Skip to main content
Official casework recordDismissedCurrent release

Appeal 3286865

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

12 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a hipped to clipped hipped roof extension with front dormer, extension of rear dormer and front rooflight to be repositioned.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Procedural Matter

    In the interest of accuracy and conciseness, the description of development in the header above is based on the decision notice.

  4. Section 05

    [name]

    The main issues are: o Whether the proposed development would be inappropriate development in the Green Belt for the purposes of the National Planning Policy Framework (the ‘Framework’) and development plan policy; o The effect of the proposal on the openness of the Green Belt; o The effect of the development on the character and appearance of the area; and o if the development would be inappropriate, whether the harm to the Green Belt by way of inappropriateness and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify it.

  5. Section 06

    Whether the development would be inappropriate development

    The appeal property comprises a semi-detached one and a half storey dwelling situated amongst a small grouping of properties within the Green Belt. The property is L-shaped and features a hipped roof and existing rear and side extensions as well as a rear dormer window. A stable building also lies at the end of the rear garden.

    Paragraph 149 of the Framework states that new development is inappropriate in the Green Belt unless it falls within the given list of exceptions. Exception (c) addresses the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Policy PMD6 of the [name] and Policies for Management of Development 2015 document (the ‘[name]) is consistent with this as it also states that the extension of a building in the Green Belt must not result in disproportionate additions over and above the size of the original building. It adds that, in the case of residential extensions, this means no larger than two reasonably sized rooms or any equivalent amount.

    The Council states that the proposal, combined with previous extensions, would represent a disproportionate increase in floor area over the original building and would exceed the two reasonably sized room allowance referred to above. Whilst the proposed uplift in floorspace would be modest with the floor area only increasing by 14 sqm, it would not be proportionate in the context of the size of the original dwelling, which has already been substantially enlarged. Furthermore, the increase in width of the rear dormer and built form at first floor level of the dwelling would result in greater visual bulk. Therefore, I conclude that the scale of the extensions, taken in combination with previous extensions, would represent a disproportionate addition over and above the size of the original building.

    On this basis, the proposal would be inappropriate development in the Green Belt and would conflict with Paragraph 149(c) of the Framework, as detailed above, and Policy PMD6 and CSSP4 of the [name] which together seek to resist inappropriate development in the Green Belt.

  6. Section 07

    Openness

    Openness is identified in the Framework as one of the Green Belt’s essential characteristics. It has a spatial aspect as well as a visual aspect. The additional bulk and volume as a result of the enlargement of the rear dormer and alteration of the roof would materially impact on openness in a spatial aspect resulting in some limited harm to the Green Belt.

    Furthermore, the increase in floorspace, volume of roofscape and first-floor bulk due to the enlarged width of the rear dormer means the proposal would also have a greater visual impact on the openness of the Green Belt. I acknowledge the proposed roof form would be similar to the adjoining semi-detached property. However, given the side boundaries of the site are quite open, the excessive size of the rear dormer would be visible to adjacent occupiers on [address]. In my view, the visual harm that would occur in this regard would be greater than any benefits derived from creating a more symmetrical rear elevation. For these reasons, the proposed development would result in an adverse impact on both the spatial and visual openness of the Green Belt resulting in limited harm to the Green Belt.

  7. Section 08

    Character and appearance

    The proposed alteration of the roof form from a hipped roof to a clipped hipped roof and the integration of a front roof dormer would harmonise well with the adjacent dwelling, improving the symmetry and visual cohesion of the two properties. However, the proposed enlargement of the rear dormer would appear unacceptably bulky. Indeed, whilst the development would be finished with sympathetic materials, the resultant width and depth of the rear dormer would be excessive. The appellant states that its width would match the width of the neighbouring rear dormer, however, it would be significantly larger than the adjoining dormer, as it would sit forward of it, and so would appear much larger and more dominant.

    Furthermore, the dormer would occupy more than three fifths of the height of the roof and more than three fifths of the width of the roof, thereby conflicting with the guidance set out within the Council’s ‘[name] & Extensions’ Supplementary Planning Document (SPD). The proportions of the resultant dwelling would thus not be well-balanced as a result of the enlarged dormer, which would be read as an incongruous addition.

    I note that the appellant has submitted an application for an enlarged dormer through the Permitted Development (PD) process (ref. 21/01847/CLOPUD) and has provided the drawings as part of Appendix 2 to the appeal statement. Whilst the appellant contends that the proposal would be more visually coherent than the PD scheme, it would appear bulkier given it would be of greater depth.

    The rear aspect and eastern side elevation of the resultant dwelling would be awkwardly proportioned, appearing top-heavy because of the enlarged rear dormer. The development would be out of scale with the surrounding built form and would therefore have an adverse effect on the character and appearance of the surrounding area.

    Given the above, the proposed development would have an adverse impact on the character and appearance of the host dwelling and surrounding area. It would conflict with Policies CSTP22 and PMD2 of the [name], the Framework and the ‘[name] and Alterations’ (SPD) which together seek to ensure proposals are well-designed and do not harm their surrounding contexts.

  8. Section 09

    Other considerations

    The Framework highlights that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances, with substantial weight given to any harm to the Green Belt. Very special circumstances will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.

    In this regard, the appellant has drawn my attention to a fallback position through the PD process emphasising that an application for an enlarged dormer has been submitted (ref. 21/01847/CLOPUD). As mentioned above, the appellant opines that the rear dormer as proposed would be more in-keeping with the host dwelling than the PD scheme and the impact on the Green Belt would be comparable. I appreciate the fact that the proposed rear dormer would appear more symmetrical and visually coherent. However, the prior approval scheme, if granted, would lead to a smaller increase in added bulk and volume and would have less of an impact on the spatial and visual openness of the Green Belt. I therefore attach only very limited weight to this consideration.

  9. Section 10

    Planning Balance and Overall Conclusion

    I consider that the development causes harm to the Green Belt by way of its inappropriateness and limited harm to its openness, and substantial weight must be given cumulatively to this harm. It would also have an adverse impact on the character and appearance of the host dwelling and surrounding area. I have taken into account the impact of the potential permitted development fallback position, to which I have attached very limited weight. On balance, the weight attributed to the other considerations in this case does not clearly outweigh the harm I have identified. I conclude therefore there are no very special circumstances to justify the development.

  10. Section 11

    Recommendation

    For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.

  11. Section 12

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3394No official casework-database value to compare
    Extracted decision date · page 1
    3 October 2022Matches the official casework database
    Extracted site visit dates
    23 August 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3286865
Application reference
21/01072/HHA
Lead case reference
Not recorded
Planning authority
Thurrock Borough Council
Planning authority code
E06000034

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
13 November 2021
Valid date
13 November 2021
Start date
15 February 2022
Planning authority decision date
25 August 2021
Appeal decision date
3 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
21336
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21