Appeal 3282362
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for a change of use from single dwelling to 3 x 2 bedroom flats.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The appellant’s name is spelt differently on the application and appeal forms. I have used the spelling given in the latter form. I have also taken the description of development from the appeal form as it is more accurate.
Section 04
Main Issue
The main issue is whether occupants of the proposed development would be safe in the event of a flood.
Section 05
Reasons
The property lies within [name] 3 as defined on the Environment Agency’s Flood Map for Planning. Within this area, Policy W DM2 of the Arun Local Plan 2011-2031 (adopted July 2018) (the ‘Local Plan’) requires new development to comply with a number of criteria aimed at reducing the risk of flooding. These criteria are consistent with the approach taken in the National Planning Policy Framework (the ‘Framework’).
Neither a sequential test nor an exception test needs to be applied for applications for change of use such as that proposed1. However, there is a need for the proposal to be supported by a site-specific flood-risk assessment2. No such assessment has been submitted with the application or appeal.
A flood risk assessment is important in determining that the building, once converted, is as flood resistant and resilient as it can be such that, in the event of a flood, it could be quickly brought back into use without significant 1 Paragraph 168 of the Framework 2 Paragraph 167 of the Framework refurbishment. It should also be able to be demonstrated that any residual risk can be safely managed, and safe access and escape routes are included where appropriate as part of an agreed emergency plan. The assessment would also need to take climate change into account, and how this might change the risk of flooding in the future.
Because the building is an existing residential dwelling, there are likely to be limitations as to how much it could be made more flood resistant. However, practical measures, for example flood warning and evacuation plans, would help mitigate flood risk to all occupants, and there may be some adaptations, particularly to the ground floor, that would enable it to be reoccupied quicker after a flood event than if they were not present.
I acknowledge that there are other houses and flats in the immediate vicinity which may not have such adaptations, but their location in an area at risk of flooding is historic, as are the previous uses of the building as a guest house, and, according to the appellant, before that as flats. Nowadays, it is necessary to take appropriate action to reduce the risk of flooding in new development including, as in this case, the change of use of an existing building.
Without a flood-risk assessment there is insufficient information for me to determine whether the proposed change of use is as resistant and resilient to flooding as it could reasonably be made. Consequently, I am unable to conclude that future occupants would be safe in the event of a flood. The proposed change of use would therefore conflict with Policy W DM2 of the Local Plan, which seeks to reduce flood risk.
Section 06
Conclusion
I conclude that the development would conflict with the development plan, and consequently the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 244No official casework-database value to compare
- Extracted decision date · page 1
- 15 August 2022Matches the official casework database
- Extracted site visit dates
- 1 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3282362
- Application reference
- LU/76/21/PL
- Lead case reference
- Not recorded
- Planning authority
- Adur District Council
- Planning authority code
- E07000223
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 26,670 m²
- Number of residences
- 3
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 September 2021
- Valid date
- 13 October 2021
- Start date
- 11 February 2022
- Planning authority decision date
- 20 May 2021
- Appeal decision date
- 15 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 19196
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21