Skip to main content
Official casework recordAllowedCurrent release

Appeal 3287066

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

adding a roof dormer to provide space for an upstairs bathroom. Rear extension to provide more kitchen space and utility room.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission Ref 21/03373/H for adding a roof dormer to provide space for an upstairs bathroom, rear extension to provide more kitchen space and utility room at [site address] , Bedminster, Bristol [postcode] granted on 18 June 2021 by Bristol City Council is varied by deleting condition 2 and substituting it for the following condition.:

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and/or re-enacting that Order) the proposed side elevation window shall be top hung and glazed with obscure glass to a specification to be agreed with the Local Planning Authority and shall be permanently maintained thereafter as top hung and obscure glazed.

  2. Section 03

    Preliminary Matters

    Planning permission was granted for extensions to the appeal property. This included a new first floor side elevation window for a bathroom. A condition was imposed requiring the window to be non-opening and fitted with obscure glazing. The appellant states that the appeal relates to the non-opening aspect of the condition. I have considered the appeal on that basis.

    While the whole scheme is part of the appeal before me, I have focussed my reasoning on the window subject to the disputed condition.

  3. Section 04

    Main Issue

    The main issue of the appeal is the effect that varying the disputed condition would have on the living conditions of the occupiers of [address], with particular regard to privacy.

  4. Section 05

    Reasons

    The first-floor window subject to the disputed condition would face the side elevation of [address] (No 23) and there is only low planting on the boundary. However, some mutual overlooking is inevitable and tolerable in residential areas. This already occurs from existing ground floor side elevation windows at the appeal site that face those at No 23.

    There are no first-floor windows at No 23 opposite the proposed window. Direct views would instead be towards the sloping roof surface of No 23. The lower land level at No 23 would mean only limited views towards its ground floor openings from the new window. Views towards the rear garden of No 23 would be angled, limiting the extent of the overlooking that would take place.

    Therefore, the element of the disputed condition requiring the window to be non-opening is not necessary or reasonable. Its removal would not unacceptably harm the living conditions of the occupiers of [address] with regard to privacy. The condition is deleted and replaced by one requiring the window to be top hung and obscure glazed.

    The council have not referred to any specific planning policy in their reason for the condition. However, replacing the condition would accord with the aim of the National planning Policy Framework to ensure a high standard of amenity for existing and future users.

  5. Section 06

    Other Matters

    The rear extension would not be of significant height or depth so would have a limited effect on the outlook from and light reaching [address]. Any noise and disturbance during the construction of the proposal would be temporary and not for a significant period given the scale of the works. The first-floor addition the disputed condition related to is for a non-habitable room so unlikely to lead to significant additional noise. Issues relating to noise from the existing property and compliance with Building Regulations are outside the scope of this appeal.

    There is no substantive evidence that the proposal would lead to an increase in on street parking that could not be accommodated. Similarly, no clear case has been made that the use of renewable energy is a policy required for the scheme. The proposal is for the property to remain a single dwelling. Any potential breach of planning would be a matter for the Council.

  6. Section 07

    Conclusion

    In exercising my function on behalf of a public authority, I have had due regard to the Public Sector Equality Duty (PSED) contained in the Equality Act 2010, which sets out the need to eliminate unlawful discrimination, harassment and victimisation, and to advance equality of opportunity and foster good relations between people who share a protected characteristic (in this case disability) and people who do not share it.

    I acknowledge the personal health circumstances of a nearby occupier. Notwithstanding this, the adverse impacts of allowing the scheme on those with protected characteristics would be proportionate as it would not cause unacceptable harm to their living conditions. As such, it does not follow from the PSED that the appeal should fail.

    I therefore allow the appeal, replacing condition 2 to allow the window to be top hung rather than non-opening.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 151No official casework-database value to compare
    Extracted decision date · page 1
    2 March 2022Matches the official casework database
    Extracted site visit dates
    22 February 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3287066
Application reference
21/03373/H
Lead case reference
Not recorded
Planning authority
Bristol City Council
Planning authority code
E06000023

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.03 hectares
Floor space
24 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
16 November 2021
Valid date
16 November 2021
Start date
30 December 2021
Planning authority decision date
10 September 2021
Appeal decision date
2 March 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
11542
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21