Skip to main content
Official casework recordAllowedCurrent release

Appeal 3279159

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as: Roof extension involving rear dormer window and front rooflights.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for a roof extension involving rear dormer window and front rooflights at [site address] in accordance with the terms of the application, Ref: 20/5706/RCU, dated 7 December 2020, including drawing number ST_MAR20_5ROB_001 revision A.

  2. Section 03

    Preliminary Matters

    The works have already been carried out and I was able to see them when I visited the site. Whilst the planning application form and the Council’s decision notice describe the works as ‘retrospective’, Section 55 of the Town and Country Planning Act 1990 (the TCPA) describes development as the carrying out of building operations, or the making of material changes of use, as opposed to their retention or continuation. Section 73A of the TCPA makes allowance for the submission of a planning application for development which has been carried out before the date of the application and, consequently, I have considered the planning appeal on that basis and omitted the word ‘retrospective’ from the description.

  3. Section 04

    Main Issue

    The main issue in this appeal is the effect of the proposed development on the character and appearance of the area.

  4. Section 05

    Reasons

    The application site is a semi-detached, traditionally built, bungalow with rooms within the roof space. It has rendered walls under a tiled roof. A large box dormer has been constructed on the rear roof slope together with a hip to gable conversion of the roof, which form the subject of this appeal. The appeal building is one of a number of pairs of semi-detached bungalows situated on [address]. The appeal building is not listed, nor it is within a conservation area.

    [address] is a narrow street with built development, which includes the appeal site, to one side and the rear gardens of the two storey houses on [address] to the other. To the rear of the houses on [address] is a path and a wooded embankment with the A1 road beyond. Many of the houses on [address] have had rear extensions and/or rear dormer windows added. On most of these houses where a rear dormer has been added the hipped roof has also been altered to a gable end.

    The appeal proposal seeks permission for a hip to gable extension and a large box dormer that encompasses the whole width of the rear roof plane of the appeal building. The works have been carried out and, from the submitted evidence, they were completed in early 2004.

    I observed when I visited the site that it is likely that when originally constructed, all of the bungalows on [address] were essentially identical with tiled, hipped, roofs and rendered external walls. However, within the street there have subsequently been numerous roof alterations in the form of a variety of dormer window extensions on both front and rear roof planes, and hip to gable conversions. Many of the properties have also had extensions added to the front, or rear, elevations, or to both. Because of this, any inherent symmetry to the buildings and regular rhythm of the roof forms that originally existed has been very much diluted.

    It was also clear when viewing the rear of the bungalows forming the street from the path that runs along the rear boundaries, and from the elevated position of the footway adjacent to the A1, that there are a number of extensions which are essentially similar to the appeal proposal, in particular at numbers 1, 3, and 7 as well as several other examples further along the street.

    The Council Planning Officer’s report accepts that many of the properties in the near vicinity have benefitted from various additions including hip to gable and rear dormer window extensions. It does, however, also note that that majority of the other hip to gable extensions and dormer extensions were carried out as permitted development. Although this may well be the case, regardless of how these alterations came about, they are now a part of the character of the surrounding area.

    When viewed from [address], the hip to gable extension at the appeal building is seen in context with the existing hip to gable extension at number [address]. The dormer window on the rear roof plane is barely visible from [address] as a result of the proximity of the gable ends. The extension is more visible from the path to the rear and from the footway adjacent to the A1. From this viewpoint it is seen in context with an assortment of dormer windows, in particular the large box dormers to the rear of numbers 1, 3, 6, 7, and 8. As a result, the extension is not perceived as either excessively large or incongruous, set as it is amongst a roofscape characterised by large dormer windows.

    Although the Council suggest that the hip to gable conversion unbalances the pair of semi-detached properties, I saw that approximately seven other pairs of bungalows, just under half of those on the street, also have a similar roof configuration where one property has a gable end and the other a hip. This is therefore not an uncommon feature in the area. I also saw that there are a number of other properties where there is a step in the roof plane to accommodate ground level changes in the street. As set out above, the repeating pattern of hipped roofs that would have existed when the street was originally built has now been largely lost through incremental changes to the roofs of most of the bungalows irrespective of how these came to be accepted. Therefore, these features of the appeal proposal are not unique in the street, nor do they detract from its overall appearance.

    I recognise that the extensions at the appeal building do not comply with the guidance in the Council’s Residential Design Guidance Supplementary Planning Document 2016 (the SPD) in respect of dormer and hip to gable extensions. The SPD does, nonetheless, also expect extensions to fit into the street by taking account of the group value, character, and established form of development along the street, and using a design and facing materials which blend in with the character and appearance of the existing house. The extension is rendered to match the remainder of the house and the form is consistent with the built form of other extensions and the resulting roofscape in the remainder of the street. It is also consistent with other built form nearby at [address] where large rear dormers and asymmetric roof configurations on pairs of semi-detached and houses are very prevalent and much more visually prominent than the appeal scheme.

    As such, the development does not offend Policies CS1 and CS5 of the [name] (2012), or Policy DM01 of the Barnet Development Management Policies Development Plan Document (2012) which, when read together, expect new development to be based on an understanding of local characteristics to ensure that it respects local context and distinctive local character, and respects the appearance, scale, mass, height and pattern of surrounding buildings, spaces and streets. Whilst it is not wholly complaint with the guidance the SPD, the SPD is guidance only and its language is advisory rather than prescriptive.

    I therefore conclude that the proposed development does not cause harm to the character and appearance of the area. It would comply with the relevant requirements of Policies CS1 and CS5 of the [name] and Policy DM01 of the Barnet Development Management Policies Development Plan Document.

  5. Section 06

    Other Matters

    I have noted that the Council have not raised any concerns in respect of the effect of the proposed extension on the living conditions of the occupiers of neighbouring properties. From what I have read and from what I saw when I visited the site, I have no reason to find differently.

    The Planning Officer’s report refers to an enforcement notice being served in 2005 requiring the removal of the rear dormer and hip to gable extension. This was followed by a planning application which sought their retention and that was subsequently refused in 2006. I have not been advised whether or not the enforcement notice was withdrawn. However, in the absence of any other evidence and in view of the elapsed time since these events, some 16 years, I have to conclude that the Council no longer consider it expedient to pursue the enforcement notice.

  6. Section 07

    Conditions

    As the development has been carried out and has been rendered to match the existing building, it is not necessary to impose either a commencement condition or a condition in respect of the external materials. I have specified the approved drawing in the formal decision to provide clarity in respect of what has been granted planning permission. Neither party has suggested that any other additional conditions would be required, and I have no reason to disagree.

  7. Section 08

    Conclusion

    There are no material considerations that indicate the application should be determined other than in accordance with the development plan. For the reasons given above, I therefore conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 472No official casework-database value to compare
    Extracted decision date · page 1
    29 August 2023Matches the official casework database
    Extracted site visit dates
    10 January 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3279159
Application reference
20/5706/RCU
Lead case reference
Not recorded
Planning authority
London Borough of Barnet
Planning authority code
E09000003

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
16 July 2021
Valid date
16 July 2021
Start date
3 September 2021
Planning authority decision date
22 June 2021
Appeal decision date
29 August 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
37734
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21