Skip to main content
Official casework recordAllowedCurrent release

Appeal 3286796

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

double dropped kerb and new drive.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for double dropped kerb and new drive at [site address] , Christchurch [postcode] in accordance with the terms of the application, Ref 8/21/0547/HOU, dated 20 May 2021, and the plans submitted with it, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    Other than to comply with Condition 3 below, the development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan; Block/Site Plan; A 01 Revision 2.

    The access points and parking area hereby permitted shall not be brought into use until they have been completed in accordance with further details that shall first have been submitted to, and approved in writing by, the local planning authority. These further details shall include the layout and surface materials of the accesses, parking, and manoeuvring areas, and the provision of pedestrian visibility splays. These facilities shall thereafter be permanently retained in accordance with the approved details.

  2. Section 03

    Main Issue

    The main issue is the effect of the development on highway safety.

  3. Section 04

    Reasons

    The appeal property is a bungalow that fronts a section of the B3347 called [address]. It has a pedestrian gate leading to its front door off this road, but its garage and car parking area are at the rear. Vehicular access is achieved via [address], a small cul de sac off [address], which has a junction with [address] approximately 40 metres to the north of the appeal site. The bungalow immediately to the north, and the three to the south, have similar arrangements, with pedestrian accesses to the front, and car parking at the rear. However, the dwellings fronting [address] to the north of [address], and to the south of No 186, have direct vehicular access to the B3347.

    It is proposed to create a vehicular access from [address] to allow for an extensive car parking area encompassing most of the front garden. Two separate access points would be provided, which would allow vehicles to enter and leave the site in a forward gear.

    [address] is classified as a District Distributor Road (DDR). Saved Policy T1 of the Borough of Christchurch Local Plan (2001) (the Local Plan) says that access to DDRs will be limited. However, whilst the policy states that there will be no frontage access on newly constructed DDRs, it does not place a blanket prohibition on proposals for new accesses to existing roads in this classification. Paragraph 7.22 explains that the policy is necessary to reduce the number of potential conflict points, and to improve road safety and the free flow of traffic.

    I saw that [address] is a fairly busy road, linking Christchurch with the smaller settlements to the north and northwest. However, while it carries a considerable level of traffic, I observed that the flow of vehicles was not continuous, and there were regular gaps. During my visit, I observed several vehicles utilising these breaks in the flow to turn into and out of [address]. One right-turning vehicle resulted in two cars momentarily waiting behind it while it completed the manoeuvre. I also saw two vehicles emerging from individual accesses to the north of [address], with no impact on the free flow of traffic.

    I appreciate that my visit was during the middle of the day, rather than during the morning or afternoon peak, when traffic volumes are likely to be higher. However, there is no evidence before me to indicate that this is a road that suffers from regular traffic congestion, or where its use is so close to capacity that any interruption to the flow of traffic would result in queues. There are already a significant number of individual accesses to the north and south of the site, so the additional movements onto and off [address], associated with a single dwelling, would not be significant. Such manoeuvres would, in any event, displace similar manoeuvres onto and off the DDR to access the parking area to the rear, via [address]. The development would not, therefore, be likely to have any noticeable impact on the free flow of traffic on [address].

    [address] is straight, and there is a footpath outside the appeal site. Consequently, a driver emerging from the proposed access would have unrestricted visibility to the left and right for a considerable distance. Similarly, drivers and cyclists using [address], in either direction, would have long range visibility of a vehicle emerging from the access. The road is subject to a 40-mph speed limit, and its alignment and width allows vehicles to travel at or near that speed. However, no evidence has been provided to demonstrate that the visibility available to emerging and passing drivers would fall short of recommended standards for these speeds. Consequently, I see no reason why the proposal would lead to dangerous conflict with bicycles or vehicles using the DDR.

