Skip to main content
Official casework recordDismissedCurrent release

Appeal 3286875

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Preliminary Matters

    Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions.

    Where an application is made for a determination as to whether prior approval is required for development, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply.

  4. Section 05

    Main Issue

    I consider that the main issue in this appeal is whether the proposed development would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.

  5. Section 06

    Reasons for the Recommendation

    The GPDO as amended states that development is not Permitted Development (PD) where ‘any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j)’.

    Regarding the appeal before me, paragraph (j) (iii) which states ‘the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse and would have a width greater than half the width of the original dwellinghouse’ applies. ‘Original dwellinghouse’ means the house as it was first built or as it stood on 1 July 1948 (if it was built before that date). Although the current owner may not have built an extension to the house, a previous owner has done so.

    The Council has provided evidence to demonstrate that the appeal property has previously been extended to its side and rear. The proposed rear extension would extend to a width which would be more than half the width of the original dwelling. As such, it would not comply with the provisions of the GDPO and permission cannot be granted.

  6. Section 07

    Other Matters

    I am aware of the appellant’s unhappiness with the Council regarding the way their application was processed. However, this is not a matter before me.

  7. Section 08

    Conclusion and Recommendation

    For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed. Ifeanyi Chukwujekwu APPEALS PLANNING OFFICER

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report, and on that basis, I agree with the recommendation and shall dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2815No official casework-database value to compare
    Extracted decision date · page 1
    11 August 2022Matches the official casework database
    Extracted site visit dates
    25 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3286875
Application reference
3525/21
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
18 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 November 2021
Valid date
8 December 2021
Start date
11 January 2022
Planning authority decision date
Not recorded
Appeal decision date
11 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
19070
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21