Appeal 3283160
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey side (depth 8m, width 5.5m, height 3.8m and eaves 2.4m) and single storey rear extension (depth 7.9m, width 5.2m, height 3.4m and eaves height 2.4m).
Section 02
Decision
The appeal is allowed and prior approval is granted under the provisions of Article 3 and Schedule 2, Part 1, Class A4 of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO) for a single storey side (depth 8m, width 5.5m, height 3.8m and eaves 2.4m ) and single storey rear extension (depth 7.9m, width 5.2m, height 3.4m and eaves height 2.4m) at [site address] , [name], Tewin, Hertfordshire [postcode] in accordance with the details submitted pursuant to Article 3 and Schedule 2, Part 1 Paragraph A4 (2) of the GPDO.
Section 03
[name]
I have taken the description of development above from the Council’s decision notice and the appeal form as it is more succinct than the description included in the planning application form.
Section 04
[name]
The main issues are: • whether the development would be permitted development (PD) under Schedule 2, Part 1, Class A of the GPDO, and • if the proposal is PD under the provisions of the GPDO, whether prior approval should be granted.
Section 05
Permitted development
Clause (ja) of Class A, Part 1 of Schedule 2 of the GPDO states that development is not permitted if “any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j)”. Sub-paragraph (j)(iii) confirms that where the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse and would have a width greater than half the width of the original dwellinghouse, development is not permitted.
The proposed development would involve the erection of two distinct extensions. A gap of approximately 0.45 metre would exist between the flank wall of the proposed rear extension and the flank wall of the proposed side extension. A smaller gap of 0.34 metre would exist between the flank wall of the proposed rear extension and the flank wall of the existing kitchen. The roofs would project a short distance beyond the respective walls of the proposed extensions. Therefore, whilst the extensions would be close to each other, and to the earlier kitchen extension, they would not be physically linked.
I note the findings of the Inspector in appeal [name]/M4320/W/17/3178679, referred to in the [name]. In summary their reasoning was that as an approximate gap of 250mm was ‘too narrow to be material’, the scheme in that instance did not comply with the relevant limitations of the applicable GPDO provisions. I note that decision references other cases where reasoning was along a similar theme (albeit, it seems, with narrower ‘gaps’ between proposals, or elements thereof, of around 25mm to 50mm). It may be logical in certain circumstances to consider such matters, however there is no yardstick set in the GPDO, or elsewhere, as to the factors to consider in terms of compliance with GPDO limitations. The precise circumstances related to that case, obviously proposed different sized extensions in relation to a different sized original building.
Whilst, appreciating that consistency is important in appeal decisions, in my view the principal consideration is whether or not a scheme would comply with GPDO limitations in strict dimensional terms. Within that frame of reference, the scheme before me would be separated by a gap of between 0.34 to 0.45 metres, and both the side and rear extensions would individually comply with the respective limitations of permitted development rights in their own respects, as set out by the appellants. That latter point, significantly, is borne out by the subsequent approval of similar applications 3/21/2902/PNHH and 3/21/2467/PNHH, which separately confirm the compliance of the same sized side and rear extensions with GPDO requirements.
Moreover, I would note that 0.34 to 0.45 metres is a larger separation between elements of a scheme than that considered by the inspector in respect of the aforementioned appeal (and the Inspectors who dealt with schemes referred to in their decision). In my view visually the two elements of the scheme would also be read as distinct on account of the roof pitch proposed to each, in addition to the gap between them.
In light of the above I conclude that the proposed development would be ‘permitted development’ under Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
Section 06
Prior approval
On the basis that the Council have carried out the correct consultation and no objections have been received, I need not consider the impact of the proposal on the amenity of adjoining occupiers.
Section 07
Other matters
I have taken into consideration the two applications referred to by the appellants, relating to developments falling within Class A, that have been approved by the Council. However, every case has to be determined on its own merits and these do not alter the conclusions that I have reached above.
Section 08
Conclusion
For the reasons given above, I conclude that the appeal should be allowed, and prior approval granted.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 955No official casework-database value to compare
- Extracted decision date · page 1
- 17 February 2022Matches the official casework database
- Extracted site visit dates
- 4 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3283160
- Application reference
- 3/21/1664/PNHH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 17 September 2021
- Valid date
- 17 September 2021
- Start date
- 6 December 2021
- Planning authority decision date
- 4 August 2021
- Appeal decision date
- 17 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 10785
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21