Appeal 3279003

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of a dropped kerb, maximum 565 cm.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the installation of a dropped kerb, maximum 565 cm at [site address] , [site address] [postcode] in accordance with the terms of the application, Ref 1292/21, dated 26 March 2021 subject to the following conditions: i) The development hereby permitted shall begin not later than 3 years from the date of this decision. ii) The development hereby permitted shall be carried out in accordance with the following approved plan: Proposed Plan: Address [site address] . [postcode] (A4).

  2. Section 03

    Procedural matter

    The description of development in the banner heading above has been agreed by the [name] and is included as it provides a more accurate description of the development proposed.

  3. Section 04

    [name]

    These are the effect of the proposal on the availability of on-street parking and pedestrian safety.

  4. Section 05

    Availability of on-street parking

    It was apparent from my site visit that [address] North supports on-street parking on both sides of the road. It was apparent from my site visit that drivers can park on the street with relative ease; there was an availability of spaces, helped by off-street parking and the absence of any parking restrictions.

    The dropped kerb would result in the loss of an on-street parking space. However, as it currently stands the appellant parks on the road, occupying an on-street space. Moving the car to the front of his property and installing a dropped kerb would not change the competition for car parking. If anything, the cross-over would allow more than one car to be parked on the appeal site, lessening any competition further. Furthermore, based on the availability of on-street parking I saw on site and in the absence of any parking survey data before me to suggest otherwise, the development would not result in a competition for parking that could be considered unduly harmful to traffic flow or highway safety.

    I find, therefore, that the development would not be contrary to the terms of the National Planning Policy Framework (2021) and Policy T2 of the Local Plan (2018) which seek, amongst other things, development that does not have an unacceptable impact on highway safety.

  5. Section 06

    Pedestrian safety

    The width of the pavement would remain unchanged and vehicle speeds on and off the site would be slow. Crossovers are common in the area and so there would be a level of expectancy by pedestrians and drivers for vehicles moving on and off site. I do not envisage a conflict between vehicles and pedestrians, therefore, for the development to be considered harmful to pedestrian safety. The development would not, therefore, be contrary the terms of the National Planning Policy Framework (2021) and Policy T2 of the Local Plan (2018) which seek, amongst other things, development that does not have an unacceptable impact on highway safety.

  6. Section 07

    Conclusion

    Having considered all matters raised, I conclude that the appeal should be allowed and planning permission granted subject to conditions. The Council has suggested conditions to be imposed if permission is granted which specify the time for implementation and plan. I have included both these conditions because it provides certainty over the timescale for implementation and that the development will be carried out in accordance with the approved plans in the interests of proper planning. Kerb stones will be of a particular material and therefore a condition to this effect is not required.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 295No official casework-database value to compare
    Extracted decision date · page 1
    8 November 2021Matches the official casework database
    Extracted site visit dates
    19 October 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3279003
Application reference
1292/21
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
14 July 2021
Valid date
14 July 2021
Start date
25 September 2021
Planning authority decision date
1 June 2021
Appeal decision date
8 November 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
5722
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21