Skip to main content
Official casework recordAllowedCurrent release

Appeal 3282937

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

extension of the lower ground and ground floor.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for extension of the lower ground and ground floor at [site address] , Hackney, London [postcode] in accordance with the terms of the application, Ref 2021/0890, dated 15 March 2021, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: GR.95.LP; GR.95.EX.01; GR.95.EX.02; HR.25.EX.03; GR.95.PR.101; GR.95.PR.102 and HR.25.PR.103.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    A scheme for the provision and implementation of flood resilient and resistant construction details and measures for the extension against surface water and groundwater flood risk shall be submitted to and agreed, in writing with the LPA in consultation with the LLFA prior to the construction of the measures. The scheme shall be carried out in its entirety before the extension is occupied and constructed and completed in accordance with the approved plans in line with BS 8102:2009 code of practice for "protection of below ground structures against water from the ground" and BS 8582:2013 code of practice for "surface water management for development sites" where applicable.

    Prior to superstructure works, detailed specification and a drainage layout of at least one suitable sustainable drainage systems (i.e. water butt, raingarden, bioretention planter box, living roof (substrate depth of 80- 150mm excluding the vegetative mat), permeable paving etc.) shall be submitted to, and approved by the LPA, in consultation with the LLFA. If soakaways i.e. plastic modules and soakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume for all return periods up to the 1-in-100-year storm events plus an allowance for climate change.

  2. Section 03

    Preliminary Matters

    My attention has been drawn to a recent appeal decision1 in respect of an alternative (larger) scheme for the extension of the appeal property. I have had regard to that decision in my consideration of the appeal before me and I have determined the appeal accordingly.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the appeal property and the surrounding area.

  4. Section 05

    Reasons

    The appeal property is an end-of-terrace dwelling which provides accommodation across three storeys, with additional basement rooms. At the rear, there is a three-storey outrigger with a limited projection beyond the property’s main rear wall, from which a longer flat roofed ground floor extension projects into the rear yard and garden area. There are also a variety of extensions present at the rear of nearby properties, most notably at No. 97, which has a large three storey outrigger with a further ground floor extension to the rear of that.

    The proposed extension would extend to a point broadly level with that of the three-storey outrigger at No. 97. Although it would extend across the whole width of the rear of the property and be a substantial rearward extension, it would not appear excessive in the context of either the appeal property, or of those properties around it. Nor would it exceed the overall projection of the existing rear additions at No. 95. Rather, it would have a shorter overall projection than the existing additions.

    I do not share the Council’s concerns regarding the extension’s combination of width and projection having a greater impact upon character and appearance than the existing. Instead, I am satisfied that the proposal would result in an improved and more cohesive appearance of the rear of the property. Furthermore, the subterranean nature of the proposal’s basement element and its flat roof form would ensure that its physical presence within the site would be limited and it would be unobtrusive in the context of the surrounding properties. In the context of a host building with an elevated ground floor level and three-storey outrigger of considerable height and bulk which would act as effective counterbalances to the extension’s width and projection, I find the proposed extension to be an appropriate and proportionate addition to the property.

    I have noted the Council’s concern regarding the planning status of the extension at the rear of the appeal property and also those at neighbouring properties. From my observations during my visit to the site, all appear to be of a reasonably long-standing appearance, the presence of which contribute to 1 APP/U5360/W/21/3271085 the character and appearance of the appeal property, its setting and the character and appearance of the surrounding area.

    The properties to the north of the appeal site may differ in layout and form to that of No. 95 but the scale of the extensions are nevertheless part of the context in which the appeal proposal must be considered. The proposed extension would be only single storey (externally) and of a modest scale and height relative to the appeal property. Its overall depth and width would be neither particularly excessive nor overpowering to the host building or its neighbours, whilst its relatively private location at the rear of No. 95 limits the extent to which it would be visible from beyond the site and its immediately adjoining neighbours. It would not, for these reasons, be the incongruous, dominant or obtrusive addition the Council assert.

    Local Plan (HLP) policy LP1 and London Plan (LP) policy D3 together seek to ensure that all new development must be of the highest architectural and urban design quality, respond to local context and be compatible with existing townscape including urban grain. Although the proposal would not comply with the guidance for rear extensions to terraced properties set out in the Council’s ‘[name] and Alterations’ Supplementary Planning Document, (SPD) I am satisfied that the proposal’s proportions would not be harmful to the character or appearance of the appeal property, neighbouring properties or the surrounding area. Despite the technical breach of the SPD’s guidance I am satisfied that there would be no conflict with the aims and provisions of HLP policy LP1 or LP policy D3.

  5. Section 06

    Conditions

    I have considered the list of conditions suggested by the Council in light of the Framework and Planning Practice Guidance. In addition to time limit and plans conditions, the imposition of which are necessary and reasonable in the interests of good planning and to provide certainty, a materials condition is also necessary in the interests of character and appearance.

    The Council have noted that the site lies in a critical drainage area. As the proposal involves an element of subterranean works, I agree that the suggested drainage and flood resilience conditions are necessary and reasonable in order to ensure that the proposal does not further impact upon drainage issues in the area.

  6. Section 07

    Conclusion

    For the reasons set out, and having considered all other matters raised, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 310No official casework-database value to compare
    Extracted decision date · page 1
    25 November 2021Matches the official casework database
    Extracted site visit dates
    9 November 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3282937
Application reference
2021/0890
Lead case reference
Not recorded
Planning authority
London Borough of Hackney
Planning authority code
E09000012

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
40 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
14 September 2021
Valid date
14 September 2021
Start date
20 October 2021
Planning authority decision date
24 August 2021
Appeal decision date
25 November 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
6618
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21