Appeal 3279334
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
two storey infill rear/side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
On the same day as the appeal was submitted the Government published a revised version of the National Planning Policy Framework (The Framework). The revised Framework has not brought me to any different decision on the appeal and therefore I have not considered it necessary to invite the appeal parties to comment on the new document.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host building and surrounding area of [address] and [address].
Section 05
Reasons
The appeal property is located at the eastern end of [address] and forms the corner plot at the junction with [address]. [address] is characterised by terraces of two storey housing built in a mix of brick, render and painted brick under slate or tiled roofs. The style is traditional and a characteristic feature of the street is the hipped, full height bay windows although, in the case of the appeal property, the corner is turned under a turret feature. A few of the properties on the south side of the Gardens have been extended with dormer roof extensions including No 34. In the case of the appeal property, the dormer extension occupies virtually the whole of the main roof slope and is flush with the gable wall on the east end.
The rear of the properties in the terrace in the vicinity of the appeal site have original back to back, two storey, rear outrigger extensions with an indented courtyard to each property creating an ‘L-shaped’ floor plan to the original houses and a uniformity to the rear elevation of the terrace. In the case of the appeal property the courtyard has been built over with a monopitch, lean-to, single storey extension and to the rear of that a single storey, wrap-around extension across the back of the outrigger.
The proposed development would extend the existing side, monopitch extension upwards at first floor under a pitched roof which would obscure part of the face of the dormer and finish with a partial flat roof to avoid crossing the smaller window in the dormer. The proposed extension would be flush with the side gable end of the main house.
The house is in a highly prominent position on the junction with [address] from where the extension would have the effect of worsening what is already a set of extensions which are excessive and disproportionate to the main house. In particular, the extension would appear out of keeping with the uniformity of the rear outriggers along the terrace by attaching mass and bulk at first floor into the indented return and requiring a roof form at odds with the traditional forms in the area. The proposal would be the latest in a series of poor design solutions which have fundamentally and detrimentally affected the character and appearance of the original house and the surroundings on [address] in particular.
Having viewed the proposal on site in the context of what is already built it is not even clear whether the roof to the extension could be built as proposed as the windows in the existing dormer are not as shown on the submitted plans either in respect of their design or position on the dormer.
The Framework at paragraph 130 requires that developments must be sympathetic to local character to create high quality buildings and spaces amongst other things and in these respects the proposal would fail. At paragraph 134 the Framework states that development that is not well designed should be refused, especially where it fails to take into account design guidance.
The Council has produced the [name] and Alterations Supplementary Planning Document (SPD) to assist householders in planning alterations to existing properties and, in respect of rear extensions, the SPD advises that the extensions should be designed to respect the character and size of the house with particular care being taken on corner plots. This has not been done in this case and the proposed addition to the existing rear extension would harm the character and appearance of the property and its surroundings and would therefore be contrary to the SPD.
It is accepted that the SPD is only guidance but it is designed to help implement the Council’s Development Plan policies. Policy CP17 of the [name] (BCS) is consistent with the Framework in requiring that development does not erode the character of suburban Brent. The policy further restricts development that is out of scale with garden space and does not respect the settings of existing buildings. Policy DMP1 of the Brent Development Management Policies (BDMP) setting out the general policy on managing development makes it clear that the siting, layout, scale, detailing and design must provide high levels of amenity and complement the locality. 2
For the above reasons i.e. principally the scale and bulk of the proposed extension to the side/rear, in combination with the other extensions already on the property, there would be an unacceptable impact on the established character and appearance of the original house and the immediate surroundings. As such the proposal would fail to meet the policy objectives of the Framework, the BCS, the BDMP and the SPD.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 628No official casework-database value to compare
- Extracted decision date · page 1
- 3 December 2021Matches the official casework database
- Extracted site visit dates
- 15 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3279334
- Application reference
- 21/1726
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Brent
- Planning authority code
- E09000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 8 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 July 2021
- Valid date
- 22 September 2021
- Start date
- 30 September 2021
- Planning authority decision date
- 6 July 2021
- Appeal decision date
- 3 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7068
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21