaffected.
The replacement of the existing low hedge and open ranch style fence would result in some loss of openness. There would therefore be some conflict with Saved Policy H16(ii) of the Worthing Local Plan (the LP) which, amongst other things, seeks to ensure ancillary development would not affect openness.
The stepped design of the wall with the top layer of bricks on end would be satisfactory and, although a little taller, the proposed wall would be similar to that at No 8 so not discordant with the existing street scene. The wall would be set behind a row of shrub planting and an extra tree is proposed. Appropriate planting could be secured by condition. The Council’s Tree Officer has confirmed that the wall could be constructed without adversely affecting existing trees subject to the trench being hand dug and subject to a contingency if any major or anchoring roots are found such as a lintel/raft foundation where needed. I consider these measures to be good landscape design and sufficient to ensure the verdant character of the area would not be significantly harmed.
The proposed gates and associated fences would be well set back from the carriageway. Accordingly they would not be so prominent or discordant as to harm the character and appearance of the street scene.
Subject to appropriate conditions I conclude the proposal would not have a harmful effect on the street scene. I find no conflict with those parts of Saved Policy H16 Policy of the LP; Policy 16 of the Worthing Borough Council Core Strategy 2011 or those principles of the National Planning Policy Framework that together seek to ensure development is of good architectural and landscape quality and reflects the character of the local area. I find some conflict with Saved Policy H16(ii) of the LP in terms of loss of openness.
Section 06
[name]
The proposal would increase the safety and security of the appeal property and provide better amenity space for future occupants. These are benefits which weigh in favour of the proposal.
Section 07
Conditions
I have considered the conditions proposed by the Council and, where relevant, have amended them to reflect more closely the Planning Policy Guidance. As well as the standard condition specifying the time limits for commencement of development compliance with the approved plans is necessary to provide certainty. Materials for external surfaces of the wall should match those of the existing building in the interests of the appearance of the area.
The submission of a landscaping scheme is necessary in the interests of the appearance of the area. This needs to be submitted before development commences to ensure sufficient space is available for implementation. Digging of the trench by hand and provision for an alternative foundation design is necessary in the interests of the health of protected trees. As the house is already occupied the landscaping should be completed within the first planting and seeding season following the completion of the development.
Section 08
Conclusion
As set out above I have found there would be some conflict with Saved Policy H16(ii) in terms of loss of openness. However, I have found the proposal would otherwise not have a harmful effect on the street scene and would comply with the development plan in this respect. On balance I conclude that the benefits of increasing safety and security and providing better amenity space out-weigh the conflict I have identified with the development plan. Taking all the above into account, for the reasons given above, I conclude that the appeal should be allowed.
Section 09
Schedule of Conditions
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Ref 2105/SR01, 2105/C01 and 2105/C02.
The digging of the initial trench to implement the development shall be undertaken by hand and thereafter inspected by the Council's Tree and [name]. If any anchor roots or roots over 25mm in diameter are found the works shall not progress any further until details of an alternative foundation design to protect the tree roots (such as a lintel or raft foundation) have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall only be carried out in accordance with the agreed details.
No development shall take place unless and until there has been submitted to and approved in writing by the Local Planning Authority a scheme of soft and hard landscaping, which shall include indications of all existing trees and hedgerows on the land and details of those to be retained, together with measures for their protection in the course of development. All hard surfacing, planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the completion of the development and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. End of Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 508No official casework-database value to compare
- Extracted decision date · page 1
- 17 February 2022Matches the official casework database
- Extracted site visit dates
- 15 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3278980
- Application reference
- AWDM/0720/21
- Lead case reference
- Not recorded
- Planning authority
- Worthing Borough Council
- Planning authority code
- E07000229
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 11 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 14 July 2021
- Valid date
- 14 July 2021
- Start date
- 22 September 2021
- Planning authority decision date
- 16 June 2021
- Appeal decision date
- 17 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 10766
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21