Skip to main content
Official casework recordDismissedCurrent release

Appeal 3284941

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

[name] for the enlargement of a dwellinghouse by construction of additional storey.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Applications for costs

    An application for costs was made by [name] against Central Bedfordshire Council. This application is the subject of a separate Decision.

  3. Section 04

    Preliminary and Procedural Matters

    The appellant’s application form contains an incorrect declaration date, I have therefore used the date the Council registered the application and amended the banner heading accordingly.

    In addition to the above, I have utilised the description of the proposal in the banner heading from the appeal form as it is more concise than that on the original application form. This is also the description used by the Council in the decision notice.

    Schedule 2, Part 1, Class AA of the Town and Country Planning (General Permitted Development)(England) Order 2015 (hereafter “the GPDO”) allows for the enlargement of a dwellinghouse by construction of additional storeys, subject to the exclusions and conditions described in [name].1. and AA.2.

    [name].2.(3)(a) requires that, before beginning the development, the developer must apply to the local planning authority for prior approval. The provisions of the GPDO require the Local Planning Authority to assess the development proposed on the basis of a limited number of considerations, including the effect of the development upon the external appearance of the host dwelling. Procedures for applications for prior approval are set out in [name].3., with the interpretation of relevant terminology provided in [name].4.

    Development plan policies and the National Planning Policy Framework (the Framework) can be considered relevant in prior approval cases, but only insofar as they relate to the development and prior approval matters. I have proceeded on this basis.

    Appeals are decided against relevant legislation and any judgments at the time the appeal decision is made. Since the application was determined and this appeal submitted, a judgment relating to the interpretation of Class AA of Part 1 of the GPDO was handed down by the [address] in respect of challenges to three appeal decisions1. From the evidence before me, both main parties have commented on the relevance of the [name] judgment to this appeal, and I have considered these responses in my decision.

    In accepting additional comments from the main parties, I do not find any third parties would be prejudiced against as the matters are only relevant to the correct interpretation of external appearance.

  4. Section 05

    Main Issue

    The main issue is whether the proposal would accord with the provisions of Part 1, Class AA, with particular regard to the external appearance of the dwellinghouse.

  5. Section 06

    Reasons

    No 31 occupies the end position closest to the junction of [address] and [address] in a predominantly residential area. Whilst there are two-storey dwellings close to the appeal property, it is more readily seen within a short row of link-detached single-storey dwellinghouses. The appeal property has a traditional pitched roof matching the neighbouring three dwellings at No’s 25-29. As a result of the roof profiles, and the symmetry of window profiles, the row has a cohesive and uniform appearance which makes a positive contribution to the overall character and appearance of the area.

    The proposed additional floor would be built with a similar roof profile and design to that of the existing building. Additionally, existing landscaping restricts some views of the property from the adjoining junction. However, notwithstanding those matters, the additional storey would appear as a prominent skyline feature within this group of single-storey properties. Given the highly uniform roof height across the group, the increase in height on a single dwelling would be highly prominent from various surrounding public views and appear incongruous by disrupting the deliberately planned consistency of the roofscape.

    Moreover, the resulting two-storey principal elevation, would become an imposing feature and the vertical orientation of the windows would be unattractive in architectural terms when viewed in the context of the front façades of Nos 25-29. Consequently, having regard to the original design of the 1 CAB Housing Limited v SSLUHC & Broxbourne; Beis Noeh Limited v SSLUHC & London Borough of Haringey; [name] v SSLUHC & London Borough of Haringey [2022] EWHC 208 (Admin). property itself and the shared characteristics of the surrounding row, the additional storey would appear harmful and incongruous.

    The appellant’s evidence notes guidance from English Heritage. I have not been provided with a copy of the guidance or how this can be considered against the relevant provisions of the GPDO. Nevertheless, whilst the site is in an ordinary residential area this does not justify the introduction of an incongruous design.

    The recent CAB judgement concluded the control of the external appearance of the dwelling house is not limited to the impact on the subject property itself but also includes impact on neighbouring premises and the locality. There is nothing before me to suggest the Council have misinterpreted the relevant provisions of the GPDO in this case. A matter that the appellant’s revised statement no longer argues.

    Furthermore, there is no requirement for the Council to conclude their findings in a particular format. I am satisfied that the assessment required on the external appearance of the dwellinghouse including the design and architectural features of the principal elevation has been undertaken and is sufficiently set out in the officer’s report as to the reasons the application was refused.

    Consequently, I find the proposal would cause unacceptable harm to the external appearance of the dwellinghouse which would appear incongruous in the surrounding streetscape and, therefore, contrary to paragraph 130 of the Framework insofar as it relates to the development being sympathetic to local character.

  6. Section 07

    Conclusion

    For the reasons set out above, I conclude that prior approval should not be granted and, therefore, that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 716No official casework-database value to compare
    Extracted decision date · page 1
    4 November 2022Matches the official casework database
    Extracted site visit dates
    20 October 2022 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 716No official casework-database value to compare
    Extracted decision date · page 1
    4 November 2022Matches the official casework database
    Extracted site visit dates
    20 October 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3284941
Application reference
CB/21/02287/PAES
Lead case reference
Not recorded
Planning authority
Central Bedfordshire
Planning authority code
E06000056

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
15 October 2021
Valid date
15 October 2021
Start date
10 February 2022
Planning authority decision date
9 September 2021
Appeal decision date
4 November 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
23025
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21