Appeal 3288743
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
‘boundary wall’.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The description of development given on the planning application form, decision notice and appeal form is for a ‘boundary wall’. Notwithstanding that description, the submitted plan also shows the layout and elevation details for a pair of gates and the first reason for refusal in the decision notice also refers to the gates.
At my site visit, the boundary wall had been constructed and the gates had been installed. The gates are attached to the stone entrance piers by metal hinges and are an integral part of the proposal before me. I have therefore assessed the impact of the gates as part of the appeal scheme. It follows from this that the appeal proposal is retrospective and I have assessed it on that basis.
Section 04
[name]
The main issues in this case are the effect of the boundary wall and gates on the character and appearance of the area and the effect on the safety of all highway users.
Section 05
Character and appearance
The appeal site is a semi-detached dwelling within the frontage residential development on the north side of [address]. There is considerable variation in the boundary treatments to the road frontage, including timber panel fences set between brick piers, low brick walls and hedges. This, combined with the variety in the dwelling styles and materials contributes to a varied street scene on the north side of the road. Opposite the appeal site, there is a low retaining stone wall along [address] which encloses a wooded area to the north of the new development at City Fields. The wall is in poor condition with a missing section close to the A6194/[address] junction and a collapsed area further to the west.
The boundary wall and piers have been constructed to a height of approximately 2 metres in coursed stone in a predominantly buff colour, but with some darker coloured inserts and a flat coping. They have been built to a good standard. Nos 71 and [address] to either side of the appeal property have timber fences to their front boundaries. Due to the variation in the height and materials of the front boundary treatments in the surrounding area and the stone wall opposite, the appeal scheme does not appear unduly conspicuous or incongruous in the street scene.
The gates are approximately 2.4 metres high with a black cast iron frame and composite infill. Due to their position set back from the piers and their dark, recessive colour they do not have an intrusive or jarring appearance in the street scene.
For these reasons, I find that the wall and gates are appropriate to the context of the site and do not harm the character and appearance of the area. Accordingly, I find no conflict with Policy D9 of the Wakefield Development Policies document (2009) (DP) in so far as it requires new development to make a positive contribution to the amenity of the locality, including through high quality boundary treatment. I also find no conflict with the advice in the Residential Design Guide Supplementary Planning Document (2018) (SPD) that new boundary treatments should be guided by the predominant type in the locality. The National Planning Policy Framework’s provision to secure high quality design as part of sustainable development is also met.
Section 06
Highway safety
The A642 [address] is a classified road with a 30 mph speed limit. It is accessed off the A6194, which serves the City Fields development, via a ‘T’ junction to the north-east of the appeal dwelling. [address] is a busy arterial route connected to the A650 and A61 to the north of Wakefield. There are waiting restrictions on both sides of the road, with double yellow lines outside the appeal site.
There is nothing in the evidence to confirm the visibility distances at the junction of the appeal dwelling’s access with [address]. However, it was clear from my site visit that, due to the position and height of the front wall and the layout of the splays, the junction does not meet the visibility standards set out in the Highway Design Guide Supplementary Planning Document (2018) (SPD) which is based on the Manual for Streets1. The SPD states that consideration should be given to the absence of wide visibility splays at minor accesses/driveways and, in considering whether this would be appropriate, the frequency of vehicle movements, the amount of pedestrian activity and the width of the footway should be taken into account.
There is sufficient space within the site to enable vehicles to enter and exit in a forward gear. [address] is straight in both directions with a 1.5 metre wide footway outside the appeal dwelling. At my site visit when exiting the access, oncoming vehicles on the north-east bound carriageway were visible at 1 Manual for Streets Department for Transport (2007) and Manual for Streets 2 (2010) sufficient distance to enable me to stop safely to give way to them. Ensuring that vehicles on the south-west bound carriageway are visible at sufficient distance so that right turning movements can be made safely will depend on identifying a gap in the traffic on the north-east bound carriageway, but for the reasons outlined, I consider that this can be safely achieved.
