Appeal 3286980
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the removal of existing workshop and the erection of a new workshop
Section 02
Decision
The appeal is allowed, and planning permission Ref 210125 for the removal of existing workshop and the erection of a new workshop at [site address] granted on 1 October 2021 by Reading Borough Council, is varied by deleting conditions 5 and 6.
Section 03
Background and Main Issue
The application was submitted seeking planning permission for a replacement building. The replacement building would be similar in footprint, siting and design to the existing building. There was no proposed intensification of the existing coach hire business use.
The scheme was approved but due to the lack of a sustainability or energy statement, the permission was granted with two conditions specifying that an interim and final certificate from BREEAM should be provided to demonstrate compliance with a minimum standard of [name] rating. The Council say that the disputed conditions are necessary to comply with sustainable building standards in accordance with Policy CC2 of the Reading Borough Council Local Plan 2019 (LP).
The main issue is whether the conditions are reasonable, necessary or relevant to the development in the interests of energy efficiency and the environmental performance of the proposed development.
Section 04
Reasons
LP Policy CC2 indicates that development will be acceptable where the design of buildings and site layouts use energy, water, minerals, materials and other natural resources appropriately, efficiently and with care and take account of the effects of climate change. It goes onto to indicate that to meet these requirements all minor non-residential developments are required to meet the most up to date BREEAM ‘[name] standard as a minimum.
The Council’s Sustainable Design and Construction Supplementary Planning Document 2019 (SPD) provides advice and guidance for developers and the Council on the implementation of sustainability policies, such as Policy CC2. The aims of the policy and SPD, amongst other matters, is to improve the environmental performance of new development in order to help tackle climate change.
There is no dispute over whether the conditions are relevant to planning, enforceable or precise. As the proposal is a minor non-residential development, the condition is relevant to the development permitted. Although the proposed scheme would not result in any change of use and is a replacement building, LP Policy CC2 includes proposals for the redevelopment and refurbishment of existing building stock. This would be the case in this instance.
The appellant has submitted correspondence from two consultants1 seeking to demonstrate that it is not possible for the approved building to achieve a BREEAM ‘[name] standard as a minimum.
[name] clearly indicates that the appellant would be unable to carry out a BREEAM assessment on an unheated maintenance building. [name] acknowledge that Melin consultants indicated a fee for an assessment, this is part of the initial email to the appellant. In the later exchange of emails there is clear inference that an unheated building of this size would be difficult to assess. Together, this indicates that it is highly unlikely that the building could achieve the BREEAM ‘[name] standard, as required by the condition. There is no substantive evidence from the Council to refute this or that the condition could be met in this instance. I, therefore, conclude that the condition is unreasonable.
I note that the condition has been added to ensure compliance with the specific BREEAM requirements set out in LP Policy CC2. However, notwithstanding the practical difficulties associated with a development of this size and intended use achieving the BREEAM ‘[name] standard, no substantive evidence is before me to indicate that without the condition the proposed building would have been refused due to its lack of energy efficiency and poor environmental performance. I note that it is acknowledged within the Application Report that the sustainability credentials of the existing building are low, and a modern replacement could result 1 [name] and Melin consultants in a more sustainable and efficient building. For these reasons, I find that the condition is unnecessary to make the development acceptable.
The Council cite Policy H5 of the LP in the reasons for condition 6. However, Policy H5 refers to standards for housing. The proposed scheme does not include any residential development and, as such, it is not relevant to the scheme.
Section 05
Other Matters
I have had regard to the representations received. I appreciate the concerns raised around the existing use, including traffic and road safety implications, damage to private property, safety of neighbouring residents as well as noise and disturbance matters. However, the proposal before me is with respect to a conditions relating to the energy performance of the replacement building, and not the use of the site as a coach hire business. As such, the matters raised do not alter my position on the main issue of the appeal.
Section 06
Conclusion
For the reasons given above, I find that the disputed conditions are not reasonable or necessary in the interests of the energy efficiency and environmental performance of the proposed development. I conclude that the appeal should be allowed, and the conditions removed as set out in the formal decision.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2298No official casework-database value to compare
- Extracted decision date · page 1
- 3 August 2022Matches the official casework database
- Extracted site visit dates
- 14 June 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3286980
- Application reference
- 210125
- Lead case reference
- Not recorded
- Planning authority
- Reading Borough Council
- Planning authority code
- E06000038
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor general industry/storage/warehousing
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.0673 hectares
- Floor space
- 64 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 15 November 2021
- Valid date
- 15 November 2021
- Start date
- 30 March 2022
- Planning authority decision date
- 1 October 2021
- Appeal decision date
- 3 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 18725
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21