Appeal 3287071
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
boundary fence alteration to increase height at rear
Section 02
Decision
The appeal is allowed and planning permission is granted for alterations to boundary fence to increase height at the rear at [site address] , in accordance with the terms of the application, Ref 21/02451/HOU, dated 22 June 2021, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Block Plan (scale 1:500) depicting location of the proposed fence; aerial photograph depicting location of proposed fence; side elevation photographs depicting 600mm translucent panel on top of existing timber boundary fence.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 04
Reasons
The proposal seeks permission to increase the height of a rear garden fence which runs directly along the shared boundary between Nos 5 and [address]. This would be achieved through the addition of a 600mm high Perspex panel attached to the top of the existing timber fence. The area is predominantly residential in character. [address] is a reasonably busy thoroughfare but the rear has a quieter feel with the rear garden of the appeal property backing onto the neighbouring housing at [address]. The gardens of surrounding properties are of modest scale, generally separated by timber fencing of varying heights, alongside established planting.
From street level on [address] the shared boundary between Nos 5 and 7 is not prominent due to the fence to the opposite side boundary of No. 7 which directly abuts the pavement. Due to that fence and the intervening space, the proposed boundary treatment would not have any notable visual impact in the wider area, notwithstanding its increased height. For the most part it would go unnoticed by those passing along the street. The primary impact would be at the very local level, as seen from the dwelling and rear garden of the appeal property itself and from the neighbouring house and garden at No7.
Somewhat unusually, the rear gardens do not run directly in line with the rear of the dwellings but are off-set at an angle. The floor level of the dwellings is also set above the level of the gardens. As a result of those two factors the rear windows of No.7 face on a slight angle towards the rear of No.5 which does result in a sense of being overlooked when stood in the rear garden. The proposed increase in height of the fence would mitigate against that and the resulting fence would be slightly higher than a typical rear boundary enclosure. However, given the raised floor height of the dwellings the fence would not be overly dominant when viewed from inside No.7.
Moreover, immediately to the rear of No.7 is a patio/ decking area which is also raised above ground level. Given the respective heights, the proposed fence would not be overly dominant or oppressive from the neighbouring patio. The proposed use of Perspex would also enable light to pass through the panel which would reduce the apparent visual impact. The choice of material would clearly contrast against the timber of the fence and would not be a common form of boundary treatment within the area. However, although a trellis may be a more traditional solution, glazed or Perspex screens are not unusual where privacy is required in urban areas and, in this instance, it would offer a lightweight and transparent solution that would enhance boundary screening without appearing overly dominant from the neighbouring house and garden.
Given that, and the fact that there would be no substantial impact when viewed from the street I am satisfied that the proposal would not result in harm to the character and appearance of the area and that it would be an appropriate design response to the specific characteristics of the site, including the respective heights of the dwellings and unusual alignment of the gardens. As such, the proposal would not conflict with the design related aims of policies D1, D3 and D8 of the London Plan (2021), Core Policy 30 of the [name] (2010) and policies DMD6 and DMD37 of the Council’s Development Management Document (2014).
A number of representations were received by the Council at the application stage including objections on visual impact which are covered above but also in relation to air flow to the rear of the adjacent property. The Council was satisfied that the impact on neighbouring living conditions would be acceptable and I am satisfied that the height of the fence would not restrict light or air reaching the rear of the adjacent property, given the respective heights and the fact that the garden is large enough to maintain a feeling of openness which would not be unduly constrained by the modest increase in the height of the fence.
Representations were received by the Council to the effect that the fence may be owned by No.7. That is a private matter between the parties involved and does not affect my assessment of the planning merits of the proposal.
Section 05
Conditions
Neither party has suggested any conditions in the event that the appeal is allowed. However, in addition to the standard commencement condition, a condition is necessary to ensure that the proposal complies with the submitted plans in the interests of clarity.
Section 06
Conclusion
For the reasons given above I conclude that the appeal should be allowed subject to the conditions set out.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 211No official casework-database value to compare
- Extracted decision date · page 1
- 4 February 2022Matches the official casework database
- Extracted site visit dates
- 19 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3287071
- Application reference
- 21/02451/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 November 2021
- Valid date
- 16 November 2021
- Start date
- 26 November 2021
- Planning authority decision date
- 26 August 2021
- Appeal decision date
- 4 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 10046
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21