Skip to main content
Official casework recordDismissedCurrent release

Appeal 3287951

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Main Issue

    The main issue is the impact of the proposed development on the living conditions of the occupiers of No. [address] with regard to outlook.

  4. Section 05

    Reasons for the Recommendation

    The host property is a semi-detached dwelling with an existing single storey rear extension used as a kitchen. The extension extends to approximately half the width of the dwelling leaving a paved area, covered with a pergola, between it and the shared boundary with the adjoining dwelling.

    No. [address] is the adjoining semi-detached dwelling, which also benefits from a single storey rear extension away from the shared boundary. It has patio doors serving a living room on the rear elevation of the main part of the house, close to the party boundary. There is a high fence separating the properties.

    The guidance in policy HE5 of the House Extensions Supplementary Planning Document (2006) (SPD) states that permission would not normally be granted for rear extensions that project beyond a 45-degree line drawn from 3m along the common boundary from the rear elevation of the adjoining dwelling. In this case the proposed extension would clearly project beyond this line so does not meet the guidance in the SPD.

    Moreover, the proximity of the extension to the party boundary, its height above the boundary fence and its rearward projection would have a significant enclosing effect upon the outlook from the living room patio doors of No. 12. Furthermore, it would, along with the rearward extension of No. 12 have an overbearing tunnelling effect on the rear garden area close to these doors, making this space and the living room less pleasant spaces to spend time in.

    I note that the appellant states that the proposal would fall within the limits for permitted development, except for the side projection of the existing rear extension. However, the proposal before me relates to an application for planning permission and I have assessed it accordingly.

    In conclusion, the proposed development would have an unacceptably harmful effect on the living conditions of the occupiers of No. [address], with particular regard to their outlook. It would therefore fail to comply with Policy DES7 of the Salford Unitary Development Plan (2006) which amongst other things seeks to ensure that development does not have an unacceptable impact on the amenity of the occupiers of other developments. It would also conflict with the guidance in the SPD, as set out above.

  5. Section 06

    Other Matters

    Whilst there are no formal objections from the current neighbours, the National Planning Policy Framework requires that development creates places that provide a high standard of amenity for both existing and future users.

  6. Section 07

    Conclusion and Recommendation

    The proposed development conflicts with the development plan as a whole and there are no other considerations, that outweigh this conflict. I therefore recommend that the appeal is dismissed

  7. Section 08

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 605No official casework-database value to compare
    Extracted decision date · page 1
    23 May 2022Matches the official casework database
    Extracted site visit dates
    3 May 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3287951
Application reference
21/78368/HH
Lead case reference
Not recorded
Planning authority
Salford City Council
Planning authority code
E08000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
21 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 November 2021
Valid date
8 December 2021
Start date
10 January 2022
Planning authority decision date
24 November 2021
Appeal decision date
23 May 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
15567
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21