Appeal 3282789

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of a chimney/flue outlet to existing outbuilding.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the installation of a chimney/flue outlet to existing outbuilding at [site address] in accordance with the terms of the application, Ref 20/08515/FU, dated 19 December 2020, and subject to the following condition:

    The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan SM-01, Layout Plan SM-00, and Plans and [name]-03.

  2. Section 03

    Procedural Matters

    The flue is in place, therefore I am considering this appeal retrospectively.

  3. Section 04

    Main Issue

    The main issue is the effects of the proposed development on the living conditions of neighbouring occupiers, with particular reference to smoke and odours.

  4. Section 05

    Reasons

    The flue is situated to the roof of a detached outbuilding in use as an additional sitting room. The flue extracts smoke from a multi-fuel stove used to occasionally heat the outbuilding.

    I noted the small size of the stove on my site visit and saw that the flue projects above the ridge of the outbuilding. I also noted that there are a range of outbuildings adjacent to the summerhouse, and that the gardens to neighbouring properties are of a reasonable length. I could not see any windows to dwellings immediately adjacent to the site of the flue.

    The appeal site is not within a smoke control area where there are limits on the types of fuels which can be burnt. Nonetheless, the appellant has indicated that the types of fuels used in the stove are smokeless coals and kiln dried logs. The fuels listed are typical of those widely sold for burning in domestic stoves and I note that they are HETAS and DEFRA approved for smoke control areas. I also recognise that retailers are no longer permitted to sell household sized bags of house coal and wood with more than 20% moisture content.

    I acknowledge that the neighbour is asthmatic however the aforementioned fuels, and the specification of the stove and flue, are subject to controls under other legislation. Whilst the flue is of lower height than a regular house chimney, it reaches approximately 3.21m from the ground level of the appeal site1. This is sufficiently above head height and garden paraphernalia such as washing lines.

    Furthermore, should the appellant relocate the stove and flue to the roof of the host dwellinghouse which is a very small distance away from the summerhouse, it would be permitted development under Schedule 2 Part 1 Class G of the GPDO2 and thus there would be no control under the planning system. I give moderate weight to this realistic fallback position.

    [name] acknowledge the representations of the neighbouring occupiers with regard to smoke and odours from the flue, no technical evidence has been provided by them nor the Council to substantiate these concerns. Furthermore, there are no responses before me from relevant consultees such as Environmental Health to assist in assessing the effects. Consequently, there is a lack of evidence to lead me to conclude that the development would result in an unacceptable degree of harm to living conditions.

    In view of the above, I find the effects of the proposed development on the living conditions of neighbouring occupiers to be acceptable. It is in compliance with Leeds Unitary Development Plan (Review 2006) saved Policy GP5 which seeks for proposals to avoid loss of amenity and pollution. In turn, the proposal conforms with paragraph 130 f) of the National Planning Policy Framework (the Framework) in terms of amenity for existing and future users.

    In my conclusion I have had regard to paragraph 188 of the Framework which states that the focus of planning decisions should be on whether proposed development is an acceptable use of land, rather than the control of processes or emissions (where these are subject to separate pollution control regimes), and that planning decisions should assume that these regimes will operate effectively.

  5. Section 06

    Other Matters

    I acknowledge the neighbour’s concerns regarding the propensity of existing buildings in the vicinity, however the flue adds little to the mass of structures given its small size. It is appropriately coloured in a matt black and has a minimal visual effect on the appeal site and its surroundings.

    There is a lack of substantive evidence before me that the emissions from the flue would detract wildlife such as birds and bats. The installation of stoves is 1 Figure 4, Statement of Case (RBA Town Planning 3 September 2021) 2 The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) subject to separate legislation in relation to fire risk as well as emissions, and it is only the flue itself which is before me for consideration as part of this appeal.

    I have had due regard to the accommodation needs of the appellant’s son as part of the Public Sector Equality Duty contained in the Equality Act 2010. The stove associated with the flue provides heat to a room which provides independent living space, and this adds a moderate degree of weight to my considerations.

  6. Section 07

    Conditions

    The appellant has indicated that they would agree to a condition which limits operation of the stove to the colder months of October to March only. However, the Council have made no comment on this and I find that such a condition would be unreasonable. This is given that operation of the stove would be minimal during the warmer summer months when gardens are most in use, and windows could still be open during the colder months of year. It would not meet the tests as set out in paragraph 56 of the Framework and the planning practice guidance.

    Given that the flue has already been installed, no time limit condition is necessary. Only a condition requiring adherence with the approved plans is necessary, for the avoidance of doubt.

  7. Section 08

    Conclusion

    The appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted decision date · page 1
    17 December 2021Matches the official casework database
    Extracted site visit dates
    14 December 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3282789
Application reference
20/08515/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
275 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 September 2021
Valid date
13 September 2021
Start date
21 September 2021
Planning authority decision date
20 July 2021
Appeal decision date
17 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
7862
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21