Appeal 3285558
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of housing for biomass pellet boiler and associated pellet store.
Section 02
Decision
The appeal is allowed and planning permission is granted for construction of housing for biomass pellet boiler and associated pellet store at [site address] in accordance with the terms of the application, Ref 21/P/01238, dated 31 May 2021, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (drawing no. P.01), Proposed Block Plan (drawing no. P.02), Site Plan (drawing no. P.03), Proposed Plan (drawing no. P.04), [name] (drawing no. P.05), Proposed Section AA (drawing no. P.06).
Section 03
[name]
During the course of the appeal the Council adopted the Guildford Borough Local Plan: Development Management Policies (adopted 22 March 2023) (DMP) which supplements the policies in the Guildford borough Local Plan: strategy and sites 2015 – 2034 (adopted 2019) (Local Plan). The main parties were provided with an opportunity to comment on the relevance of the DMP to this appeal. I have taken the comments received into account in my determination of the appeal.
Section 04
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • the effect of the proposal on the openness of the Green Belt; and • whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.
Section 05
Whether Inappropriate Development
The appeal site is in the Green Belt. Policy P2 of the Local Plan provides that, amongst other things, the Metropolitan Green Belt, as designated on the [name], will continue to be protected against inappropriate development in accordance with the Framework.
The Framework establishes that the construction of new buildings within the Green Belt is inappropriate development. There are however a limited number of exceptions to this, as set out in paragraph 149 of the Framework. Similarly, paragraph 150 of the Framework provides that certain other forms of development are not inappropriate in the Green Belt provided they preserve its openness and do not conflict with the purposes of including land within it.
The proposal, for the construction of housing for a biomass pellet boiler and associated pellet store, would be sited approximately 12 metres away from [site address] , and beyond an access road. Hence, I consider that it would not constitute an extension to [site address] for the purposes of paragraph 149 c) of the Framework, which relates to the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.
Neither the Council nor the appellant have identified any other exceptions to inappropriate development within paragraphs 149 or 150 of the Framework which might potentially be applicable to the proposal. Taking account of the nature of the proposed development, I consider that none of these exceptions are applicable.
I therefore find that the proposal would represent inappropriate development in the Green Belt. Inappropriate development is, by definition, harmful to the Green Belt.
Section 06
Openness
The Framework denotes openness as an essential characteristic of the Green Belt. The openness of the Green Belt has a spatial aspect as well as a visual aspect. ‘Open’ can mean the absence of development in spatial terms, and it follows that openness can be harmed even when development is not readily visible from the public realm.
The proposed structure would be approximately 4 metres wide, approximately 6.9 metres deep, and approximately 3.3 metres tall. As such, given its modest size in its proposed position sited near to a number of other much larger buildings (but on slightly lower ground), its visual impact when viewed within the site, including from nearby views along the access road next to [site address] , would be limited.
Additionally, views of the proposed development from further afield, if any, would be very limited due to the thick array of hedgerow present along much of [site address] in the vicinity of the site, and the banks of trees along the western boundary of the site which obscure much of the site from public viewpoints. Accordingly, the proposal would have a limited reducing effect on the openness of the Green Belt in visual terms.
Nevertheless, the proposal would introduce a new building of a not-insignificant height, bulk and massing into an otherwise open and vacant area of land. This would have a reducing effect on the openness of the Green Belt in spatial terms, although this effect would be limited by the modest size of the proposal. Hence, the proposal would cause harm to the openness of the Green Belt in terms of its spatial impact.
Section 07
[name]
The Framework makes it clear at paragraph 148 that substantial weight is given to any harm to the Green Belt. It establishes that ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.
The size of the proposed structure meets the minimum requirements of the UK Pellet Council. As such, its size is commensurate with its intended purpose. Due to convents pertaining to the access road and the land close to [site address] , it would not be reasonable for the proposed structure to be positioned to the immediate rear of [site address] or within the wider developed area of the site. Similarly, due to the regular maintenance required for biomass boilers, including the emptying of ash and the removal of soot, it would not be practical for the boiler to be situated near to habitable spaces. However, these matters merely relate to the rationale for the proposed location for the proposal within the site and so are neutral factors, which do not weigh in favour of the proposal.
Mention has been made of the potential exercise of permitted development rights for the installation of a heating oil tank, which according to the appellant have not been withdrawn by any previous permissions. Based on the information before me, which includes an assessment of such a scheme against the relevant conditions and limitations of the General Permitted Development Order (GPDO), I consider that there is a real prospect that this development might take place in the event that this appeal is dismissed. Whilst no detailed drawings have been provided, given the requirements of the GPDO referred to, it is likely that a structure could be constructed of a similar size and scale as that under consideration in this appeal, with a correspondingly similar impact on the openness of the Green Belt. As such, this is a matter which attracts substantial weight in support of the proposal.
The proposal would allow for the housing of a biomass boiler and pellet store which would provide a reliable source of low carbon heating and hot water to [site address] and The Gatehouse. Given that the proposal would enable 2 properties to be served by renewable energy on a continuous basis, with an overall reduction in fossil fuel use, I have given this consideration substantial weight in support of the proposal.
Section 08
Balancing of considerations and whether very special circumstances exist
The proposal would be inappropriate development in the Green Belt and would result in a reduction in its openness. These matters carry substantial weight.
The combined weight of the other considerations in support of the proposal is very substantial. Accordingly, as a matter of planning judgement I find that the other considerations in this case clearly outweigh the totality of the harm that I have identified. Reference has been made to appeal decision [name]/Y3615/D/20/3259707, however that proposal involved storage for machinery and involved a different scale of proposed development in a different location on site. Given these differences, that scheme is not directly comparable with the proposal before me, and it does not change my findings.
Paragraph 151 of the Framework provides that, amongst other things, very special circumstances may include the wider environmental benefits associated with increased production of energy from renewable sources. Considering this policy position, in assessing the proposal as a whole I consider that very special circumstances exist which justify the proposed development. Therefore, the proposal would comply with the Green Belt aims of Policy P2 of the Local Plan and the Framework, and consequently would be acceptable.
Section 09
Conditions
I have had regard to the conditions suggested by the Council. I have considered them against the advice on conditions set out in the Framework and the Planning Practice Guidance. Conditions are necessary, in the interests of clarity and enforceability, setting out the timescale for the commencement of development and the approved plans respectively.
I have not imposed a condition requiring the control of the external materials since sufficient detail thereof is shown on the approved plans which are covered by a separate condition.
Section 10
Conclusion
For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 368No official casework-database value to compare
- Extracted decision date · page 1
- 26 May 2023Matches the official casework database
- Extracted site visit dates
- 21 March 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3285558
- Application reference
- 21/P/01238
- Lead case reference
- Not recorded
- Planning authority
- Guildford Borough Council
- Planning authority code
- E07000209
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 28 m²
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 25 October 2021
- Valid date
- 25 October 2021
- Start date
- 22 February 2022
- Planning authority decision date
- 4 August 2021
- Appeal decision date
- 26 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 33220
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21