Skip to main content
Official casework recordDismissedCurrent release

Appeal 3286361

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

retrospective two storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The description in the banner heading above has been taken from the Council’s decision notice as this provides a more succinct description than part 4 of the planning application form. The appellant has adopted this description in their appeal form confirming it is the development they are seeking planning permission for.

    I saw from my site visit that the works described above have been started and the planning application was made retrospectively. Accordingly, I have considered the appeal on that basis.

  3. Section 04

    Main Issue

    The main issue is the effect of the development on the living conditions of neighbours to the west and north, with regard to privacy, outlook and sunlight.

  4. Section 05

    Reasons

    No. [site address] (No.89) is a two-storey mid-terrace dwelling. To the rear, it has a two-storey outrigger that has been extended in depth to provide a larger fourth bedroom. The Council granted planning permission for a first-floor extension to No.89 in November 2019 (ref. HH/344204/19) and the outrigger has since been extended around 2.1m beyond the rear wall of this approved scheme.

    The two-storey outrigger projects along the common boundary with the neighbour at No.[address] (No.87) to the west. No.87 also has an existing two-storey outrigger with a first-floor window on the north elevation and a window on the original rear elevation of the dwelling. The outrigger to No.89 extends beyond the rear building line of No.87 and would be clearly visible from the first-floor outrigger window. The outlook from that window would however remain principally over the rear yard and to the dwellings to the north, with the extension viewed at an oblique angle. Because of the depth and orientation of the two-storey extension, to the north west of No.87, there would be some loss of light to part of the rear yard. I am not , however, persuaded, nor do I have any evidence before me, that there would be a noticeable reduction in light to the first-floor window of the outrigger.

    The first-floor window on the original rear elevation of No.87 already has a compromised outlook with the two-storey outriggers on either side resulting in a tunnelling effect. The additional depth of the two-storey outrigger over the approved first-floor extension to No.89, would not substantively change that outlook or the light that it receives. I am therefore satisfied that the development would not result in a loss of outlook or light to the dwelling to the west, such that it would cause harm to the living conditions of the neighbours.

    Those dwellings to the north fronting [address] are sited at a lower level than dwellings on [address], separated by a relatively wide ginnel providing access to the rear yards. Because of this change of level and the height of the outrigger extension, which has high eaves and a shallow gabled roof, it does appear prominent from the ginnel. However, the outlook from dwellings on [address] is principally over the ginnel and towards the high boundary walls and existing two-storey outriggers. The increase in the depth of the outrigger would not substantially change this, such that it would cause a material harm to outlook or appear overly dominant.

    The two-storey outrigger includes a window to the rear elevation which would serve the fourth bedroom and faces towards the rear of dwellings fronting [address], notably Nos.22 and [address]. I acknowledge that the approved first-floor extension would result in a level of overlooking between dwellings and that, in an urban location, there is often a degree of mutual overlooking. However, I observed on site that there would be overlooking to a non-obscured first-floor window (that appeared to be a bedroom) of No.[address] and down over the private outdoor spaces of both No.22 and No.[address]. Because the first-floor of No.89 has been extended 2.1m closer to these dwellings to the rear, the level of overlooking, and therein loss of privacy, is significant.

    The appellant has suggested that the bedroom window could be fitted with obscure glazing, or low level obscure glazing, which could be conditioned. From the information before me, and from my site visit, I do not consider this would be a practical solution. Although internally the extension was unfinished, I saw that the depth of the bedroom and absence of any other windows means the bedroom lacks natural light. Restricting light further through the use of obscured (or part obscured) glazing would therefore result in low quality accommodation for the bedroom of No.89. Further, there would still be a perception of overlooking for the neighbours of No.22 and No.[address].

    I am sympathetic that the extension would provide additional accommodation for the appellant’s young family, benefitting their well-being. However, in this case, this does not outweigh the significant harm through loss of privacy that I have found to the living conditions of the neighbours to the north.

    Consequently, the proposals fail to comply with Policy 9 of the Oldham Development Plan Document – [name] and Development Management Policies (2011) because it causes significant harm to the amenity of existing and future neighbouring occupants through impact on privacy.

  5. Section 06

    Conclusion

    For the reasons given above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 114No official casework-database value to compare
    Extracted decision date · page 1
    1 March 2022Matches the official casework database
    Extracted site visit dates
    8 February 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3286361
Application reference
HOU/346804/21
Lead case reference
Not recorded
Planning authority
Oldham Metropolitan Borough Council
Planning authority code
E08000004

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
12 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 November 2021
Valid date
6 November 2021
Start date
29 December 2021
Planning authority decision date
16 August 2021
Appeal decision date
1 March 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
11451
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21