Appeal 3288550
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
extension over existing garage to include new dormers and balcony to rear.
Section 02
Decision
The appeal is dismissed insofar as it relates to extension over existing garage to include new dormers. The appeal is allowed insofar as it relates to balcony to rear and planning permission is granted for balcony to rear at [site address] in accordance with the terms of the application, Ref 21/00907/FUL, dated 4 April 2021, and subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan; Block Plan; [name]/[name]; Proposed First Floor Plan/[name]/[name]; and [name] and [name]/[name].
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 03
[name]
The description of the development provided on the planning application form has been replaced by an amended version on the decision notice and in subsequent appeal documents. I consider that subsequent description to accurately represent the proposal and I have therefore used it within this
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host property and the streetscape.
Section 05
Reasons
The proposed extension would project to the front of the main building and would include a roof extending to the ridge of the main roof of the dwelling. The flank wall of the extension would also project above the eaves of the front elevation of the dwelling. Even allowing for the existing attached garage, the proposed extension would appear as an overdominant and obtrusive feature projecting to the front of the building in a location which is readily visible within the streetscape.
The proposed dormer windows would be tile-hung and have pitched roofs, which the appellant indicates was requested by the Council. There are also other dwellings in the area which have dormer windows. However, the number and design of the dormers, including their extent between the eaves and the ridge of the roof, would not reflect the appearance of the main building and other dwellings in the area, and would give the roof of the extension an incongruous and cluttered appearance. This would add to the harm arising from the scale and design of the extension in this prominent location.
The area contains buildings of a variety of designs and scale. However, even within this varied context, the proposed extension would appear as an obtrusive feature in views of the existing dwelling and nearby properties.
The balcony to the rear would extend across the full width of the main rear elevation of the building at first floor level. However, it would be a lightweight structure with a limited projection. It would not be readily visible from the public realm, and due to its lightweight appearance and scale it would not be unduly intrusive in views from neighbouring properties. On that basis, the balcony would not be harmful in respect of character and appearance.
Notwithstanding my conclusions in respect of the balcony, I conclude that the proposed extension would, due to its design and scale, lead to significant harm to the character and appearance of the host property and the streetscape. The extension would therefore be contrary to Policy CS10 of the [name] 2009 as well as Policies D9 and D10 of the Development Policies Document 2009 which together require high quality design for new development, that extensions should respect the character and scale of the dwelling, and should not cause harm to the character of the area, amongst other things. The extension would also conflict with the National Planning Policy Framework with regards to achieving well-designed places.
The extension would also be contrary to the advice of the Residential Design Guide Supplementary Planning Document 2018 which sets out that extensions should be subordinate to the original house.
Section 06
Other Matters
The balcony could lead to elevated views of neighbouring residential properties. However, an existing side and rear extension would provide significant screening of views of the property to the north, and this would be further mitigated by the set-back from the site boundary. The proposed balcony would also enable elevated views in relatively close proximity to the boundary with the dwelling to the south. However, this would primarily be of a driveway leading to a garage, and the latter would provide a significant degree of screening of the rear garden of the neighbouring property. Although there are windows to the side of the dwelling to the south, due to the relative arrangement of the buildings the proposed balcony would not enable unacceptably intrusive views into the neighbouring dwelling. Due to the topography of the area, I also saw that elevated views of the property to the south were enabled by an existing patio area to the rear of the appeal site.
On the basis of the screening provided by existing buildings, the nature of views provided by the existing site, and the limited projection of the balcony, the proposal would not lead to a degree of overlooking which would lead to unacceptable harm to the living conditions of neighbouring residents with regards to privacy. This reflects the conclusions of the Council on this matter.
I am mindful of the appellant’s intention to provide improved accommodation for their family. However, this private benefit would not be sufficient to outweigh the significant harm that I have identified in respect of character and appearance.
In support of the appeal, the appellant refers to development approved in the vicinity of the site. However, I have not been provided with sufficient details on these schemes to determine if they represent a direct parallel to the appeal proposal, which I have in any event determined on its own merits.
Section 07
Conclusion
I have concluded that the proposed extension over existing garage to include new dormers would lead to significant harm to the character and appearance of the host property and the streetscape. However, I have also concluded that the proposed balcony to the rear would not lead to significant harm in respect of character and appearance or the living conditions of neighbouring residents.
The proposed balcony would be physically and functionally divisible from the remainder of the proposal. I shall therefore issue a split decision to allow the appeal in relation to the balcony, but dismiss it in relation to the other elements of the proposal.
In addition to the standard time limit condition, I have imposed a condition requiring that the development is carried out in accordance with the approved plans in the interests of certainty. A condition is also required to ensure that external materials match those of the existing building in the interests of character and appearance.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 92No official casework-database value to compare
- Extracted decision date · page 1
- 7 March 2022Matches the official casework database
- Extracted site visit dates
- 14 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3288550
- Application reference
- 21/00907/FUL
- Lead case reference
- Not recorded
- Planning authority
- Wakefield Metropolitan District Council
- Planning authority code
- E08000036
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 40 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 December 2021
- Valid date
- 7 December 2021
- Start date
- 30 December 2021
- Planning authority decision date
- 4 November 2021
- Appeal decision date
- 7 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 11835
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21