Appeal 3279672
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of the existing conservatory and detached garage, and erection of a replacement single storey rear extension and detached garage.
Section 02
Decision
The appeal is allowed and planning permission is granted for demolition of the existing conservatory and detached garage, and erection of a replacement single storey rear extension and detached garage at [site address] , Windsor, [postcode] in accordance with the application, Ref 21/00207/FUL, dated 25 February 2021, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the approved plans: [name]. TW005a Feb.2021 [name], [name]. TW006a Feb. 2021 [name], [name]. TW004b [name] 21 and [name] TW003b [name] 21.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
The proposed development includes a replacement detached garage, the Council raise no objection in respect of this element of the development and have since confirmed that the works would constitute permitted development. I have no reason to consider otherwise and have therefore not considered this element of the development further.
Section 05
Main Issue
The main issue in the appeal is whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and the development plan.
Section 06
Reasons for the Recommendation
The appeal property is an attractive two storey detached dwelling set within a spacious plot.
Paragraph 149 of the Framework states that new buildings are inappropriate in the Green Belt unless they fall within the given list of exceptions. One exception is the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.
Saved Policy GB1 of the Bracknell Forest Borough Local Plan January 2002 (the ‘Local Plan’) was adopted before the publication of the Framework, but is generally consistent with the Framework. The supporting text to the policy states that the Council will normally consider any increase to be “disproportionate” if it exceeds 40% of the gross floor area of the original building, and extensions will be expected to be located sympathetically and designed so that they do not have an adverse impact on the rural character of the locality. The reference to the 40% increase in floor area is not contained within the policy wording itself and that the Framework does not set a limit, leaving it to the decision maker to determine whether the extension is disproportionate. I have considered both the context and appearance of the property as well as the uplift in floorspace when considering proportionality.
The Council has identified that the original floor area of the dwelling was 107.7 sqm. The dwelling has been extended a number of times and the existing floor area for the dwelling is currently 165 sqm. That is a 53% increase in floorspace from the original dwellinghouse. The proposed extension would increase the floorspace to 186.8sqm which would equate to a 73% increase in floor area. The appellant accepts these figures and I have therefore no reason to conclude otherwise.
Whilst this calculation cannot be solely relied upon to assess proportionality, it does provide an appropriate indication of proportionality of the proposed development. Whilst the proposed extensions and alterations would create additional floorspace, the extension is modest and would remain in keeping with the scale of the dwelling. The planning drawings demonstrate that the design of the extension would complement the original house and would not add unacceptable bulk or massing to the dwelling. Therefore, notwithstanding the further increase in floorspace, taking into account the relatively limited increase involved, I do not consider that the proposed extensions would represent a disproportionate addition over and above the size of the original building.
For these reasons, I find that the proposal would not comprise inappropriate development within the Green Belt as defined by the Framework and Policy GB1 of the Local Plan. The proposal would also accord with Policy CS9 of the Core Strategy Development Plan Document ([name] 2008) which seeks, amongst other things to protect the green belt from inappropriate development.
Section 07
Conditions
I have considered the conditions suggested by the Council. Where necessary, and in the interests of clarity and precision, I have slightly altered the conditions to better reflect the advice in the Framework and PPG.
I have imposed the standard conditions relating to the commencement of development and specifying the relevant plans in order to provide certainty. These specify the material of construction, so an additional condition relating to materials is not necessary in this case.
Section 08
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3394No official casework-database value to compare
- Extracted decision date · page 1
- 5 May 2022Matches the official casework database
- Extracted site visit dates
- 28 March 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3279672
- Application reference
- 21/00207/FUL
- Lead case reference
- Not recorded
- Planning authority
- Bracknell Forest Borough Council
- Planning authority code
- E06000036
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 26 July 2021
- Valid date
- 26 July 2021
- Start date
- 11 November 2021
- Planning authority decision date
- 5 May 2021
- Appeal decision date
- 5 May 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 14689
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21