Appeal 3283100
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the formation of dropped kerbs to frontage of both houses2.
Section 02
Decision
The appeal is allowed, and planning permission is granted, for the formation of dropped kerbs to frontage of both houses at 81 and [address], Ripley, Derbyshire, [postcode] in accordance with the terms of the application, [name]/2021/0476, validated on 30 April 2021, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the approved plans.
Section 03
Application Plans
During the course of the application, the appellant provided additional drawings, in response to a request from the Highway Authority. These are [name]: 1 Existing Site Plan; [name]: 2 Proposed Site Plan; [name]: 2A Proposed Site Plan; and [name]: 3 [name]. Drawing 2A showed a reduced area of dropped kerb to facilitate parking parallel to the highway. It is clear from the [name] that this drawing did not form the basis of the Council’s decision and I do not need to consider it further.
Section 04
Application for costs
An application for costs was made by [name] against Amber Valley Borough Council. This application is the subject of a separate Decision. 1 Section 13 (Declaration) of the application for planning permission was neither signed nor dated 2 Description of the development was set out in various terms – I have amended these for clarity
Section 05
Main Issue
The main issue is the effect of the proposal on highway safety.
Section 06
Reasons
Numbers 63 to 81 (odd numbers inclusive) [address] comprise two rows of houses with a more or less common set back from the highway3. Numbers 63, 65, 69 and 75 have dropped kerbs and forecourt parking. Planning permission has also been granted for similar works at no. 67. Other than the latter, I have no details of the related planning history4.
Nonetheless, none of the existing parking spaces appear to have the requisite depth of 5.5 metres; and visibility splays, in the manner sought for the appeal proposal, are not readily evident. Indeed no. 63 is flanked by the gable wall of no. 61 which extends forward to the rear edge of the footway.
In common with those properties which have off-street parking, the appeal proposal would be capable of providing space for small or medium sized vehicles to park without partially overhanging the footway. Additionally, the visibility available to an emerging driver would not be markedly less. That said, it has to be accepted that the current arrangements for off-street parking, and the presence of kerbside parking, present potential hazards to both pedestrians and passing vehicles.
Taking these drawbacks in context, [address] was seen to have a light and intermittent traffic flow. It is narrow with kerbside parking along its western side and daytime no waiting restrictions on the opposite side. This directs the predominant free flow away from the houses. In addition, this section of the street is generally straight, and the ad hoc arrangement of parking provides a clear signal to both pedestrians and drivers of possible dangers.
It is also relevant to note that the removal of kerbside parking along the frontage of 79 and 81 would offer better visibility of vehicles approaching from the direction of [address] for drivers leaving the access that serves the rear of 81 and 91 Pentrich Road5.
The appellant has also drawn my attention to the recent approval of dropped kerbs at [address]. Whilst each case has to be assessed on its site specific circumstances, consistency in decision making is nonetheless important. It is notable that the Council has only sought to provide some clarity of its concerns in its rebuttal of the application for costs.
In this regard, reference is made to the absence of physical boundary wall issues between 63 – [address]. However, I noted at my site visit that no. 67 is flanked by boundary fences on both sides. It is not stated whether either of these is to be removed/lowered as part of the approved scheme.
Moreover, any requirement for a visibility splay ignores the obstructing effect of a vehicle standing on the adjacent forecourt(s) and does not explain the apparent deficiency in the depth of the bay. It should also be noted that the 3 Visual inspection suggests some narrowing towards 79 and 81 4 The Council has not alleged that any of these are unauthorised 5 The Officer Report acknowledges that ‘The loss of such parking would evidently improve the use of the road for pedestrians and vehicles ......’. visibility splay sought would, in any event, have a very limited benefit for a driver of a vehicle that has parked in a forward facing direction. In this regard, it is likely that manoeuvring on to the highway would begin before the visibility splay had been ‘engaged’.
Although the Council alleges conflict with Policy TP16, which requires ‘satisfactory access ...... to the transport network ......’, and its consistency with paragraph 110 b) of the Framework7, paragraph 111 of the Framework indicates that ‘Development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety ......’.
In my opinion, when considered in the round, the proposal would not have an unacceptable impact on highway safety and the material circumstances identified would outweigh conflict with recommended standards and the
Section 07
development plan.
I have noted the concerns of a neighbouring resident that the proposal would reduce the availability of on-street parking opportunities for those who do not have exclusive parking. However, this does not provide a compelling basis to dismiss the appeal.
Having considered all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1797No official casework-database value to compare
- Extracted decision date · page 1
- 21 January 2021Differs from the official casework database
- Extracted site visit dates
- 10 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3283100
- Application reference
- AVA/2021/0476
- Lead case reference
- Not recorded
- Planning authority
- Amber Valley Borough Council
- Planning authority code
- E07000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 2 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 September 2021
- Valid date
- 12 October 2021
- Start date
- 16 December 2021
- Planning authority decision date
- 25 June 2021
- Appeal decision date
- 21 January 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 9223
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21