Skip to main content
Official casework recordDismissedCurrent release

Appeal 3280352

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

first floor addition added to existing ground floor extension. Increase bedroom size.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    As part of the appellant’s evidence a sunlight and daylight report has been provided. However, the Council nor third parties have had the opportunity to comment on the report. As such, and in the interests of fairness I have not considered the report as part of my findings to avoid prejudice to the parties.

    The appellant disputes the dimensions within the officer’s report. I have considered the scheme on the basis of the submitted plans, and it is clear what was proposed being an extension over the existing ground floor extension.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the living conditions of neighbouring occupiers No [address] (No 9) with particular regard to outlook, sunlight and daylight.

  4. Section 05

    Reasons

    The appeal relates to a two-storey end-terrace dwelling located in a residential area containing dwellings of a similar style, design and finish. On account of the relatively good-sized rear gardens, there are good levels of outlook and natural light serving the rear of properties on this terraced row.

    There is an existing boundary fence between the appeal property and No 9. No.9 benefits from 2 rear windows, that serve a kitchen, facing into the long narrow garden which is open on either side whereby views can be glimpsed of the existing extension at No 7. The proposed extension would be a noticeable presence above the boundary fence and from windows serving the rear elevation of No 9 and within areas of the garden.

    The height, depth and close proximity of the first-floor extension would result in it becoming an imposing and dominating feature. The scheme would create an uninviting outlook, and an increased sense of enclosure, from within No [address] to the shared boundary.

    Given the orientation of the first-floor extension, the short distance from the boundary and path of the sun, there would be likely to be some reduction in daylight and sunlight reaching the rear windows at No 9. Nonetheless, from my observations onsite and given the length of first-floor extension and in set distance from the boundary of the appeal site I find that adequate sunlight and daylight would reach the rear well-sized windows and wide garden area closest to the appeal site boundary. As a result, there would be no unacceptable harm on the occupiers of No 9 through loss of sunlight or daylight.

    For the above reasons, the proposed development would unacceptably harm the living conditions of the occupiers of No 9 with regard to outlook. It would fail to accord with Policies LPD32 and LPD43 of the Gedling Borough Local Planning Document Part 2 Local Plan 2018. These seek, amongst other things, to prevent significant adverse impacts on nearby occupiers. It would also be contrary to the provisions of the National Planning Policy Framework, which seeks amongst other things, development to provide a high standard of amenity.

  5. Section 06

    Other Matters

    I note the appellant’s comments on a further application being submitted to the Council. However, I have been provided with no evidence to understand how this is comparable to the scheme before me.

    Other extensions in the area have been brought to my attention including examples larger than the appeal scheme. However, no details of the scale of these schemes or relationship with adjacent properties and windows has been provided to demonstrate how they compare.

  6. Section 07

    Conclusion

    The proposed development conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweighs the identified harm and associated development plan conflict.

    Therefore, for the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 716No official casework-database value to compare
    Extracted decision date · page 1
    4 November 2022Matches the official casework database
    Extracted site visit dates
    15 September 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3280352
Application reference
2020/1129
Lead case reference
Not recorded
Planning authority
Gedling Borough Council
Planning authority code
E07000173

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
10 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 August 2021
Valid date
5 August 2021
Start date
14 October 2021
Planning authority decision date
14 May 2021
Appeal decision date
4 November 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
23020
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21