Skip to main content
Official casework recordAllowedCurrent release

Appeal 3281974

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey rear extension.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for single storey rear extension at [site address] , Elsenham [postcode] in accordance with the terms of the application, [name]/21/1701/HHF dated 18 May 2021 and subject to the following conditions.

    The development hereby permitted shall be begun no later than the expiration of 3 years from the date of approval.

    The development hereby permitted shall be carried out in accordance with the submitted documents and the following approved plans: 1021-21.PL.010; 1021-21.PL.011; 1021-21.PL.012; 1021-21.PL.013; 1021-21.PL.014.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

  2. Section 03

    [name]

    The main issues are whether the proposed development would have a detrimental impact on: • The living conditions of present and future occupants of No 23 as a result of reduced private amenity space and • Highway safety as a result of reduced space for on-site parking.

  3. Section 04

    Reasons

    [address], where the appeal site is located, is part of a modern residential estate of two storey, detached and linked houses in brick and tile with render and timber weatherboarded detailing. The appeal property is linked to its neighbour at No 21 by a pitch roofed car port and drive with the main houses orientated with their gable end to the road.

    Directly opposite the appeal property is a large informal area of open space complete with play area and access to woodland beyond.

  4. Section 05

    Living Conditions

    The proposed extension to the rear of No 23 would take up part of the driveway and the existing patio area in the rear garden according to the proposed ground floor plan. There would be a reduction in the current amount of garden space as a result and approximately 60m2 would be left available.

    The Council has produced guidance in the form of the Householder Extensions Supplementary Planning Document (SPD) to assist householders in designing extensions. The SPD makes the point that extensions should be of a size that would leave enough garden area to allow for leisure activities and, having viewed the rear garden area, there would be sufficient garden space remaining to provide for the day to day needs of the family in terms of sitting out space, clothes drying and children’s play.

    Although the Council do not refer to it in the reason for refusal the [name] (EDG) is referenced in the case officer’s report. The EDG states that normally proposals should achieve a minimum of 100m2 of rear garden space for this size of house. However, the EDG clearly states that one of the exceptions to this may be where the property directly faces onto a substantial area of well-landscaped and properly maintained communal open space. This is the case with the appeal property where, as stated above, directly opposite there is a green space and play area and footpath access into woodland beyond which provides immediately accessible managed recreation space.

    Accordingly, the proposal would not conflict with either the EDG or the SPD. The reason for refusal references Policy GEN 2 of the Uttlesford Local Plan (ULP) on design but the only clause directly relevant on this matter is paragraph c) which requires development to provide an environment that meets the reasonable needs of all potential users. The extension itself provides for the needs of the users of the home and as set out above its construction, although reducing the garden area, would not result in a failure to meet the reasonable needs expected to be met by private amenity space.

  5. Section 06

    [name]

    The construction of the extension would extend into the driveway to the side of the property which extends through the car port to the rear garden fence. However, the area of driveway lost would not be significant. Approximately 11 metres would remain between the front wall of the extension and the back of footpath line. Thus, two cars could be accommodated on the drive without encroaching on the highway footpath. Two spaces are the required standard for this size of house and it was clear from my visit where one car was parked in the drive that a second vehicle could have been accommodated with the extension in situ. In addition, within a very short distance of the property, there are also additional communal visitor parking bays.

    I am therefore satisfied that the construction of the extension would comply with Policy GEN 8 of the ULP and with the Vehicle Parking Standards Supplementary Planning Guidance and would not lead to a detrimental impact on highway safety as a result of the reduction in space for off-road parking.

  6. Section 07

    Conditions and Conclusion

    The Council suggested only two conditions in addition to the standard timing condition. I have considered these in the light of the advice in the Framework and Planning Practice Guidance. A condition requiring development to be carried out in accordance with the submitted plans is necessary in the interest of certainty. A condition to ensure the materials used on the external surfaces of the extension match the original house is necessary in the interests of maintaining the character and appearance of the property and its surroundings.

    I have considered the matters before me and, for the reasons given above, I conclude that the appeal should be allowed and permission granted for the single storey rear extension subject to the conditions set out above.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 566No official casework-database value to compare
    Extracted decision date · page 1
    31 December 2021Matches the official casework database
    Extracted site visit dates
    20 December 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3281974
Application reference
UTT/21/1701/HHF
Lead case reference
Not recorded
Planning authority
Uttlesford District Council
Planning authority code
E07000077

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
29 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
31 August 2021
Valid date
31 August 2021
Start date
1 November 2021
Planning authority decision date
27 July 2021
Appeal decision date
31 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
8336
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21