Appeal 3281810
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the application form as “Raising roof to accommodate new first floor”.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matters
In the planning policies section of the [name] there is mention of an “Adopted Neighbourhood Plan” which I have taken to be the Bengeo Neighbourhood Area Plan. The parties have not sought to rely on this document and it is plain that the most relevant policies of the development plan are to be found in the East Herts District Plan (EHDP) October 2018
Section 04
Main issues
The main issues are firstly, the effect of the proposed development upon the character and appearance of the locality and secondly, whether sufficient provision for vehicle parking would be available for the enlarged dwelling.
Section 05
Reasons
The appeal concerns a small and low bungalow at the end of a terraced and staggered row of 5 such fairly modest single-storey properties. The site lies towards the northern outskirts of Hertford in a suburban area and the surroundings are residential in character.
The principle of extending the property and adapting it meet the changing needs of the owners is not at issue and I accept that householder extension schemes will inevitably make more efficient use of a site, thus moving towards optimising its potential. However, the National Planning Policy Framework (the Framework) also advises that good design is a key aspect of sustainable development; so, development should add to the overall quality of the area and be visually attractive as a result of good architecture and sympathetic to local character. I consider that the appeal proposal is ill-judged in these important respects.
The locality is given a sense of place and a degree of local distinctiveness on account of this part of [name] being purposely planned with separate terraced blocks of residential development to single-storey (nos 34-42), 2- storey (nos 28-32 and nos 44-48) and 3-storey (the flats at nos 35-45) designs, being arranged alongside communal open spaces and car parking areas. The 2-storey house at no. 44 is separated by a pathway from the bungalow at no. 42 and their proximity to each other does not materially dilute the distinct identity of those different terraced groups.
Whilst no. 34 could be said to be tucked away on a corner plot, it still remains clearly visible on the approach along the communal pathways in [name] close by, including the one that passes in between the front of the appeal property and the front elevation of the opposing 2-storey terraced block (nos 28-32) to join [address] North. Given the proximity of the appeal bungalow to [address] North, it is also prominent from various public vantage points along that road.
Whilst the 2-storey house which would result from adding the proposed new first floor may closely resemble the 2-storey terraced houses opposite and there are buildings of different height in the wider locality, I agree with the Council that it is the properties in the same low single-storey row as the appeal property which provide the relevant context in which the site is experienced.
Given its scale, size, siting, height and design, the lack of other similar abrupt changes in height within this or the other terraced rows nearby and the coherence of the row of properties which the site forms part of, the proposed development, in adding considerable bulk and mass at a high level, would appear incongruous and visibly at odds with the scale of the adjoining bungalows. That the development would be seen to overpower the row of adjoining bungalows would be emphasized by the new eaves line of no. 34 being well above the roof ridge of no. 36 and by the tall southern flank wall projecting out at the front owing to the advanced position of no. 34 in the staggered alignment. It would not frame the end of the terrace in manner that would be compatible with the immediate context and surroundings of the site.
The use of identical bricks, mortar and roof tiles is noted but this would not overcome the adverse visual effects of the scheme I have identified.
Permitted development rights available under the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended can represent a fallback and a material consideration when considering the planning merits of the scheme. However, the enlargement of a dwelling consisting of the construction of one additional storey above bungalows of this type can only be pursued as permitted development if the prior notification and neighbour consultation procedures have been properly followed. The outcome of such procedures cannot and should not be predicted at this stage.
I find on the first main issue that the proposed development would harm the character and appearance of the locality. As the development would not be an example of a high standard of design and layout that reflects and promotes local distinctiveness and would have a size, scale, mass, form, siting and 2 design that would be inappropriate to the setting of the existing dwelling and the character and appearance of the surrounding area, there would be conflict with the aims of Policies DES4 and HOU11 of the EHDP. There would also be a failure to adhere to the overarching design themes of the Framework insofar as they relate to achieving well-designed places.
Policy TRA3 of the EHDP says that vehicle parking provision associated with development proposals will be assessed on a site-specific basis. The Council, using its [name], arrives at a requirement for 2 off-street vehicle parking spaces for the resulting 3-bedroom dwelling in this location. I have assumed that the existing one-bedroom dwelling would generate a requirement for one off-street vehicle parking space. [name] have taken these standards into account, it is important to note that like many other nearby dwellings, no. 34 has no on-site parking spaces as such. This is consistent with the original concept and layout of the development hereabouts.
The appellant has provided more details about the existing local parking arrangements – the communal car park and additional lay-by style parking spaces in [name] and the availability of on-street parking along [address] North – all of which I saw on my site visit. Given the pedestrian gate in the back garden and the communal pathway in front of no. 34, both of which lead directly on to [address] North only a very short distance away, it is undoubtedly most convenient for the occupiers of no. [address]. I saw that this road is relatively wide and lightly trafficked and has ample space available for additional safe parking. It could certainly accommodate the vehicle parking provision generated by this scheme without giving rise to any concerns about parking capacity and highway safety.
I find on the second main issue that sufficient provision for vehicle parking would be available for the enlarged dwelling looking at the site-specific circumstances of this case. There would therefore be no conflict with the aims of Policy TRA3 of the EHDP.
Section 06
Conclusion
My finding on the first main issue is decisive to the outcome of this appeal. There is conflict with the development plan. The harm cannot be mitigated by the imposition of planning conditions and it is not outweighed by other material considerations. For the reasons given above and taking into account all other matters raised, including the representations relating to the adjacent property and from the Town Council, I conclude that this appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 807No official casework-database value to compare
- Extracted decision date · page 1
- 29 November 2021Matches the official casework database
- Extracted site visit dates
- 15 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3281810
- Application reference
- 3/21/1371/HH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 August 2021
- Valid date
- 26 August 2021
- Start date
- 4 October 2021
- Planning authority decision date
- 14 July 2021
- Appeal decision date
- 29 November 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 6761
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21