Appeal 3284374
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for the construction of a two-storey side extension and side extension to loft conversion.
Section 02
Decision
The appeal is dismissed
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 04
Reasons
[address] is a residential area with a mix of dwelling types and sizes. The dwellings are, for the most part, set within spacious plots, front the road and maintain an appreciable visual gap at first floor between each dwelling. The pattern of development provides some uniformity and a sense of space that positively contributes to the character and appearance of the area. The appeal site is identified along with many others as being within a Residential Area of [name].
[site address] is a semi-detached dwelling with a pitched roof, a design that is repeated regularly along the Road. However, the adjoining dwelling, [address] is a larger detached dwelling with an alternative scale, design and appearance. No 125 has a building line that is forward of No 127, and an existing first-floor extension that extends up to the boundary.
The proposal would match the height of the neighbouring extension and extend up to the side boundary, where a minimal gap would be maintained between the built form. It is acknowledged that the extension has been proposed with a set back and down and the neighbouring dwelling is a property with an alternative siting, scale and design. However, the visual break at first floor is minimal and the difference in siting, scale and design would not sufficiently mitigate the close proximity of the two extensions. Consequently, the extension would fail to provide any visual relief at first floor, contrary to the existing pattern of development, where the visual spacing between dwellings creates a sense of space and is an important part of the character and appearance of the area.
In support of the appeal, it was indicated that the extent of side space between built forms within the locality is visually dominated by slender divisions. However, within the context of the appeal site, I saw that slender divisions are in the minority and were in most part due to an extension to the property. In any event, those that I saw served to confirm that such extensions change the nature of the relationship between the dwellings, to the detriment of the character and appearance of the area.
I, therefore, conclude that the effect of the proposal on the character and appearance of the area would be unacceptable. As such, it would be contrary to core Policy 8 of the Slough Borough Council Local Development Framework Core Strategy 2008, saved Policies H12 and EN1 of the Slough Borough Council Adopted Local Plan 2004, the Slough Borough Council Residential Extension Guidelines Supplementary Planning Guidance 2010. These policies, and guidance, in general seek to ensure proposals are of a high-quality design, which respects its location and surrounding and does not have a detrimental impact upon the street scene. It would also fail to comply with the design objectives of the National Planning Policy Framework.
Section 05
Conclusion
For the reasons given above and taking into account the development plan as a whole and all other relevant material considerations raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2298No official casework-database value to compare
- Extracted decision date · page 1
- 20 December 2021Matches the official casework database
- Extracted site visit dates
- 7 December 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3284374
- Application reference
- P/17170/003
- Lead case reference
- Not recorded
- Planning authority
- Slough Borough Council
- Planning authority code
- E06000039
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 October 2021
- Valid date
- 6 October 2021
- Start date
- 28 October 2021
- Planning authority decision date
- 16 July 2021
- Appeal decision date
- 20 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7957
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21