Skip to main content
Official casework recordAllowedCurrent release

Appeal 3279543

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a [name] extension.

  1. Section 02

    Decision

    The appeal is allowed. Planning permission is granted for a [name] extension at [site address] in accordance with the terms of the application Ref 21/02003/FU dated 9 March 2021 subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan, WD/2021/EXT/01 Rev.0, WD/2021/EXT/02 Rev.0, WD/2021/EXT/03 Rev.0 & WD/2021/EXT/04 Rev.0.

  2. Section 03

    Procedural Matter

    The description of the proposal has been altered from the application form to the decision notice. That on the application form adequately describes the proposal, however I have omitted superfluous wording that is not a description of development relating to the suggested merits of the case. I have determined the appeal on this basis.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the dwelling and the area in relation to its scale, form, and massing.

  4. Section 05

    Reasons

    The proposal relates to a bungalow which incorporates accommodation within its roof space. The property is set on [address] which is within a residential area and which hosts modern detached bungalows which incorporate mixed materials and finishes. The result is a pleasant street scene, but not one which is especially cohesive or unique.

    The window arrangement within the dormer would align well with the ground floor window below and would match its three-pane form. Further, the dormer would occupy only a limited section of the front roof slope and would be set well in from the edge of the roof on the side it would be positioned while being set up from the eaves and down from the ridgeline. It would not dominate the front roof slope of the property.

    The proposal would therefore accord with much of the guidance on dormer windows outlined in the SPD1. However, the SPD does advise that dormer windows to the front will not normally be considered acceptable. The property is not located particularly prominently being on a quiet cul-de-sac but other than one historic front dormer the front roof slopes are largely unbroken on the street.

    The provision of a front dormer would therefore result in some conflict with the details of the SPD guidance. However, the property and area specific circumstances along with the design of the dormer window mean that it would be acceptable in terms of its scale, form and massing. Ultimately, the proposal would not be detrimental to the character and appearance of the dwelling or area.

    The proposal would not therefore conflict with Policy P10 of the [name] (2019) (CS) which amongst other things requires that development respects the character and quality of an area. Further, the proposal would not conflict with Policies GP5 and BD6 of the Leeds Unitary Development Plan (2006) which amongst other things require resolution on design issues and that alterations and extensions respect the scale, form, detailing and materials of the original building.

    The proposal would not conflict with Policy HDG1 of the SPD which requires that extensions, additions and alterations respect the scale, form, proportions, character and appearance of the main dwelling and locality. I have not identified conflict with the Framework2.

  5. Section 06

    Conditions

    Planning permission is granted subject to the standard three year time limit. It is necessary that the development be carried out in accordance with the approved plans for the avoidance of doubt and in the interests of certainty. A condition relating to details of materials is not necessary as these are clearly detailed on the application form.

  6. Section 07

    Conclusion

    I have identified no conflict with the development plan and there are no material considerations to indicate that the appeal should be determined otherwise than in accordance with it. I therefore conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 427No official casework-database value to compare
    Extracted decision date · page 1
    29 October 2021Matches the official casework database
    Extracted site visit dates
    20 October 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3279543
Application reference
21/02003/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
5 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
22 July 2021
Valid date
23 July 2021
Start date
29 July 2021
Planning authority decision date
30 April 2021
Appeal decision date
29 October 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
5292
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21