Appeal 3281554
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of single storey rear extension.
Section 02
Decision
The appeal is allowed and approval is granted under the provisions of Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development)(England) Order 2015 (as amended)(GPDO) for a single storey extension at [site address] , Bradford [postcode] in accordance with the terms of the application Ref 21/02542/PNH, dated 10 May 2021, and the plans submitted with it.
Section 03
Procedural Matters
Under Article 3(1) and Schedule 2, Part 1, Class A of the GPDO, planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions. Where an application is made for prior approval for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g), and an objection is received, paragraph A.4(7) requires the impact of the proposed development on the amenity of all adjoining premises to be assessed, taking into account any representations received.
The principle of the development is established by the GPDO. The prior approval provisions do not require regard to be had to the development plan. I have therefore only had regard to the policies of the development plan in so far as they are material to the matters for which prior approval is sought.
Section 04
Main Issue
The main issue in this appeal is the impact of the proposed development on the amenity of adjoining premises, with particular regard to overshadowing and outlook at No [address].
Section 05
Reasons
The appeal site is a two-storey, semi-detached dwelling, with north facing rear elevation. The proposed single storey extension would extend beyond the rear elevation by six metres for the full width of the host dwelling. The effect of the proposal, as seen from No 45, would be to increase the height and alter the material of the boundary treatment.
The existing hedge along the boundary with No 45 would be replaced with a rendered wall. The eaves of that wall would be only very slightly higher than the head of the rear window at No 45. The highest part of the proposed extension would not be readily visible from this window, due to the angle of view. Beyond that, the height of the wall would be diminishing, thereby reducing its presence. The diminishing effect along the depth of the extension would be further emphasised by the rising garden level. Consequently, the proposed extension would not be overbearing to any significant degree when considered in this context.
The location of the window at No 45 on the north facing rear elevation indicates that any existing direct light would be limited to very early mornings and late evenings. As such, existing daylight levels are already low. The proposed single storey extension is sited on the northern elevation, to the west of the window at No 45. When considered together with the diminishing roof height, any further direct light loss would be for a very limited additional period of time in evenings only, and not at all during winter months. As such, overall daylight levels and living conditions would not be significantly affected.
The proposal’s depth conflicts with guidance in the Bradford Householder Supplementary Planning Document (2012)(SPD), which recommends that such extensions be a maximum of three metres deep. However, the purpose of these guidelines is to prevent neighbours from experiencing unreasonable damage to outlook and unacceptable loss of daylight. I have already found that living conditions would not be harmed in these regards.
The occupants of No 41 are concerned about loss of light. However, the Council have not objected in this regard, and I have no substantial evidence to persuade me that the proposal would result in an unacceptable degree of harm.
I conclude that the proposed development would not adversely impact on the amenity of adjoining premises, with particular regard to overshadowing and outlook at No [address], and would therefore accord with the provisions of Schedule 2, Part 1, Class A of the GPDO. Within the context of that permitted development right, whilst the depth of the extension conflicts with SPD guidance, the proposal complies with policy DS5 of the Bradford District Core Strategy (2017) which requires that development should not harm the amenity of existing or prospective users.
Section 06
Conclusion and conditions
For the reasons given above I conclude that the appeal should be allowed, and prior approval should be granted.
Planning permission granted for development under Article 3(1) and Schedule 2, Part 1, Class A of the GPDO is subject to conditions set out in paragraph A.3 of that Class, of which the following is relevant to the proposal: the materials used in any exterior work must be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 468No official casework-database value to compare
- Extracted decision date · page 1
- 21 December 2021Matches the official casework database
- Extracted site visit dates
- 8 December 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3281554
- Application reference
- 21/02542/PNH
- Lead case reference
- Not recorded
- Planning authority
- City of Bradford Metropolitan District Council
- Planning authority code
- E08000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 28 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 24 August 2021
- Valid date
- 24 August 2021
- Start date
- 2 September 2021
- Planning authority decision date
- 17 June 2021
- Appeal decision date
- 21 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 8025
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21