Appeal 3284383
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as an attic extension to enlarge bedroom and form bathroom.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue is the effect of the development on the character and appearance of the dwellinghouse and the locality.
Section 05
Reasons for the Recommendation
The appeal property is one of three dwellings in [address], which also provides access to [address] and a car park for users of nearby shops. The appeal property is a semi-detached bungalow along with No 10, and the other property at No 8 is a detached one-and-a-half storey dwelling. The three properties have been built with similar design features, such as gable roofs, and matching materials and form a distinct group. Although the properties are tucked away behind the properties on [address], they are readily visible from the pavement along the street and from the adjacent car park. While the surrounding properties are predominantly two-storey terraced properties, many of which have front and/or rear dormers of varying designs and sizes, the cohesive appearance and rhythm of the three properties in [address] creates an attractive and coherent small cul-de-sac.
The proposal would see the erection of front dormer with a sloped tile roof and a rear dormer with an almost flat roof. The rear dormer would be largely screened from public view with only glimpses of the roof available through shrubbery on a small section of [address] at the rear of the property, and as such the rear dormer would not have a significant impact on the street scene. However, the front dormer would span a considerable width and the entire height of the front roofslope and as such would dominate the roofslope. Furthermore, the scale and design of the dormer would be at odds with the front dormers at No 8, which are small in scale and align with the windows below them. In contrast, the dormer would appear lop-sided, being set to one side of the roof with no obvious connection to the windows or doors below and this would create an unbalanced frontage which would not respect the simple form and proportions of the existing dwelling. Consequently, the proposal would be discordant with the appeal property, the group of properties and the locality and would detract from its character and appearance.
For these reasons the proposed development would cause harm to the character and appearance of the existing dwellinghouse and the locality. As such the proposal would conflict with policies BE5 and H14 of the Sheffield Unitary Development Plan (1998) and policy CS74 of the Sheffield Development Framework Core Strategy (2009), which require in various ways that development including house extensions are of good design that respects the scale and form of the original and neighbouring buildings and the surrounding area.
Section 06
Conclusion and recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed because of the conflict with the development plan and there being no material considerations which indicate that a decision should be made other than in accordance with the
Section 07
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and, on that basis, I agree with the recommendation and shall dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 211No official casework-database value to compare
- Extracted decision date · page 1
- 8 February 2022Matches the official casework database
- Extracted site visit dates
- 10 January 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3284383
- Application reference
- 21/02871/FUL
- Lead case reference
- Not recorded
- Planning authority
- Sheffield City Council
- Planning authority code
- E08000019
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 24 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 October 2021
- Valid date
- 6 October 2021
- Start date
- 29 November 2021
- Planning authority decision date
- 26 August 2021
- Appeal decision date
- 8 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 10194
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21