Skip to main content
Official casework recordAllowedCurrent release

Appeal 3281137

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

installation of vehicular crossover.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for installation of a vehicular crossover at [site address] in accordance with the terms of the application, Ref 21/01850/FPH, dated 25 May 2021 and the plans submitted with it, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 2021-21-PL-100 (Existing & [name], Site Location Plan).

  2. Section 03

    Preliminary Matters

    During the determination of the application, the council changed the description of development to include only those elements requiring planning permission. I have therefore used the description of development as shown on the decision notice.

    The officer’s report of 17 August 2021 refers to Section 9 of the National Planning Policy Framework (2019) (the Framework). [name] 2021, an updated version of the Framework was published and consequently, I refer to the latest version in my decision.

  3. Section 04

    Reasons

    I consider the main issue to be whether the proposal would result in harm to the safe operation of the public highway.

    The appeal site is located on a residential street known as [address]. It is characterised by Victorian dwellings, most of which are largely terraced or, as in the case of the appeal site, semi-detached. As a result, there is a high demand for on-street car parking, which appears to be easily accommodated on both sides of the road, as a result of a generous carriageway width. The appeal property, No.33, has a small front garden area, which has been paved, and is enclosed by a low brick wall and railings, with access gained via a pair of metal pedestrian gates.

    At the site visit, I noticed a number of other neighbouring dwellings (particularly No’s 34, 35, 36 and 37) had installed vehicle crossover points to provide off-street car parking, together with a number of properties on the other side of the road. In each case, I did not observe that any had sufficient space to turn a car and exit in a forward gear.

    I also noticed 20 mph speed limit repeater signs along the length of [address]. It is not clear whether these had been recently installed, as the officer’s report referred to a speed limit of 30mph. Nevertheless, [address] is a well-used thoroughfare, which may be the reason for the reduced speed limit.

    The highways authority, Hertfordshire County Council, in their response to the application, set out that proposals for vehicle cross overs ‘on busy high-speed roads’ will only be permitted in cases where vehicles can turn 180°, allowing access onto the highway in a forward gear. This clearly cannot be achieved at the appeal site, and the appellant acknowledges this. That said, I am not convinced that the appeal site is located on a particularly high-speed road, and there is nothing in the evidence to suggest that vehicle speeding is a problem now, even if it has been historically.

    I agree that there could be some potential for a vehicle emerging from a front driveway serving the appeal property to be a potential safety hazard, particularly in light of how busy the road appears to be. However, it seems to me that this would be no different to that posed by the equally shallow driveway crossovers serving No’s 34-37 as well as other properties along [address].

    Such vehicle movements are relatively infrequent and undertaken at very low speeds. Having regard to the appellant’s statement, I consider there to be a strong likelihood that drivers are more likely to leave the driveway in a forward gear, having first reversed onto the driveway. Based on what I observed during the site visit, a number of neighbouring occupiers were already doing this.

    I note the intention of the appellant to install an electric car charging point. It would be very difficult to charge an electric car at home without a driveway as any cabling would have to cross a pedestrian footway. Whilst this is more of a private benefit, I consider there to be some weight in favour of the proposal where the move to electric cars is clearly a national priority and would positively impact on air quality as well as reducing the use of fossil fuels.

    Notwithstanding this, there is no evidence before me that the addition of a crossover would materially harm or undermine the highway safety of users of [address], particularly in light of the number of crossovers already in use along this stretch of the road.

    Consequently, I do not find harm to the relevant parts of section 9 of the Framework (2021), nor policy 5 (Development Management) of the Local Transport Plan 4 (2018), which seeks access arrangements are safe and suitable for all people. Nor do I find harm to policy T2 (Parking) of the North Hertfordshire Proposed Submission Local Plan 2011-2031 (2018), as amended by [name], which seeks parking arrangements that are safe and functions satisfactorily.

  4. Section 05

    Conditions

    For the purposes of certainty and in the interests of proper planning, I have imposed planning conditions requiring the development to be carried out within a set timescale and to the approved plans.

  5. Section 06

    Conclusions

    For the reasons given and having regard to all other matters raised, the appeal is allowed, subject to the conditions set out above.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2526No official casework-database value to compare
    Extracted decision date · page 1
    23 December 2021Matches the official casework database
    Extracted site visit dates
    8 December 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3281137
Application reference
21/01850/FPH
Lead case reference
Not recorded
Planning authority
North Hertfordshire District Council
Planning authority code
E07000099

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
0 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
17 August 2021
Valid date
17 August 2021
Start date
22 October 2021
Planning authority decision date
17 August 2021
Appeal decision date
23 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
8186
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21