Skip to main content
Official casework recordDismissedCurrent release

Appeal 3288760

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

raising ridge height and loft extension with rear dormer window.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Applications for costs

    An application for costs was made by [name] against Manchester City Council. This application is the subject of a separate decision.

  4. Section 05

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the host dwelling and the surrounding area.

  5. Section 06

    Reasons for the Recommendation

    The host dwelling is a previously extended detached dwelling in a residential area characterised by detached dwellings. Properties are generally set back from the main road which gives a spacious and open character to the area with a regular rhythm of dwellings. Although several of the properties have been previously extended, they predominantly retain a hipped roof pattern and are of a similar height. [site address] is located almost opposite the junction with [address] which allows longer range views of the property.

    The appeal proposal would increase the bulk and massing of the roof, including increasing the steepness of the pitches roof to all elevations. The resultant roof, including the crown element would be a bulky and dominant feature which would not reflect the design of the host property. It would be a prominent feature in the streetscene and would harmfully erode the spaciousness of the locality.

    The raising of the roof height and change to the roof pitch would unbalance the property with the roof becoming a dominant, bulky feature which would not reflect the character or appearance of the host property. As a consequence, the contribution that the extended dwelling would make to the character and appearance of the area would be eroded.

    My attention has been drawn to examples of dwellings in the local area with a crown roof. I am unconvinced that these developments are directly comparable to the proposal before me, given that from my observations, they did not appear to have altered the roof pitch or height. In addition, I am not aware of the circumstances that led to their approval including the relevant development plan policies in place at the time. In any event, I have determined this appeal on its own merits based on the site-specific circumstances of the case.

    I conclude that the proposal would harm the character and appearance of the host property and surrounding area and would conflict with policies SP1 and DM1 of the [name] and policies DC1.1 and DC1.2 of the Unitary Development Plan for the City of Manchester which together, amongst other things seeks to ensure that development has regard to the appearance in the street scene and is not excessively bulky and out of character with development in the area

  6. Section 07

    Other Matters

    I note the appellant’s concerns regarding the Council’s handling of the planning application. However, this is a matter that would need to be taken up with the Council in the first instance. In determining this appeal, I am only able to have regard to the planning merits of the case.

  7. Section 08

    Conclusion and Recommendation

    The proposed development conflicts with the development plan as a whole and there are no other considerations, that outweigh this conflict. I therefore recommend that the appeal is dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 157No official casework-database value to compare
    Extracted decision date · page 1
    31 May 2022Matches the official casework database
    Extracted site visit dates
    3 May 2022 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 157No official casework-database value to compare
    Extracted decision date · page 1
    31 May 2022Matches the official casework database
    Extracted site visit dates
    3 May 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3288760
Application reference
131042/FH/2021
Lead case reference
Not recorded
Planning authority
Manchester City Council
Planning authority code
E08000003

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
92 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
9 December 2021
Valid date
9 December 2021
Start date
25 January 2022
Planning authority decision date
21 September 2021
Appeal decision date
31 May 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
15962
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21