    The proposal would result in vehicles crossing the footpath to access the parking area, resulting in potential conflict with pedestrians. However, the number of vehicle movements associated with a single dwelling would be limited. Furthermore, I did not see any pedestrians using the footpath during the hour I spent observing the site. I realise that this was during the middle of the day, but there is no evidence to indicate that the footpath carries significant levels of pedestrian traffic at other times. Consequently, the likelihood of conflict between vehicles and pedestrians on the footpath is low. Moreover, pedestrians walking this route, in either direction, will have already encountered numerous vehicle crossing points before passing the appeal site. The additional access, for a single dwelling, would not, therefore, result in a material increase in the potential danger to pedestrians along this route.

    In view of the above considerations, I conclude that the proposed access would not result in harm to the free flow of traffic on the DDR, or dangerous conflict between vehicles using the access and other road users. In coming to this view, I am mindful of the Council’s concern that parking on the forecourt could reduce the available manoeuvring space, resulting in vehicles reversing onto the road. However, this is not a likely prospect, as the proposed layout shows that three cars could comfortably be parked on the site, with sufficient space remaining for the entry/exit system to successfully allow all drivers to enter and leave in a forward gear. However, I have imposed a condition requiring details of the parking and manoeuvring areas to be submitted for approval, to ensure that the optimum layout is secured and retained, including suitable pedestrian visibility splays to ensure that there would be no harm to the safety of users on the footpath.

    Whilst Policy T1 of the Local Plan seeks to limit access to DDRs, in the particular circumstances of this case, there would be no harm to the free flow of traffic, or a material increase in highway conflicts. I appreciate that the Policy seeks to avoid the cumulative impact of a multitude of similar accesses, and that approval of one individual proposal can make it more difficult to resist others. However, in this case, the overwhelming majority of dwellings along this stretch of road already have direct vehicular access to [address]; the appeal site is one of a very small number that do not. The cumulative effect of the limited number of other proposals that may follow is, therefore, also unlikely to result in the harmful impacts that Policy T1 seeks to avoid.

    The Council’s reason for refusal states that the provision of a second dropped kerb would be contrary to the Council’s dropped kerb guidance. That guidance does, however, say that a second dropped kerb may be considered where it would be safer and/or it would not significantly affect on-street parking. I saw that there were no vehicles parked along the entire length of [address] at the time of my visit, so the loss of a small stretch of potential parking would not be significant. In any event, the process for applying for a dropped kerb is separate to the planning process. The availability of alternative parking to the rear is not a reasonable justification for withholding planning permission for a proposal that will cause no harm to highway safety or traffic flow.

    The Council’s reason for refusal also states that the proposal would be contrary to its Parking Standards Supplementary Planning Document (2021). However, my attention has not been drawn to any particular part of the document, and I note that its overall aim is to set out parking standards in new residential and non-residential development. Consequently, it does not appear to be relevant to the appeal proposal.

    In conclusion, although the proposal would involve the provision of an access to a DDR, it would not be harmful to the free flow of traffic or to highway safety. It would, therefore, accord with the rationale underpinning Policy T1 of the Local Plan. It would also comply with Policy KS11 of the Christchurch and East Dorset Local Plan Part 1 – [name] (2014), which says development must be designed to provide safe access onto the existing transport network. The development would also accord with the aims of the National Planning Policy Framework to create places that are safe, secure, and attractive – which minimise scope for conflicts between road users, and ensure safe and suitable access to development.

  4. Section 05

    Conditions

    In accordance with the legislation, I have imposed a condition limiting the period within which the development must commence. I have also included a condition specifying the relevant plans, as this provides certainty. The Council has suggested two further conditions, to secure a suitable layout and ensure pedestrian visibility. I agree that such conditions are necessary, but I have combined and altered them, in the interests of clarity and precision.

  5. Section 06

    Conclusion

    For the reasons given above, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 377No official casework-database value to compare
    Extracted decision date · page 1
    28 January 2022Matches the official casework database
    Extracted site visit dates
    24 January 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3286796
Application reference
8/21/0547/HOU
Lead case reference
Not recorded
Planning authority
Bournemouth, Christchurch and Poole
Planning authority code
E06000058

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
145 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
12 November 2021
Valid date
12 November 2021
Start date
4 December 2021
Planning authority decision date
4 October 2021
Appeal decision date
28 January 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
9624
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21