Intervisibility between drivers exiting the access and pedestrians is more restricted. However, the number of vehicle movements generated by the occupiers of and visitors to one dwelling is likely to be low. Furthermore, drivers are likely to be familiar with the access and will therefore be likely to exercise caution to ensure that pedestrians and vehicles can be observed at sufficient distance to give way to them when exiting the driveway. Vehicle speeds are restricted by the 30mph limit and due to the waiting restrictions outside the appeal property, visibility will not be impaired by parked vehicles. Overall, having regard to the guidance set out in the SPD and the circumstances of the appeal site, I conclude that the absence of wide visibility splays does not cause material harm to the safety of highway users.
The Highway Design Guide SPD also states that gates should be set back at least 5 metres from the back edge of the footway. Although they are inward opening, the gates are approximately 3 metres from the back edge of the footway and 4.5 metres from the edge of the carriageway. If the gates are closed or in the process of opening, a driver entering the access will have to either wait in the road carriageway until they are fully opened, or turn into the entrance and wait for them to open.
Vehicles waiting on the road carriageway would cause an obstruction to the free flow of traffic on the north-east bound carriageway and cyclists or drivers behind the waiting vehicle may attempt to manoeuvre around it. This would be likely to lead to conflicting movements with vehicles travelling in the opposite direction, to the detriment of the safety of highway users.
Drivers turning into the entrance to wait for the gates to open will obstruct the pavement for a period of time and longer vehicles, such as an estate car, will also overhang into the carriageway. Whilst the frequency of vehicle movements generated by the occupiers of and visitors to one dwelling is likely to be limited, the wait would be inconvenient for and detrimental to the safety of pedestrians, particularly for those with mobility or sight difficulties. Pedestrians may seek to move around the obstruction via the carriageway which would be likely to conflict with other vehicular and cycle movements, leading to situations that would be detrimental to the safety of all users.
Whilst the appellant indicates that the gates can be opened remotely by use of a mobile phone, this cannot be guaranteed in every instance, including when there are deliveries or visitors to the property. A planning condition requiring the gates to be open in such instances would be difficult to monitor and enforce. Therefore, it would not meet the tests for conditions in the Planning Practice Guidance (PPG) which require that conditions are enforceable and reasonable. The PPG also states that ‘unreasonable conditions cannot be used to make development that is unacceptable in planning terms acceptable’.
I have had regard to the point that the gates in front of other dwellings in the road do not comply with the set-back distance recommended in the SPD. However, I am required to determine this appeal based on the circumstances of the site and the details of the proposal before me. The lack of compliance in other instances does not justify development that is harmful to highway safety.
For these reasons, I conclude that the appeal scheme is harmful to the safety of highway users. The development conflicts with DP Policy D14 in so far as it seeks to ensure the safe and free flow of traffic on the highway network and to provide adequate layout to allow for safe access. There would also be conflict with the SPD guidance that proposals should operate safely and satisfactorily.
Section 07
Other Matters
The Highway Authority indicates that the wall has been constructed on the highway verge which was approximately 3 metres in width. There is nothing in the evidence to confirm when the wall was constructed and the appellant has not served notice on any other owner in Part 11 of the planning application form. I am therefore unable to comment further on this matter which is for the Highway Authority to resolve.
Section 08
Conclusion
Drawing matters together, I have concluded that the boundary wall and gates are not harmful to the character and appearance of the area. However, this does not outweigh the harm to the safety of highway users and the conflict with the development plan in that regard. [name] recognise that the appellant wishes to make the dwelling more secure, that does not outweigh the harm I have identified.
For the reasons outlined above and having had regard to all other matters raised, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1206No official casework-database value to compare
- Extracted decision date · page 1
- 22 February 2022Matches the official casework database
- Extracted site visit dates
- 31 January 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3288743
- Application reference
- 20/02852/FUL
- Lead case reference
- Not recorded
- Planning authority
- Wakefield Metropolitan District Council
- Planning authority code
- E08000036
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 December 2021
- Valid date
- 9 December 2021
- Start date
- 5 January 2022
- Planning authority decision date
- 29 September 2021
- Appeal decision date
- 22 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 11036
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21