Appeal 3285274
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the construction of enlarged roof on both sides of dwelling to provide two additional bedrooms at first floor level; conversion of eastern garage to dining room and full enclosure of both semi-enclosed courtyards.
Section 02
Decision
The appeal is allowed and planning permission Ref 20120315 for the construction of enlarged roof on both sides of dwelling to provide two additional bedrooms at first floor level; conversion of eastern garage to dining room and full enclosure of both semi-enclosed courtyards at [site address] granted on 30 May 2012 by Gravesend Borough Council is varied by deleting condition 4.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue in this case is the effect of removing the disputed condition on the Green Belt and the character and appearance of the host dwelling.
Section 05
Reasons for the Recommendation
The appeal property lies within a large plot in the Green Belt, accessed via [site address] . It is a two-storey dwelling setback from the street and characterised by its wide rectangular shape, its hipped roof and numerous projecting front gables. The south-western boundary of the site, to the rear of the house, is well-screened with mature vegetation whilst the side and front boundaries are more open, interspersed with tall, mature trees. A detached double garage lies in close proximity to the eastern flank of the main dwelling. In addition, I observed a large hipped roofed single storey outbuilding, a smaller outbuilding and a shed constructed to the south-east of the appeal dwelling.
It is necessary to consider whether the disputed planning condition meets the guidance for planning conditions set out in the National Planning Policy Framework (NPPF) and Planning Practice Guidance (PPG). The condition in dispute effectively removes [name] and B, Part 1, Schedule 2 permitted development rights as are set out in the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO) which relate to the enlargement, improvement or other alteration of a dwellinghouse, as well as additions to the roof of a dwellinghouse.
The Planning Practice Guidance (PPG) states that conditions restricting the future use of permitted development rights may not pass the tests of reasonableness and necessity. The NPPF indicates that planning conditions should not be used to restrict national permitted development rights unless there is clear justification to do so.
Planning permission ref. 20120315 allowed for additional floorspace representing a 26% increase over that of the original dwelling and additional permitted development was subsequently approved at the property with the erection of a single storey outbuilding and a detached double garage. The Council states that the disputed condition is necessary to prevent the erection of disproportionate extensions to the existing dwelling, suggesting that the cumulative effect of extensions afforded via the permitted development process could be detrimental to the openness of the Green Belt.
Whilst the Council assert that it is not unreasonable practice to withdraw permitted development rights on approved dwellings in the Green Belt, I find that, in this instance, it would be overly cautious and restrictive. Green Belt policy does not require proposals that would be permitted development to be assessed against whether they are inappropriate development in the Green Belt or not, nor is it necessary to assess their impact on openness. Also, the GPDO does not impose any specific restrictions on land in the Green Belt. I therefore see no justification for withdrawing permitted development rights on the basis of the potential impact on the Green Belt.
In addition, I note the Council implies that a larger dwelling resulting from permitted development would fail to positively respond and contribute to the features and character of the appeal dwelling. Nonetheless, permitted development rights for extensions relate only to the original part of the dwelling and due to the relatively moderate scale of any potential extensions relative to the size of the plot, I am not satisfied that these would be of an extent that would be likely to harm the character of the host dwelling.
Taking into account the size of the dwelling and the plot, I do not therefore consider that there is sufficient justification to warrant withholding Class A and B permitted development rights. I find the disputed planning condition is unnecessary and conflicts with paragraph 56 of the NPPF which seeks to ensure that planning conditions are only imposed where they are necessary and reasonable. With the condition removed, the development would remain to be in accordance with Policy CS02 of the Gravesham Local Plan Core Strategy (2014) (the ‘Local Plan’) and paragraphs 137 & 149 which seek to resist inappropriate development in the Green Belt and preserve its openness. It would also adhere to Policy CS19 of the Local Plan (2014) and paragraph 130 of the NPPF which together seek to ensure proposals are well-designed and maintain the character and appearance of the host dwelling.
I do not find that Policy CS12 of the Local Plan is directly relevant to the appeal as it relates more specifically to the borough’s green infrastructure network and the protection of biodiversity and the conservation of valued landscapes.
Section 06
Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.
Section 07
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2082No official casework-database value to compare
- Extracted decision date · page 1
- 26 April 2022Matches the official casework database
- Extracted site visit dates
- 1 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3285274
- Application reference
- 20211001
- Lead case reference
- Not recorded
- Planning authority
- Gravesham Borough Council
- Planning authority code
- E07000109
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 2. Refused permission to vary or remove a condition(s)
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 20 October 2021
- Valid date
- 28 October 2021
- Start date
- 10 December 2021
- Planning authority decision date
- 1 October 2021
- Appeal decision date
- 26 April 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 14312
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21