Skip to main content
Official casework recordDismissedCurrent release

Appeal 3284615

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

hip to gable loft conversion including the addition of a roof dormer to the rear facing roof slope.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the surroundings on [address].

  3. Section 04

    Reasons

    [address], where the appeal site is located, forms part of a modern estate backing onto woodland on the outskirts of [name]. The appeal property forms the end house in a short terrace of 4 properties built in brick under a hipped, tiled roof. Within the immediate vicinity there is a mix of gabled-ended roofs and hipped roofs and, in terms of the blocks housing Nos 22-24 and Nos 25-28, gable and hipped roofs are mixed on the same block.

    For that reason, I am satisfied that the proposal to convert the hip roof to a gable end on the northern end of No 32, even though the other end of the block would remain hipped, would not appear out of keeping with the character and appearance of this part of the estate. The northern end of the terrace backs onto the highway footpath but the immediate surroundings are sufficiently open to ensure the proposed gable would not appear unduly overbearing.

    However, the same would not be true of the proposed roof dormer. The dormer, although it would be set down slightly from the ridge and up from the eaves and inset from the gable end, would subsume virtually the whole rear roof slope of No 32. As a result, it would appear top heavy and obtrusive in what is a prominent and highly visible roof in the street scene. Moreover, being positioned at one end of the terrace it would also unbalance the roof and appear as an unsightly addition to the roof plane.

    Policy HOU11 of the East Herts District Plan (EHDP) relating to house extensions does state that roof dormers may be acceptable if appropriate to the design and character of the dwelling and surroundings but that they should be of limited extent and modest proportions and not dominate the roof slope. The design of dormer proposed would not meet these criteria.

    I have been referred to what the appellant considers is a precedent for the roof dormer within the vicinity where a large full-width dormer is positioned on the rear roof slope of No 17. I am not convinced however that this is a comparable example to the appeal case as the dormer on No 17 is not located on a terrace. The dormer sits on a single dwelling which, although linked at right angles to another house, is not viewed in the context of a terraced block. In any event, more importantly, No 17 serves to demonstrate the detrimental effect a full width dormer can have where it dominates the whole roof slope. I am not persuaded that this would be a design that should be followed elsewhere and therefore I will consider the appeal proposal on its own merits.

    It has also been put to me that re-siting the solar panels currently on the rear facing roof slope and on the hip onto the top of the proposed dormer would be an improvement in terms of the appearance of the property. However, the extent of visual harm from the dormer would not be mitigated by siting the panels in a less visible location and this would not be a justification for allowing the dormer.

    I also note the appellant’s offer to use alternative facing materials to the front and cheeks of the dormer to that proposed if this would be more acceptable. However, it is the scale, mass and design of the dormer in this position that would be unacceptable and less the materials proposed.

    The National Planning Policy Framework (the Framework) at paragraph 130 requires that developments must be sympathetic to local character to create high quality buildings and spaces amongst other things and in these respects the proposal fails. Policy DES4 of the EHDP, is consistent with the Framework in requiring development to be to be to a high standard of locally distinctive design and to respect or improve upon the character of the site and surroundings in terms of scale, height, massing and design amongst other things. EHDP Policy HOU11 is also consistent with the Framework and seeks to ensure the design of extensions meets similar criteria. For the above reasons i.e. principally the scale, mass, bulk and design of the rear dormer the proposal would be disproportionate to the roof slope of No 32 and have an unacceptable impact on the established character and appearance of the terrace and the surroundings on [address].

    Given that I have concluded that the hip to gable extension itself would be acceptable I have considered whether a split decision could be made, i.e. allowing that element but dismissing the roof dormer. However, such a decision is only possible where the elements are physically and functionally separate and, in this case, the two elements of the proposal are not capable of being separated.

  4. Section 05

    Other Matters

    I understand the appellant’s wish to provide additional high quality family accommodation and avoid the need to move house. In that way sustainable and effective use of housing land would be achieved, an objective which is encouraged by the Framework in Section 11. However, paragraph 124 in the same section of the Framework states that this should not be at the expense of maintaining an area’s prevailing character and setting. As such, and for the reasons above, sustainable and effective use of the dwelling would not outweigh the harm to the character and appearance of the terrace and [address] that would be the result of the proposal.

    I note the appellant’s reference to a court order requiring appropriate accommodation for the family’s children. However, having carefully considered the proposed design I am not persuaded that the appellant’s objective of securing an additional bedroom and rear facing, ensuite bathroom within the loft space could not have been achieved in a different way avoiding the need for an oversized dormer albeit necessitating a reduction in the size of the bedroom.

  5. Section 06

    Conclusion

    In reaching my decision I have had regard to the matters before me but for the reasons above the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 566No official casework-database value to compare
    Extracted decision date · page 1
    29 December 2021Matches the official casework database
    Extracted site visit dates
    20 December 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3284615
Application reference
3/21/1240/HH
Lead case reference
Not recorded
Planning authority
East Hertfordshire District Council
Planning authority code
E07000242

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
11 October 2021
Valid date
11 October 2021
Start date
2 November 2021
Planning authority decision date
20 July 2021
Appeal decision date
29 December 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
8279
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21