Skip to main content
Official casework recordDismissedCurrent release

Appeal 3283928

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two storey side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    This is whether the proposed extension would be inappropriate development within the Green Belt and, if so, whether other considerations clearly outweigh the harm to the Green Belt so as to amount to very special circumstances.

  3. Section 04

    Whether inappropriate development

    Policy EE14 of the Runnymede 2030 Local Plan indicates that the extension of a building in the Green Belt is not inappropriate development provided that it does not result in disproportionate additions over and above the size of the original building. This reflects the National Planning Policy Framework.

    The original dwelling had a floor area of 86.54 sq m. Extensions were undertaken following planning permission RU.09/0637 which increased its size by 12.94 sq m. A ground floor side extension/conservatory of 8.1 sq m was added as permitted development. This was confirmed by the Council in 2010. The proposed two storey side extension would add a further 11.48 sq m.

    Neither national nor local Green Belt policy makes any reference to excluding ground floor development from any calculations or that constructed as permitted development. Rather the correct approach is to consider all cumulative increases in size over time. On this basis the original property would be enlarged by just over 37%. The Council refers to an increase of 72% but based on the agreed figures above this is inaccurate.

    A bay window and first floor rear addition of 7.41 sq m included within the 2009 permission have not been implemented. The appellant’s case is that the proposal would increase the volume of the house at first floor level by less than this amount. However, it is the overall size of the resulting dwelling that should be considered. Moreover, if permission were granted, there would be nothing to prevent these previously permitted works from being carried out. A condition cannot restrict the completion of development which has planning permission. This can only be achieved by means of a planning obligation.

    As a consequence the unbuilt floor space permitted in 2009 should be taken into account. If this is included then the resulting house would be around 46% larger than the original. The appellant suggests that the ground floor of the extension could be restricted to storage space but the assessment is not just about habitable areas. Therefore a condition would not alter this finding.

    Policy EE14 refers to other considerations such as changes in bulk and increases in built footprint. No details have been provided of the overall change in volume but, although the proposal is set back, it would widen the house frontage by around 2.5m. The gain in floor area from all of the previous and permitted extensions would be almost half as much again as the original dwelling. Bearing this in mind and the increase in the width of the property, the proposal would be a disproportionate addition. It would therefore be inappropriate development and would also fail to conform with Policy EE14.

  4. Section 05

    Other considerations

    The proposal cannot be treated as a ‘trade off’ for not completing the first floor extension permitted in 2009 as its future construction cannot be prevented by condition. No obligation to that effect has been provided. This possibility is therefore a matter of limited weight in favour of allowing the proposal.

    The appellant maintains that single storey extensions could be added as permitted development and refers to one of 27.5 sq m on the north-eastern side. However, given that the proposal is to create a bathroom at first floor level it seems unlikely that a ground floor extension would serve the same purpose. There is no evidence of a real prospect that such a development would be implemented. In any event, a single storey extension would not increase the mass of No [address] as the proposal would. As a result, the potential for extensions to be added as permitted development provides minimal support for accepting the proposal.

    Other than on Green Belt grounds there are no objections to the proposed extension. However, the absence of harm in other respects is not a positive consideration, as acceptability in design and amenity terms is to be expected.

  5. Section 06

    Conclusions

    The proposal would be inappropriate development within the Green Belt. In accordance with the Framework, substantial weight should be given to any harm to the Green Belt. Even taken together, the other considerations put forward provide little support for the scheme. Therefore they do not outweigh the harm to the Green Belt and very special circumstances do not exist. The proposed extension would not accord with the development plan and there are no other material considerations to outweigh that finding. Therefore, for the reasons given, the appeal should not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 311No official casework-database value to compare
    Extracted decision date · page 1
    31 March 2022Matches the official casework database
    Extracted site visit dates
    29 March 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3283928
Application reference
RU.21/1111
Lead case reference
Not recorded
Planning authority
Runnymede Borough Council
Planning authority code
E07000212

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
11 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 September 2021
Valid date
29 September 2021
Start date
1 February 2022
Planning authority decision date
31 August 2021
Appeal decision date
31 March 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
13261
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21