Appeal 3285680
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the conversion of roof space to habitable use to include front and rear dormers, and conversion of roof from hip to gable end to include new gable end window.
Section 02
Decision
The appeal is allowed and planning permission is granted for the conversion of roof space to habitable use to include front and rear dormers, and conversion of roof from hip to gable end to include new gable end window at [site address] in accordance with the terms of the application, Ref P1497.21, dated 28 July 2021, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall not be carried out otherwise than complete accordance with the approved plans reference 101, 102, 103, 104, 105, and 106.
All new external finishes shall be in materials to match those of the existing building.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plans,) shall be formed in the flank wall of the development hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.
The proposed flank windows serving the landing and bathroom as shown on drawings numbers 105 and 106, with the exception of any top hung fanlight, shall be permanently glazed with obscure glass not less than level 4 on the standard scale of obscurity and permanently fixed shut and shall thereafter be maintained in that form.
Section 03
[name]
There are 2 main issues in this case: i) the effect of the gabled roof on the character of the host dwelling and the semi-detached bungalows in the road; and ii) the effect of the front dormer window on the character and appearance of the host dwelling and the semi-detached pair of which it is part.
Section 04
Reasons
[address] consists of semi-detached bungalows, all of which originally had hipped roofs. There are 2 basic designs in the original development, some have forward projections, but still under hipped roofs. A number of bungalows have been extended upwards by the insertion of dormer windows in the roof, and there are evident examples of conversion to a gable roof to one dwelling in a pair. The council states that such examples of conversions to gables have occurred outside of planning control and a Lawful Development Certificate was given by the council in respect of No. [address] for a hip to gable conversion and rear dormer. This alteration to the roof at No. 14 has since been carried out, as I saw at my site visit. A similar Certificate at No. 16 is also referred to.
In respect of the first issue, at present the avenue has largely retained a pleasant character from the original construction period. The odd examples where there have been changes to the roof of one of a pair are conspicuous in the street scene. It is understandable why the officer took the view that resulted in the refusal of permission, bearing in mind the policies in the [name] and Alterations Supplementary Planning Document which stems from Policy DC61 of the council’s [name] and Development Control Policies Development Plan Document. A single hip to gable alteration to a pair of semi-detached does indeed unbalance the pair and have a rather incongruous appearance. Had that been the only consideration, I would have concluded as the officer did.
However, the matter of a ‘fallback position’ has been raised, and this is a material consideration in this case. The decision in the case of Gambone v. Secretary of State for Communities and Local Government and Wolverhampton City Council [2014] EWHC 952 (Admin) is referred to in some detail in the appellants appeal statement, such that I need not set it out here. Suffice to say that a fallback can be a material consideration where there is a greater than theoretical possibility of the development taking place, and can be a form of development that is allowed for by virtue of entitlements such as provided by the General Permitted Development Order (GPDO). The weight to be given to such a fallback is a matter for the decision maker in the circumstances of the case, including the scale of harm which would arise.
The appellant accepts that the totality of the appeal proposal could not be achieved by way of the fallback, which in this case is Class B – additions etc to the roof of a dwellinghouse – of the GPDO. The front dormer is not permitted under this class because it fronts a highway, and the hip to gable and rear dormer does not conform because the volume exceeds 50 m 3. However, in respect of the latter, the appellant’s argument is that the excess above 50 m3 is marginal at 7 m3, and the proposal for the dormer could be reduced by this amount, providing the appellant with most of the accommodation (in this part of the proposal) that is sought.
Looking at the extent to which this is a real possibility rather than theoretical, it seems to me that the fact that a scheme was drawn up, a planning application submitted, and an appeal entered, all point to a desire by the appellant to carry out the development and suggest that some financial planning has also taken place. The fact that the fallback would provide less that is desired, is a negative factor in terms of it being a likely path to follow, but it may be something of a cheaper option, which could have attraction. I conclude that there is a greater than theoretical possibility of the fallback development taking place in the event of this appeal being dismissed. The other cases referred to that have been carried out without express planning permission also show that this is seen as a beneficial addition to these bungalows. I will turn to the weight to be given to this in my overall conclusions.
I now turn to the second issue - the effect of the front dormer window on the character and appearance of the host dwelling and the semi-detached pair of which it is part. Clearly the front dormer is part of a single scheme that provides the accommodation sought, and it could not be developed as a stand-alone element without the gable and rear dormer. Nevertheless, at this point it is necessary to separate this element from the rest of the appeal scheme, before coming to an overall conclusion, since the outcome of the second issue could have a decisive effect on the decision on the total appeal proposal.
Looking at the front dormer alone, it must be seen in the context that there are a substantial number of front dormers in [address] already; thus a front dormer does not have the impact of being unusual in the street scene. Furthermore, there are examples that I consider are more intrusive than the appeal proposal. This is because, in some instances they combine in a pair of semi-detached bungalows to be incongruous through a difference in scale and form, taking no account of each other. In other cases their size and position in the roof is unsympathetic and out of scale with the roof within which they are set.
The appeal proposal is relatively small, being set down from the ridge, well up from the eaves and having suitable gaps on either side. I consider that in the context of existing front dormers the appeal proposal is acceptable and would not have an overly harmful effect on the character and appearance of the host dwelling or the semi-detached neighbour. But, since it relies on the gable form of roof, can only be considered favourably if the hip to gable can be approved.
Section 05
Overall conclusion
In my judgement the fallback proposition is a material consideration of some weight: it is certainly more that a theoretical possibility, and I regard it as being more than likely to be implemented in the event of the appeal being dismissed. Taken with the fact that there are other examples in the vicinity and that it is likely to be an enlargement of the quite modest bungalows that will be attractive to others, it seems to me that the balance comes down to accepting a likely hip to gable outcome, and permitting a scheme that would provide a designed solution to the appellant’s wish for greater accommodation more suited to modern lifestyles. In this case this includes the provision of a home working space, as proposed on the ground floor. I reach this view with the recognition that a gable on one roof of a pair introduces the unfortunate effect that I have referred to in paragraph 4 above.
In the situation where the hip to gable configuration is accepted because of the strength of the fallback, the front dormer becomes a feature that is rather familiar in [address], and the particular form and proportions proposed minimise its impact. [name] find that the front dormer is an acceptable feature in the composition of the overall appeal proposal.
In the light of these conclusions, and having taken all other matters into account, I will allow the appeal.
Section 06
Conditions
The Council has suggested a number of conditions in the event that the appeal is upheld. I have considered these in the light of Planning Practice Guidance (PPG). For clarity and to ensure compliance with the [name] have amended some of the text. I consider that the conditions should be imposed for the following reasons: condition 2 is required for certainty and avoidance of doubt as to the development permitted; condition 3 is to ensure that the appearance of the development permitted integrates with the existing in a visually satisfactory manner; conditions 4 and 5 are to ensure no loss of privacy to the neighbouring property.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 129No official casework-database value to compare
- Extracted decision date · page 1
- 19 January 2022Matches the official casework database
- Extracted site visit dates
- 5 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3285680
- Application reference
- P1497.21
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Havering
- Planning authority code
- E09000016
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 30 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 27 October 2021
- Valid date
- 27 October 2021
- Start date
- 2 December 2021
- Planning authority decision date
- 22 September 2021
- Appeal decision date
- 19 January 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 9120
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21