Appeal 3286980

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the removal of existing workshop and the erection of a new workshop

  1. Section 02

    Decision

    The appeal is allowed, and planning permission Ref 210125 for the removal of existing workshop and the erection of a new workshop at [site address] granted on 1 October 2021 by Reading Borough Council, is varied by deleting conditions 5 and 6.

  2. Section 03

    Background and Main Issue

    The application was submitted seeking planning permission for a replacement building. The replacement building would be similar in footprint, siting and design to the existing building. There was no proposed intensification of the existing coach hire business use.

    The scheme was approved but due to the lack of a sustainability or energy statement, the permission was granted with two conditions specifying that an interim and final certificate from BREEAM should be provided to demonstrate compliance with a minimum standard of [name] rating. The Council say that the disputed conditions are necessary to comply with sustainable building standards in accordance with Policy CC2 of the Reading Borough Council Local Plan 2019 (LP).

    The main issue is whether the conditions are reasonable, necessary or relevant to the development in the interests of energy efficiency and the environmental performance of the proposed development.

  3. Section 04

    Reasons

    LP Policy CC2 indicates that development will be acceptable where the design of buildings and site layouts use energy, water, minerals, materials and other natural resources appropriately, efficiently and with care and take account of the effects of climate change. It goes onto to indicate that to meet these requirements all minor non-residential developments are required to meet the most up to date BREEAM ‘[name] standard as a minimum.

    The Council’s Sustainable Design and Construction Supplementary Planning Document 2019 (SPD) provides advice and guidance for developers and the Council on the implementation of sustainability policies, such as Policy CC2. The aims of the policy and SPD, amongst other matters, is to improve the environmental performance of new development in order to help tackle climate change.

    There is no dispute over whether the conditions are relevant to planning, enforceable or precise. As the proposal is a minor non-residential development, the condition is relevant to the development permitted. Although the proposed scheme would not result in any change of use and is a replacement building, LP Policy CC2 includes proposals for the redevelopment and refurbishment of existing building stock. This would be the case in this instance.

    The appellant has submitted correspondence from two consultants1 seeking to demonstrate that it is not possible for the approved building to achieve a BREEAM ‘[name] standard as a minimum.

    [name] clearly indicates that the appellant would be unable to carry out a BREEAM assessment on an unheated maintenance building. [name] acknowledge that Melin consultants indicated a fee for an assessment, this is part of the initial email to the appellant. In the later exchange of emails there is clear inference that an unheated building of this size would be difficult to assess. Together, this indicates that it is highly unlikely that the building could achieve the BREEAM ‘[name] standard, as required by the condition. There is no substantive evidence from the Council to refute this or that the condition could be met in this instance. I, therefore, conclude that the condition is unreasonable.

    I note that the condition has been added to ensure compliance with the specific BREEAM requirements set out in LP Policy CC2. However, notwithstanding the practical difficulties associated with a development of this size and intended use achieving the BREEAM ‘[name] standard, no substantive evidence is before me to indicate that without the condition the proposed building would have been refused due to its lack of energy efficiency and poor environmental performance. I note that it is acknowledged within the Application Report that the sustainability credentials of the existing building are low, and a modern replacement could result 1 [name] and Melin consultants in a more sustainable and efficient building. For these reasons, I find that the condition is unnecessary to make the development acceptable.

    The Council cite Policy H5 of the LP in the reasons for condition 6. However, Policy H5 refers to standards for housing. The proposed scheme does not include any residential development and, as such, it is not relevant to the scheme.

  4. Section 05

    Other Matters

    I have had regard to the representations received. I appreciate the concerns raised around the existing use, including traffic and road safety implications, damage to private property, safety of neighbouring residents as well as noise and disturbance matters. However, the proposal before me is with respect to a conditions relating to the energy performance of the replacement building, and not the use of the site as a coach hire business. As such, the matters raised do not alter my position on the main issue of the appeal.

  5. Section 06

    Conclusion

    For the reasons given above, I find that the disputed conditions are not reasonable or necessary in the interests of the energy efficiency and environmental performance of the proposed development. I conclude that the appeal should be allowed, and the conditions removed as set out in the formal decision.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2298No official casework-database value to compare
    Extracted decision date · page 1
    3 August 2022Matches the official casework database
    Extracted site visit dates
    14 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3286980
Application reference
210125
Lead case reference
Not recorded
Planning authority
Reading Borough Council
Planning authority code
E06000038

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor general industry/storage/warehousing
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.0673 hectares
Floor space
64 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
15 November 2021
Valid date
15 November 2021
Start date
30 March 2022
Planning authority decision date
1 October 2021
Appeal decision date
3 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
18725
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21