Appeal 3280655
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
relocation of timber fence to rear/side elevation.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
Following the Council’s determination of the planning application the revised National Planning Policy Framework (the Framework) was published. However, there are no substantive changes relevant to the appeal before me and therefore no party would be prejudiced by my referring to the 2021 version of the Framework.
Section 04
Main Issue
The main issue is the effect of the development proposed on the character and appearance of the area.
Section 05
Reasons
The appeal site is located at [site address] and is adjacent to the junction between [address] and [address]. It is in a residential area predominantly characterised by larger detached and semi-detached dwellings with large rear gardens. There are varying styles of boundary treatments to dwellings in the locality. These include walls, timber fencing, and hedges, which all vary in scale.
[name] accept there are varying styles and scales of boundary treatments in the locality, there are certain commonalities. Boundary treatments immediately adjacent to highways are generally low-level fencing or walls, sometimes with hedges immediately behind them, or mature hedges on their own. I saw that this is particularly the case around junctions on to [address]. Consequently, the area has a characteristic leafy and open character.
The proposal is to relocate the existing close boarded fence towards the highway, extending the enclosed garden space to the rear of the dwelling. The additional area which would be enclosed by the proposal is currently open and contains two trees which are part of a wider group Tree Preservation Order. It is bounded by a low existing hedge adjacent to the highway.
I acknowledge that there are several locations within the immediate area where higher boundary fencing is in place where dwellings back on to [address]. However, in many of these locations the boundary fences are set back from the carriageway beyond grass verges and/or footpaths. In addition, a proportion of these fences are partially or wholly screened by vegetation softening their appearance. Therefore, they are less prominent in the street scene than the proposal would be.
I recognise that there is a section of existing high fencing immediately adjacent to [address] which forms the rear boundaries of dwellings neighbouring the appeal site, and also a section along the boundary of the site with [address]. However, as set out above, this fencing and its location is not the prevailing boundary treatment in the area nor characteristic.
Therefore, the continuation of the existing higher fencing of the neighbouring dwellings along [address] would be inconsistent with the prevailing boundary treatments. It would intensify the presence of higher boundary treatments within the street scene at a visually prominent location on the corner of a junction.
The dwellings adjacent to junctions onto [address] in the immediate surrounding area mainly have hedges or low boundary treatments set back from the carriageway irrespective of whether they front or back on to the highway. An example of this is the dwelling opposite the appeal site at the junction between [address] and [address] which has a low wooden fence forming the rear garden boundary. The predominantly green and open character and appearance of the area is therefore particularly apparent around these junctions.
I appreciate that the proposal allows for the retention of a section of existing hedgerow adjacent to the sub-station on the immediate corner of the junction between [address] and [address]. Whilst this retention would help to soften the appearance of the proposal in part it would not be substantial enough to mitigate its overall impact on the character and appearance of the area.
Consequently, I find that the proposal would be overly dominant at a visually prominent junction which has an existing open character. I therefore conclude that the development is contrary to Policies CS5 c) and f), and DC1 b) of the Middlesbrough Local Development Framework Core Strategy (2008) which require that development is of a high standard of design and quality that enhances the built environment and is well integrated with the immediate and wider context. It is also contrary to paragraphs 130 and 134 of the Framework, which amongst other things, require that developments are sympathetic to local character.
Section 06
Other Matters
I accept that the proposal would increase the useability of the space which would be enclosed by the revised fence. I also note that the appellant has evidently attempted to work with the Council to arrive at a mutually agreeable solution. Nevertheless, and as my decision must be based on the scheme before me, in light of the foregoing no other matters are sufficient to outweigh my overall conclusion regarding the unacceptability of the development proposed.
Section 07
Conclusion
For the reasons outlined above, having considered the development plan as a whole and all other relevant material considerations, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2118No official casework-database value to compare
- Extracted decision date · page 1
- 20 December 2021Matches the official casework database
- Extracted site visit dates
- 17 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3280655
- Application reference
- 21/0326/FUL
- Lead case reference
- Not recorded
- Planning authority
- Middlesbrough Council *
- Planning authority code
- E06000002
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.08 hectares
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 August 2021
- Valid date
- 18 August 2021
- Start date
- 27 August 2021
- Planning authority decision date
- 5 July 2021
- Appeal decision date
- 20 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7937
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21