Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 3280335

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the construction of single storey and first floor extensions without complying with a condition attached to planning permission [name]/2020/0121/FL, dated 14 April 2020.

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the handrail to the first floor glazed balustrade on the north and east elevations of the proposed extension.

    The appeal is allowed insofar as it relates to the construction and cladding of the first floor extension, and planning permission is granted for the construction of single storey and first floor extensions without complying with a condition attached to planning permission [name]/2020/0121/FL at [site address] , [site address] , [site address] [postcode] in accordance with the terms of the application, [name]/2021/0206/FL, dated 18 March 2021, and the plan submitted with it, so far as relevant to that part of the development hereby permitted and subject to the conditions set out in the attached Schedule.

  2. Section 03

    Preliminary Matters

    I have taken account of the new Framework1 in my decision. 1 The National Planning Policy Framework, 2021

  3. Section 04

    Main Issue

    The main issue is the effect that varying the condition would have on the character and appearance of the host building.

  4. Section 05

    Reasons

    The condition in dispute relates to a planning permission granted for a single storey glazed aluminium extension of the east elevation and a first floor extension on the north elevation at [site address] , a two storey detached dwelling located just outside the main built up area of [site address] .

    The approved plan requires the first floor extension to be constructed from stone to match that of the existing dwelling. The first floor glazed balustrade is described as having no handrail along the top. The appellant now wishes to use timber cladding for the first floor extension and to introduce a handrail to the glazed balustrade.

    Stone is the material used in many of the traditional buildings in the area. The appeal property is constructed from limestone. Other stone built properties in the vicinity are mainly sandstone. Although many of the properties in the village of [site address] are stone built, other materials are present including render and brick. There are examples of timber cladding on existing buildings in the village. Although the use of timber cladding on these other properties is of a smaller scale than what is proposed, it does illustrate the range of materials used in the vicinity of the appeal property.

    The proposed alteration of the material for the first floor extension from stone to timber cladding would change the character of the front elevation of the dwelling. It would have a less traditional appearance than the approved stone construction and would not be of such a pleasing appearance. It would nevertheless be moderately used in terms of the dwelling overall and so would not sit uncomfortably with the stone-built dwelling.

    Whilst the first floor extension would be visible when approaching from the west, these views would be transient and would be through the row of roadside trees. Furthermore, whilst noting the National Park Authority’s concern that the use of timber cladding would create a confused and cluttered appearance alongside the modern aluminium framed sunroom and the stone dwelling by adding yet another material in the mix, there would only be limited locations in the nearby area from where the first floor extension would be viewed in conjunction with the glazed aluminium single storey extension.

    The use of timber cladding for the first floor extension in this context would not be unduly discordant with the palette of materials used on the dwelling. It would not therefore unacceptably detract from the host dwelling. Furthermore, in this particular case, given the context of the appeal property, it would not be an unacceptably harmful departure from established local vernacular.

    Accordingly, this element of the proposal would accord with Strategic Policy C of the Local Plan2, which requires proposals to incorporate good quality construction materials and design details that reflect and complement the architectural character and form of the original building and/or that of the local vernacular. It would also accord with Policy CO17 of the Local Plan which [address] Authority Local Plan, adopted 2020 requires the design and detailing of development within the domestic curtilage of dwellings to complement the architectural form and character of the original dwelling amongst other matters.

    The light frame of the balustrade for the first floor balcony as approved is not intrusive and sits very comfortably on top of the existing single storey element. Introducing a heavier frame for the balustrade around the first floor balcony would alter its appearance, accentuating its presence much more than a lighter frame with no handrail. The balustrade would no longer be of such a simple design and therefore subservient to the host dwelling and as such would not complement it. Accordingly, this element would conflict with the requirements of Strategic Policy C and Policy CO17 of the Local Plan, the requirements of which have been summarised above.

  5. Section 06

    Conditions

    The Planning Practice Guidance makes clear that decision notices for the grant of permission under Section 73 should also restate the conditions imposed on earlier permissions that continue to have effect. Accordingly, those conditions that I consider remain relevant will be imposed, with amendments as necessary having regard to the tests for conditions set out in the Framework.

    As well as a time condition, and for certainty, one is required to ensure that the development is carried out in accordance with the approved plans.

    In the interest of the character and appearance of the area and in line with [name] and C of the Local Plan, it is necessary to control the colour of the timber cladding. For the same reasons, conditions are necessary to ensure that the roofing tiles match those on the existing building and to control the colour of the rainwater goods.

    Given the amendments to the materials for the first floor extension, it is no longer necessary to include a condition requiring all new stonework to match the existing building.

  6. Section 07

    Conclusion

    I have found that the proposed timber cladding to the first floor extension would not have a harmful effect on the character and appearance of the host building but the proposal to include a hand rail on the first floor glazed balustrade on the north and east elevations would.

    The first floor extension is clearly severable from the balcony balustrade and therefore, while the appeal fails in relation to the proposed changes to the balustrade, it succeeds in relation to the proposed changes to the first floor extension.

  7. Section 08

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than 14 April 2023.

    The development hereby permitted shall be carried out in accordance with the following approved plan: 1472/4E, except in respect of the first floor glazed balustrade on the north and east elevations which shall be carried out in accordance with plan 1472/4D.

    The external timber cladding of the building hereby approved shall be stained dark brown or left to weather naturally and shall be maintained in that condition in perpetuity.

    All new roofing tiles used in the development hereby permitted shall match those of the existing building.

    The rainwater goods utilised in the development hereby permitted shall be coloured black and shall thereafter be so maintained in that condition in perpetuity.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 194No official casework-database value to compare
    Extracted decision date · page 1
    23 December 2021Matches the official casework database
    Extracted site visit dates
    26 October 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3280335
Application reference
NYM/2021/0206/FL
Lead case reference
Not recorded
Planning authority
North York Moors
Planning authority code
E26000005

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
5 August 2021
Valid date
5 August 2021
Start date
26 August 2021
Planning authority decision date
18 May 2021
Appeal decision date
23 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
8183
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21